15 U.S.C. § 792 — Coal conversion and allocation

submitted 52 years ago by Pub. L. 93-319 to r/title-15-COMMERCE-AND-TRADE · 1,050 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Federal Energy Administrator may require certain powerplants and major fuel-burning installations to use coal, subject to findings about feasibility, supply, reliability, pollution compliance, and notice. The Administrator may allocate coal, and the section sets definitions and expiration dates.

(a) The Administrator must order a powerplant, and may order another major fuel-burning installation, not to burn natural gas or petroleum as its primary energy source if subsection (b) is met and either: (A) on June 22, 1974, or afterward, the plant had, acquired, or was designed with the equipment and ability to burn coal; or (B) subsection (c) requires coal-capable design or construction. (b)(1) An order may issue only if the Administrator finds coal burning instead of petroleum or gas is practicable and consistent with this chapter, coal and transportation will be available while the order operates, and, for a powerplant, the order will not harm service reliability in its area. The order must be rescinded or changed when a requirement no longer holds and may be changed if the changed order complies with this section. (2) For an order ending by June 30, 1975, the Administrator must give public notice and allow written presentations, consult the EPA Administrator, and consider the likelihood of coal permission after that date. The order cannot take effect before the EPA Administrator certifies the earliest compliance date for air-pollution requirements and cannot operate during a period the EPA Administrator certifies under section 1857c–10(d)(3)(B) of title 42. (3) For an order applying after June 30, 1975, or a modification extending one, the Administrator must give public notice and allow oral and written presentations. It cannot take effect until EPA says the plant can burn coal and meet air rules without a compliance extension, or, if EPA does not give that notice, until EPA certifies the earliest compliance date. It cannot operate during an EPA-certified excluded period. (c) The Administrator may require a powerplant or other major fuel-burning installation in early planning, except a combustion gas turbine or combined-cycle unit, to be designed and built to use coal primarily. The Administrator may not impose that requirement if, for a powerplant, it likely would impair reliable or adequate service, or if a reliable coal supply is not expected. The Administrator must consider construction contracts and the owner’s ability to recover resulting capital investment. (d) By rule or order, the Administrator may allocate coal to a plant or installation with an (a) order, or to another person as needed for this chapter. (e) “Powerplant” means a fossil-fuel-fired electric generating unit producing electricity for sale or exchange. “Coal” includes coal derivatives. (f)(1) Authority to issue orders or rules under (a)–(d) ended at midnight December 31, 1978, but a rule or order could take effect before January 1, 1985. (2) Authority to amend, repeal, rescind, modify, or enforce those rules or orders ended at midnight December 31, 1984, but that ending does not affect an administrative or judicial proceeding about an act or omission before January 1, 1985.

the actual law source: uscode.house.gov ↗public domain
(a) Powerplant and fuel burning installations

The Federal Energy Administrator—

(1)

shall, by order, prohibit any powerplant, and

(2)

may, by order, prohibit any major fuel burning installation, other than a powerplant,

from burning natural gas or petroleum products as its primary energy source, if the requirements of subsection (b) are met and if (A) the Federal Energy Administrator determines such powerplant or installation on June 22, 1974, had, or thereafter acquires or is designed with, the capability and necessary plant equipment to burn coal, or (B) such powerplant or installation is required to meet a design or construction requirement under subsection (c).

(b) Prerequisites to issuance or effectiveness of orders prohibiting use of natural gas or petroleum products as primary energy source

The requirements referred to in subsection (a) are as follows:

(1)

An order under subsection (a) may not be issued with respect to a powerplant or installation unless the Federal Energy Administrator finds (A) that the burning of coal by such plant or installation, in lieu of petroleum products or natural gas, is practicable and consistent with the purposes of this chapter, (B) that coal and coal transportation facilities will be available during the period the order is in effect, and (C) in the case of a powerplant, that the prohibition under subsection (a) will not impair the reliability of service in the area served by such plant. Such an order shall be rescinded or modified to the extent the Federal Energy Administrator determines that any requirement described in subparagraph (A), (B), or (C) of this paragraph is no longer met; and such an order may at any time be modified if the Federal Energy Administrator determines that such order, as modified, complies with the requirements of this section.

(2)
(A)

Before issuing an order under subsection (a) which is applicable to a powerplant or installation for a period ending on or before June 30, 1975, the Federal Energy Administrator (i) shall give notice to the public and afford interested persons an opportunity for written presentations of data, views, and arguments, (ii) shall consult with the Administrator of the Environmental Protection Agency, and (iii) shall take into account the likelihood that the powerplant or installation will be permitted to burn coal after June 30, 1975.

(B)

An order described in subparagraph (A) of this paragraph shall not become effective until the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c–10(d)(1)(A) 1 of title 42 is the earliest date that such plant or installation will be able to comply with the air pollution requirements which will be applicable to it. Such order shall not be effective for any period certified by the Administrator of the Environmental Protection Agency pursuant to section 1857c–10(d)(3)(B) 1 of title 42.

(3)
(A)

Before issuing an order under subsection (a) which is applicable to a powerplant or installation after June 30, 1975 (or modifying an order to which paragraph (2) applies, so as to apply such order to a powerplant or installation after such date), the Federal Energy Administrator shall give notice to the public and afford interested persons an opportunity for oral and written presentations of data, views, and arguments.

(B)

An order (or modification thereof) described in subparagraph (A) of this paragraph shall not become effective until (i) the Administrator of the Environmental Protection Agency notifies the Federal Energy Administrator under section 1857c–10(d)(1)(B) 1 of title 42 that such plant or installation will be able on and after July 1, 1975, to burn coal and to comply with all applicable air pollution requirements without a compliance date extension under section 1857c–10(c) 1 of title 42, or (ii) if such notification is not given, the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c–10(d)(1)(B) 1 of title 42 is the earliest date that such plant or installation will be able to comply with all applicable requirements of such 1857c–10 1 of title 42. Such order (or modification) shall not be effective during any period certified by the Administrator of the Environmental Protection Agency under section 1857c–10(d)(3)(B) 1 of title 42.

(c) Construction and design of powerplants or other major fuel burning installations

The Federal Energy Administrator may require that any powerplant or other major fuel burning installation in the early planning process (other than a combustion gas turbine or combined cycle unit) be designed and constructed so as to be capable of using coal as its primary energy source. No powerplant or other major fuel burning installation may be required under this subsection to be so designed and constructed, if the Administrator determines that (1) in the case of a powerplant to do so is likely to result in an impairment of reliability or adequacy of service, or (2) an adequate and reliable supply of coal is not expected to be available. In considering whether to impose a design and construction requirement under this subsection, the Federal Energy Administrator shall consider the existence and effects of any contractual commitment for the construction of such facilities and the capability of the owner to recover any capital investment made as a result of any requirement imposed under this subsection.

(d) Allocation of coal

The Federal Energy Administrator may, by rule or order, allocate coal (1) to any powerplant or major fuel-burning installation to which an order under subsection (a) has been issued, or (2) to any other person to the extent necessary to carry out the purposes of this chapter.

(e) Definitions

For purposes of this section:

(1)

The term “powerplant” means a fossil-fuel fired electric generating unit which produces electric power for purposes of sale or exchange.

(2)

The term “coal” includes coal derivatives.

(f) Expiration of authority; effective dates
(1)

Authority to issue orders or rules under subsections (a) through (d) of this section shall expire at midnight, December 31, 1978. Such a rule or order may take effect at any time before January 1, 1985.

(2)

Authority to amend, repeal, rescind, modify, or enforce such rules or orders shall expire at midnight, December 31, 1984; but the expiration of such authority shall not affect any administrative or judicial proceeding which relates to any act or omission which occurred prior to January 1, 1985.

Source credit: (Pub. L. 93–319, § 2, June 22, 1974, 88 Stat. 246; Pub. L. 94–163, title I, § 101, Dec. 22, 1975, 89 Stat. 875; Pub. L. 95–70, § 7, July 21, 1977, 91 Stat. 277.)

history & why it existsrecord from the source credit
  • 1974Enacted · Pub. L. 93-319 · 88 Stat. 246
  • 1975Amended · Pub. L. 94-163 · 89 Stat. 875
  • 1977Amended · Pub. L. 95-70 · 91 Stat. 277

A history note hasn’t been published yet. The record shows enactment by Pub. L. 93-319 on 1974-06-22.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case