42 U.S.C. § 7475 — Preconstruction requirements

submitted 71 years ago by Pub. L. 95-95 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 2,042 words · no verdicts yet

in plain englishAI-generated · not legal advice

A company must get a permit before building a major new polluting facility in a clean-air area. That permit must meet eight strict conditions, including pollution modeling and public hearings. Federal land managers can block permits that would harm protected class I areas. States must decide on completed permit applications within one year.

(a) Major emitting facilities on which construction is commenced: No major polluting facility whose construction starts after August 7, 1977, can be built in an area covered by this part unless all eight of these are true:
(1) a permit has been issued for the facility that sets emission limits following this part's rules;
(2) the proposed permit went through the review process in this section, including required analysis under EPA regulations and a public hearing where anyone - including EPA representatives - could speak about the facility's air quality impact, alternatives, control technology, and other relevant issues;
(3) the facility's owner or operator proves, as section 7410(j) requires, that building or running the facility will not cause pollution above (A) the maximum allowable increase or concentration for any pollutant, more than once a year, (B) the national ambient air quality standard for the region, or (C) any other applicable emission standard under this chapter;
(4) the facility uses the best available control technology for every regulated pollutant it emits;
(5) the facility meets subsection (d)'s requirements for protecting class I areas;
(6) there has been an analysis of the air quality impact from growth the facility would cause in the area;
(7) the owner or operator agrees to monitor the facility's effect on air quality in any area the emissions might reach; and
(8) if the facility is proposed for a class III area and would push pollution above what a class II area allows - and no performance standard has been set for that kind of source since August 7, 1977 - the Administrator has approved the facility's best-available-technology plan.

(b) Exception: The proof required under (a)(3) about maximum allowable increases does not apply to class II areas when a facility that already existed on August 7, 1977 is being expanded or modified, as long as: after meeting the technology requirement in (a)(4), the facility's allowed emissions will be under 50 tons per year, and the owner proves particulate matter and sulfur oxide emissions will not push air quality above the national secondary standard for those pollutants.

(c) Permit applications: Any completed permit application under section 7410 for a major polluting facility in a covered area must be granted or denied within one year of the date it was filed.

(d) Action on permit applications:
(1) Each state must send the EPA Administrator a copy of every permit application it receives for a major polluting facility, and notify the Administrator of every action taken on it.
(2)(A) The Administrator must notify the Federal Land Manager and the federal official responsible for managing any class I land that the proposed facility might affect.
(B) That Federal Land Manager and official have a duty to protect the air-quality-related values (including visibility) of that land, and must work with the Administrator to consider whether the facility would hurt those values.
(C)(i) If the responsible federal official, Federal Land Manager, the Administrator, or the governor of a nearby state with a class I area formally alleges that the facility may harm that area's air quality, the permit cannot be issued unless the owner proves particulate matter and sulfur dioxide emissions will not push concentrations above the class I maximum increases.
(ii) If the Federal Land Manager proves to the state that the facility would hurt the land's air-quality-related values (including visibility) - even if pollution stays under the class I maximum increases - the permit still cannot be issued.
(iii) If the owner proves to the Federal Land Manager's satisfaction - and the Manager certifies it - that the facility will not hurt those values, the state may issue the permit even if pollution would exceed the class I maximum increases.
(iv) A permit issued this way must still include limits ensuring sulfur oxide and particulate matter do not exceed these higher increases (in micrograms per cubic meter): particulate matter annual average 19, 24-hour maximum 37; sulfur dioxide annual average 20, 24-hour maximum 91, 3-hour maximum 325.
(D)(i) If an owner was denied certification under (C)(iii), the owner can ask the governor for a variance. After notice and a public hearing, if the governor finds the facility cannot be built because of the 24-hour-or-shorter sulfur dioxide limit for a class I area - and, for federal mandatory class I areas, finds the variance will not hurt the area's air-quality values - the governor may grant a variance, with the Federal Land Manager's recommendation considered and, where required, agreed to.
(ii) If the Federal Land Manager disagrees with the governor's recommended variance, both recommendations go to the President, who can approve the governor's recommendation only if it serves the national interest. That Presidential decision cannot be reviewed by any court. The President must approve or deny it within 90 days of receiving both recommendations.
(iii) A permit issued under this variance must still keep 24-hour and 3-hour sulfur oxide increases from exceeding set limits (in micrograms per cubic meter) - low terrain areas: 24-hour max 36, 3-hour max 130; high terrain areas: 24-hour max 62, 3-hour max 221 - and cannot let the normal maximum increases be exceeded on more than 18 days per year.
(iv) A "high terrain area" is any area 900 feet or more above the base of the facility's stack; a "low terrain area" is any other area.

(e) Analysis:
(1) The review under (a) must be preceded by an analysis, following EPA regulations, of the air quality at the proposed site and in nearby areas the facility might affect, for every pollutant it will emit. The state, a local government, or the applicant itself can conduct this analysis.
(2) Starting one year after August 7, 1977, this analysis must include continuous air quality monitoring data showing whether the facility's emissions would exceed the maximum allowable increases or concentrations. This data must normally be gathered over the full calendar year before the permit application, unless the state decides - following EPA rules - that a shorter period is enough. The results must be ready by the public hearing.
(3) Within six months of August 7, 1977, the Administrator must issue regulations for this analysis that: (A) do not require any automatic or uniform buffer zone; (B) require analyzing air quality, climate, weather, terrain, soil, vegetation, and visibility at the site and nearby areas for every regulated pollutant the facility would emit, plus the facility's size, how much continuous emission reduction it could achieve, and other relevant factors; (C) require the analysis results to be ready by the public hearing; and (D) specify exactly which air quality models to use under which conditions. The Administrator can adjust a designated model, after notice and a hearing, if unique terrain or weather in the affected area makes that necessary.

the actual law source: uscode.house.gov ↗public domain
(a) Major emitting facilities on which construction is commenced

No major emitting facility on which construction is commenced after August 7, 1977, may be constructed in any area to which this part applies unless—

(1)

a permit has been issued for such proposed facility in accordance with this part setting forth emission limitations for such facility which conform to the requirements of this part;

(2)

the proposed permit has been subject to a review in accordance with this section, the required analysis has been conducted in accordance with regulations promulgated by the Administrator, and a public hearing has been held with opportunity for interested persons including representatives of the Administrator to appear and submit written or oral presentations on the air quality impact of such source, alternatives thereto, control technology requirements, and other appropriate considerations;

(3)

the owner or operator of such facility demonstrates, as required pursuant to section 7410(j) of this title, that emissions from construction or operation of such facility will not cause, or contribute to, air pollution in excess of any (A) maximum allowable increase or maximum allowable concentration for any pollutant in any area to which this part applies more than one time per year, (B) national ambient air quality standard in any air quality control region, or (C) any other applicable emission standard or standard of performance under this chapter;

(4)

the proposed facility is subject to the best available control technology for each pollutant subject to regulation under this chapter emitted from, or which results from, such facility;

(5)

the provisions of subsection (d) with respect to protection of class I areas have been complied with for such facility;

(6)

there has been an analysis of any air quality impacts projected for the area as a result of growth associated with such facility;

(7)

the person who owns or operates, or proposes to own or operate, a major emitting facility for which a permit is required under this part agrees to conduct such monitoring as may be necessary to determine the effect which emissions from any such facility may have, or is having, on air quality in any area which may be affected by emissions from such source; and

(8)

in the case of a source which proposes to construct in a class III area, emissions from which would cause or contribute to exceeding the maximum allowable increments applicable in a class II area and where no standard under section 7411 of this title has been promulgated subsequent to August 7, 1977, for such source category, the Administrator has approved the determination of best available technology as set forth in the permit.

(b) Exception

The demonstration pertaining to maximum allowable increases required under subsection (a)(3) shall not apply to maximum allowable increases for class II areas in the case of an expansion or modification of a major emitting facility which is in existence on August 7, 1977, whose allowable emissions of air pollutants, after compliance with subsection (a)(4), will be less than fifty tons per year and for which the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur oxides will not cause or contribute to ambient air quality levels in excess of the national secondary ambient air quality standard for either of such pollutants.

(c) Permit applications

Any completed permit application under section 7410 of this title for a major emitting facility in any area to which this part applies shall be granted or denied not later than one year after the date of filing of such completed application.

(d) Action taken on permit applications; notice; adverse impact on air quality related values; variance; emission limitations
(1)

Each State shall transmit to the Administrator a copy of each permit application relating to a major emitting facility received by such State and provide notice to the Administrator of every action related to the consideration of such permit.

(2)
(A)

The Administrator shall provide notice of the permit application to the Federal Land Manager and the Federal official charged with direct responsibility for management of any lands within a class I area which may be affected by emissions from the proposed facility.

(B)

The Federal Land Manager and the Federal official charged with direct responsibility for management of such lands shall have an affirmative responsibility to protect the air quality related values (including visibility) of any such lands within a class I area and to consider, in consultation with the Administrator, whether a proposed major emitting facility will have an adverse impact on such values.

(C)
(i)

In any case where the Federal official charged with direct responsibility for management of any lands within a class I area or the Federal Land Manager of such lands, or the Administrator, or the Governor of an adjacent State containing such a class I area files a notice alleging that emissions from a proposed major emitting facility may cause or contribute to a change in the air quality in such area and identifying the potential adverse impact of such change, a permit shall not be issued unless the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur dioxide will not cause or contribute to concentrations which exceed the maximum allowable increases for a class I area.

(ii)

In any case where the Federal Land Manager demonstrates to the satisfaction of the State that the emissions from such facility will have an adverse impact on the air quality-related values (including visibility) of such lands, notwithstanding the fact that the change in air quality resulting from emissions from such facility will not cause or contribute to concentrations which exceed the maximum allowable increases for a class I area, a permit shall not be issued.

(iii)

In any case where the owner or operator of such facility demonstrates to the satisfaction of the Federal Land Manager, and the Federal Land Manager so certifies, that the emissions from such facility will have no adverse impact on the air quality-related values of such lands (including visibility), notwithstanding the fact that the change in air quality resulting from emissions from such facility will cause or contribute to concentrations which exceed the maximum allowable increases for class I areas, the State may issue a permit.

(iv)

In the case of a permit issued pursuant to clause (iii), such facility shall comply with such emission limitations under such permit as may be necessary to assure that emissions of sulfur oxides and particulates from such facility will not cause or contribute to concentrations of such pollutant which exceed the following maximum allowable increases over the baseline concentration for such pollutants:

Maximum allowable increase (in micrograms per cubic meter)

Particulate matter:

Annual geometric mean

19  

Twenty-four-hour maximum

37  

Sulfur dioxide:

Annual arithmetic mean

20  

Twenty-four-hour maximum

91  

Three-hour maximum

325  

(D)
(i)

In any case where the owner or operator of a proposed major emitting facility who has been denied a certification under subparagraph (C)(iii) demonstrates to the satisfaction of the Governor, after notice and public hearing, and the Governor finds, that the facility cannot be constructed by reason of any maximum allowable increase for sulfur dioxide for periods of twenty-four hours or less applicable to any class I area and, in the case of Federal mandatory class I areas, that a variance under this clause will not adversely affect the air quality related values of the area (including visibility), the Governor, after consideration of the Federal Land Manager’s recommendation (if any) and subject to his concurrence, may grant a variance from such maximum allowable increase. If such variance is granted, a permit may be issued to such source pursuant to the requirements of this subparagraph.

(ii)

In any case in which the Governor recommends a variance under this subparagraph in which the Federal Land Manager does not concur, the recommendations of the Governor and the Federal Land Manager shall be transmitted to the President. The President may approve the Governor’s recommendation if he finds that such variance is in the national interest. No Presidential finding shall be reviewable in any court. The variance shall take effect if the President approves the Governor’s recommendations. The President shall approve or disapprove such recommendation within ninety days after his receipt of the recommendations of the Governor and the Federal Land Manager.

(iii)

In the case of a permit issued pursuant to this subparagraph, such facility shall comply with such emission limitations under such permit as may be necessary to assure that emissions of sulfur oxides from such facility will not (during any day on which the otherwise applicable maximum allowable increases are exceeded) cause or contribute to concentrations which exceed the following maximum allowable increases for such areas over the baseline concentration for such pollutant and to assure that such emissions will not cause or contribute to concentrations which exceed the otherwise applicable maximum allowable increases for periods of exposure of 24 hours or less on more than 18 days during any annual period:

MAXIMUM ALLOWABLE INCREASE

(In micrograms per cubic meter)

Period of exposure

Low

terrain areas

High

terrain areas

24-hr maximum

36

62

3-hr maximum

130

221

(iv)

For purposes of clause (iii), the term “high terrain area” means with respect to any facility, any area having an elevation of 900 feet or more above the base of the stack of such facility, and the term “low terrain area” means any area other than a high terrain area.

(e) Analysis; continuous air quality monitoring data; regulations; model adjustments
(1)

The review provided for in subsection (a) shall be preceded by an analysis in accordance with regulations of the Administrator, promulgated under this subsection, which may be conducted by the State (or any general purpose unit of local government) or by the major emitting facility applying for such permit, of the ambient air quality at the proposed site and in areas which may be affected by emissions from such facility for each pollutant subject to regulation under this chapter which will be emitted from such facility.

(2)

Effective one year after August 7, 1977, the analysis required by this subsection shall include continuous air quality monitoring data gathered for purposes of determining whether emissions from such facility will exceed the maximum allowable increases or the maximum allowable concentration permitted under this part. Such data shall be gathered over a period of one calendar year preceding the date of application for a permit under this part unless the State, in accordance with regulations promulgated by the Administrator, determines that a complete and adequate analysis for such purposes may be accomplished in a shorter period. The results of such analysis shall be available at the time of the public hearing on the application for such permit.

(3)

The Administrator shall within six months after August 7, 1977, promulgate regulations respecting the analysis required under this subsection which regulations—

(A)

shall not require the use of any automatic or uniform buffer zone or zones,

(B)

shall require an analysis of the ambient air quality, climate and meteorology, terrain, soils and vegetation, and visibility at the site of the proposed major emitting facility and in the area potentially affected by the emissions from such facility for each pollutant regulated under this chapter which will be emitted from, or which results from the construction or operation of, such facility, the size and nature of the proposed facility, the degree of continuous emission reduction which could be achieved by such facility, and such other factors as may be relevant in determining the effect of emissions from a proposed facility on any air quality control region,

(C)

shall require the results of such analysis shall be available at the time of the public hearing on the application for such permit, and

(D)

shall specify with reasonable particularity each air quality model or models to be used under specified sets of conditions for purposes of this part.

Any model or models designated under such regulations may be adjusted upon a determination, after notice and opportunity for public hearing, by the Administrator that such adjustment is necessary to take into account unique terrain or meteorological characteristics of an area potentially affected by emissions from a source applying for a permit required under this part.

Source credit: (July 14, 1955, ch. 360, title I, § 165, as added Pub. L. 95–95, title I, § 127(a), Aug. 7, 1977, 91 Stat. 735; amended Pub. L. 95–190, § 14(a)(44)–(51), Nov. 16, 1977, 91 Stat. 1402.)

history & why it existsrecord from the source credit
  • 1955Enacted · Pub. L. 95-95 · 91 Stat. 735
  • 1977Amended · Pub. L. 95-190 · 91 Stat. 1402

A history note hasn’t been published yet. The record shows enactment by Pub. L. 95-95 on 1955-07-14.