This law lets certain sulfur dioxide sources opt into the Clean Air Act's allowance program. The EPA sets baseline emissions and issues yearly pollution allowances to approved units. It also grants special allowances to owners or operators of small refineries that cut sulfur from diesel fuel from 1993 to 1999.

(a) Applicability: The owner or operator of a unit that isn't already an affected unit under sections 7651b, 7651c, or 7651d, or that is a "process source" under subsection (d), and that emits sulfur dioxide, can choose to make that unit or source become an affected unit and get allowances under this subchapter. They submit the election to the Administrator (EPA) with a permit application and compliance plan under section 7651g. The Administrator must approve an election that meets this section's requirements, and the newly designated unit or source then receives allowances and counts as an affected unit.

(b) Establishment of baseline: EPA sets, by regulation, a baseline for the designated unit based on its fuel use and operating data for 1985-1987. If that data isn't available, EPA can use other representative data instead.

(c) Emission limitations: The annual sulfur dioxide limit equals the baseline times the lower of the unit's actual or allowable 1985 emission rate (in pounds per million Btu) — or, if it didn't operate in 1985, the lower of its actual or allowable rate for a later year EPA picks — divided by 2,000.

(d) Process sources: Within 18 months of November 15, 1990, EPA must set up a program letting owners or operators of "process sources" that emit sulfur dioxide elect to become affected units too. EPA must define by regulation which sources qualify, set the emissions limit, spell out what operating, baseline, and other data are required, require continuous emissions monitoring (CEMS) or other monitoring, and issue permit, reporting, and other rules needed to run the program.

(e) Allowances and permits: EPA issues allowances to a unit designated under this section equal to the limit calculated under (c) or (d), following section 7651b's rules. Those allowances can be used and are governed by section 7651b. Sources designated under this section must also follow sections 7651b, 7651g, 7651j, 7651k, 7651l, and 7651m.

(f) Limitation: A unit designated under this section can't transfer or bank allowances it earns by cutting back or shutting down, unless the cutback happened because the unit's heat (thermal energy) was replaced by another subchapter-covered unit, and the designated unit's allowances go to that replacement unit instead. EPA can never give a designated source more allowances than the emissions it would produce running in full compliance with the Act, and none of these allowances excuse violating any other requirement.

(g) Implementation: EPA must issue regulations to carry out this section within 18 months of November 15, 1990.

(h) Small diesel refineries: EPA must give allowances to owners or operators of small diesel refineries that make diesel fuel meeting section 7545(i)'s requirements after October 1, 1993. This subsection covers six points: (1) Allowance period: Allowances are only for October 1, 1993 through December 31, 1999. (2) Allowance determination: The number of allowances equals the yearly pounds of sulfur dioxide cut by desulfurizing the fuel at a small refinery, divided by 2,000. For this math, the sulfur removed counts as the difference between 0.274% and 0.050% by weight. (3) Refinery eligibility: A "small refinery" is one that, as of November 15, 1990, processed less than 18,250,000 barrels of crude oil a year (as reported to the Department of Energy), and was owned or controlled by a refiner whose combined throughput was less than 50,187,500 barrels a year. (4) Limitation per refinery: No small refinery can get more than 1,500 allowances a year under this subsection. (5) Limitation on total: The combined allowances given out under this subsection in any year can't exceed 35,000. (6) Required certification: EPA can't give any of these allowances unless the owner or operator of a small diesel refinery certifies that all the diesel fuel it made and claimed allowances for, including off-highway diesel, met section 7545(i)'s requirements.

the actual law source: uscode.house.gov ↗public domain
(a) Applicability

The owner or operator of any unit that is not, nor will become, an affected unit under section 7651b(e), 7651c, or 7651d of this title, or that is a process source under subsection (d), that emits sulfur dioxide, may elect to designate that unit or source to become an affected unit and to receive allowances under this subchapter. An election shall be submitted to the Administrator for approval, along with a permit application and proposed compliance plan in accordance with section 7651g of this title. The Administrator shall approve a designation that meets the requirements of this section, and such designated unit, or source, shall be allocated allowances, and be an affected unit for purposes of this subchapter.

(b) Establishment of baseline

The baseline for a unit designated under this section shall be established by the Administrator by regulation, based on fuel consumption and operating data for the unit for calendar years 1985, 1986, and 1987, or if such data is not available, the Administrator may prescribe a baseline based on alternative representative data.

(c) Emission limitations

Annual emissions limitations for sulfur dioxide shall be equal to the product of the baseline multiplied by the lesser of the unit’s 1985 actual or allowable emission rate in lbs/mmBtu, or, if the unit did not operate in 1985, by the lesser of the unit’s actual or allowable emission rate for a calendar year after 1985 (as determined by the Administrator), divided by 2,000.

(d) Process sources

Not later than 18 months after November 15, 1990, the Administrator shall establish a program under which the owner or operator of a process source that emits sulfur dioxide may elect to designate that source as an affected unit for the purpose of receiving allowances under this subchapter. The Administrator shall, by regulation, define the sources that may be designated; specify the emissions limitation; specify the operating, emission baseline, and other data requirements; prescribe CEMS or other monitoring requirements; and promulgate permit, reporting, and any other requirements necessary to implement such a program.

(e) Allowances and permits

The Administrator shall issue allowances to an affected unit under this section in an amount equal to the emissions limitation calculated under subsection (c) or (d), in accordance with section 7651b of this title. Such allowance may be used in accordance with, and shall be subject to, the provisions of section 7651b of this title. Affected sources under this section shall be subject to the requirements of sections 7651b, 7651g, 7651j, 7651k, 7651l, and 7651m of this title.

(f) Limitation

Any unit designated under this section shall not transfer or bank allowances produced as a result of reduced utilization or shutdown, except that, such allowances may be transferred or carried forward for use in subsequent years to the extent that the reduced utilization or shutdown results from the replacement of thermal energy from the unit designated under this section, with thermal energy generated by any other unit or units subject to the requirements of this subchapter, and the designated unit’s allowances are transferred or carried forward for use at such other replacement unit or units. In no case may the Administrator allocate to a source designated under this section allowances in an amount greater than the emissions resulting from operation of the source in full compliance with the requirements of this chapter. No such allowances shall authorize operation of a unit in violation of any other requirements of this chapter.

(g) Implementation

The Administrator shall issue regulations to implement this section not later than eighteen months after November 15, 1990.

(h) Small diesel refineries

The Administrator shall issue allowances to owners or operators of small diesel refineries who produce diesel fuel after October 1, 1993, meeting the requirements of subsection 1 7545(i) of this title.

(1) Allowance period

Allowances may be allocated under this subsection only for the period from October 1, 1993, through December 31, 1999.

(2) Allowance determination

The number of allowances allocated pursuant to this paragraph shall equal the annual number of pounds of sulfur dioxide reduction attributable to desulfurization by a small refinery divided by 2,000. For the purposes of this calculation, the concentration of sulfur removed from diesel fuel shall be the difference between 0.274 percent (by weight) and 0.050 percent (by weight).

(3) Refinery eligibility

As used in this subsection, the term “small refinery” shall mean a refinery or portion of a refinery—

(A)

which, as of November 15, 1990, has bona fide crude oil throughput of less than 18,250,000 barrels per year, as reported to the Department of Energy, and

(B)

which, as of November 15, 1990, is owned or controlled by a refiner with a total combined bona fide crude oil throughput of less than 50,187,500 barrels per year, as reported to the Department of Energy.

(4) Limitation per refinery

The maximum number of allowances that can be annually allocated to a small refinery pursuant to this subsection is one thousand and five hundred.

(5) Limitation on total

In any given year, the total number of allowances allocated pursuant to this subsection shall not exceed thirty-five thousand.

(6) Required certification

The Administrator shall not allocate any allowances pursuant to this subsection unless the owner or operator of a small diesel refinery shall have certified, at a time and in a manner prescribed by the Administrator, that all motor diesel fuel produced by the refinery for which allowances are claimed, including motor diesel fuel for off-highway use, shall have met the requirements of subsection 1 7545(i) of this title.

Source credit: (July 14, 1955, ch. 360, title IV, § 410, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2621.)

history & why it existsrecord from the source credit
  • 1955Enacted · Pub. L. 101-549 · 104 Stat. 2621

A history note hasn’t been published yet. The record shows enactment by Pub. L. 101-549 on 1955-07-14.