43 U.S.C. § 485h — New projects; sale of water and electric power; lease of power privileges
submitted 87 years ago by ch. 418 to r/title-43-PUBLIC-LANDS · 2,774 words · no verdicts yet
This section lets the Secretary of the Interior investigate and build new reclamation projects. Before spending money, the Secretary must report findings on cost, feasibility, and who repays each part. The Secretary may also sell water and power, and lease power privileges. Public notice is required before signing most water contracts.
(a) Findings of Secretary*. The Secretary can't spend money on, or even submit cost estimates for, building a new project*, a new division of a project*, or new supplemental works, until investigating it and reporting findings to the President and Congress on: (1) whether the proposed construction is feasible to engineer; (2) its estimated cost; (3) the part of that cost fairly allocated to irrigation and probably repayable by water users; (4) the part fairly allocated to power and probably returnable to the United States as net power revenue; and (5) the part fairly allocated to municipal water supply or other miscellaneous purposes and probably returnable to the United States. If the Secretary finds the construction has engineering feasibility, and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other purposes — together with any allocation to flood control or navigation made under subsection (b) — equal the total estimated construction cost as the Secretary determines it, the project is deemed authorized and the Secretary may undertake it. If all those allocations don't equal the total estimated cost, the project may be undertaken only after Congress provides for it by Act, once the Secretary has submitted the report and findings to the President and Congress.
(b) Allocation of part of cost to flood control or navigation. The Secretary may allocate to flood control or navigation whatever part of a new project's total estimated cost the Secretary finds proper. Items for such allocations, for projects proceeding under subsection (a), must be included in the Secretary's appropriation estimates, and the funds for those portions become available only if directly appropriated or allotted to the Department of the Interior. In making such an allocation, the Secretary must consult the Chief of Engineers and the Secretary of the Army, and may perform necessary investigations or studies under a cooperative agreement with the Secretary of the Army. Where such an allocation is made, the Secretary of the Interior operates the project for flood-control or navigation purposes, to the extent that allocation justifies.
(c) Furnishing water to municipalities; sale of electric power; lease of power privileges.
(1) The Secretary may contract to furnish water for municipal water supply or miscellaneous purposes. Any such contract must either: (A) require repayment to the United States, over up to forty years from when water is first delivered for the contracting party's use, with interest of up to 3½ percent a year if the Secretary decides interest is proper, of an appropriate share (as the Secretary determines) of construction costs allocated to municipal water supply or other miscellaneous purposes; or (B) run for up to forty years, at rates that, in the Secretary's judgment, will produce revenues at least sufficient to cover an appropriate share of yearly operation-and-maintenance cost and appropriate fixed charges the Secretary sets, paid each year in advance of that year's water delivery. Any sale of electric power, or lease of power privileges, that the Secretary makes while operating a project or division must likewise run for up to forty years, at rates meant to produce power revenue at least sufficient to cover an appropriate share of yearly operation-and-maintenance cost, interest of at least 3 percent a year on an appropriate share of the construction investment, and other fixed charges the Secretary sets. In such sales or leases, preference goes to municipalities and other public corporations or agencies, and to cooperatives and other nonprofit organizations financed in whole or part by loans under the Rural Electrification Act of 1936. This paragraph doesn't apply to provisions in existing lawful contracts for using a project's power and miscellaneous revenues to benefit its water users. This paragraph's provisions on power sales and power-privilege leases are an authorization in addition to, and alternative to, authority under other laws for particular projects, and reserve to the Secretary the exclusive authority to develop small conduit hydropower using Bureau of Reclamation facilities, and pumped-storage hydropower using only Bureau of Reclamation reservoirs. No contract relating to municipal water supply or miscellaneous purposes, or to electric power or power privileges, may be made if, in the Secretary's judgment, it would impair the project's efficiency for irrigation.
(2) When carrying out this subsection, the Secretary must first offer a lease of power privilege to the irrigation district or water users association operating the relevant transferred conduit, or receiving water from the relevant reserved conduit, and must set a reasonable time frame for that district or association to accept or reject a small conduit hydropower lease offer. If the district or association declines, the Secretary offers the lease to other parties in accordance with this subsection.
(3) The Bureau of Reclamation must apply its categorical-exclusion process under the National Environmental Policy Act of 1969 to small conduit hydropower development under this subsection, excluding the siting of associated transmission facilities on federal lands.
(4) The Bureau of Reclamation's Power Resources Office is the lead office for small conduit hydropower policy and procedure-setting under this subsection.
(5) Nothing in this subsection obligates the Western Area Power Administration, the Bonneville Power Administration, or the Southwestern Power Administration to purchase or market power produced by facilities covered here, and none of the costs of producing or delivering that power may be assigned to project purposes for inclusion in project rates.
(6) Nothing in this subsection alters or impedes how Bureau of Reclamation facilities deliver and manage water — water used for conduit hydropower generation is treated as incidental to using water for the project's original purposes. A lease of power privilege is made only when, in the Secretary's judgment, exercising it won't conflict with the purposes of the project or division involved, and won't create unmitigated financial or physical harm to it. The Secretary must notify and consult the irrigation district or water users association operating the transferred conduit before offering the lease, and must prescribe terms and conditions adequately protecting the planning, design, construction, operation, maintenance, and other interests of the United States and the project or division.
(7) Nothing in this subsection alters or affects any existing agreements for developing conduit hydropower projects or dividing their revenue.
(8) Nothing in this subsection alters or affects any existing preliminary permit, license, or exemption the Federal Energy Regulatory Commission issued under Part I of the Federal Power Act, or any project with an application still pending before the Commission as of August 9, 2013.
(9) Definitions for this subsection: "Conduit" means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar built water conveyance operated mainly to distribute water for agricultural, municipal, or industrial use, not mainly to generate electricity. "Irrigation district" means any irrigation, water conservation or conservancy, or multicounty water conservation or conservancy district, or any separate public entity made up of two or more such districts jointly exercising their member districts' powers. "Reserved conduit" means a conduit in project works whose care, operation, and maintenance the Secretary — through the Commissioner of the Bureau of Reclamation — has reserved. "Transferred conduit" means a conduit in project works whose care, operation, and maintenance has been transferred to a legally organized water users association or irrigation district. "Small conduit hydropower" means a facility capable of producing 5 megawatts or less of electric capacity.
(d) Delivery of water for irrigation; repayment contract* prerequisites. No water may be delivered for irrigating land on a new project, new division of a project, or supplemental works, until an organization* satisfactory to the Secretary in form and powers has entered a repayment contract with the United States, satisfactory in form to the Secretary, providing, among other things:
(1) That the Secretary may fix a development period of up to ten years for each irrigation block*, counted from the first calendar year water is delivered to that block's land; and that during the development period, water is delivered to that block's land at a per-acre-foot (or other) charge the Secretary fixes each year and that must be paid in advance. Where an irrigation block's land is mostly owned by the United States, the Secretary may fix a development period before signing the repayment contract, but then signing the contract becomes a condition of getting water after the development period closes. If the Secretary had fixed a development period shorter than ten years, and before repayment begins conditions arise that in the Secretary's judgment would have justified a longer period, the Secretary may amend the contract or notice to extend the development period to no more than ten years from its start — and may do the same by amendment where no development period was originally provided. If the Secretary had deferred payment of construction-charge installments under the Act of September 21, 1959, the Secretary may, before the due date of the first installment not reduced by that deferment, agree with the contracting organization to end the supplemental deferment contract, credit the construction payments made, and instead use the authority granted in this section. After the development period closes, any charges collected that the Secretary determines exceeded the cost of operation and maintenance during that period are credited to the project's construction cost, as the Secretary determines.
(2) That the part of construction costs the Secretary allocates to irrigation is included in the organization's general repayment obligation, and that the organization may vary how it distributes construction charges* across its land based on the productivity of different land classes and the benefits construction brings them — but no such distribution relieves the organization, or any party or land within it, of the organization's general obligation to the United States.
(3) That the organization's general repayment obligation is spread in annual installments — however many and however large the Secretary fixes — over no more than 40 years (not counting any development period fixed under paragraph (1)), for each project contract unit* or, if divided into irrigation blocks, for each block — or as close to that 40-year period as fits a variable-payment formula that, while based on full repayment within that period under average conditions, allows required annual payments to vary based on the organization's ability to pay.
(4) That the first annual installment for a project contract unit or irrigation block accrues, on a date the Secretary fixes, in the year after the development period's last year, or, if there is no development period, in the calendar year after the Secretary announces that construction is substantially complete or advanced enough to deliver water to substantially all the land to be irrigated in that unit or block; and that if no development period was fixed, water is delivered only on the toll-charge basis (described above for development periods) through and including the year of that announcement.
(e) Contracts to furnish water. Instead of entering a repayment contract under subsection (d) to cover irrigation's share of water-supply construction costs, the Secretary may instead, at the Secretary's discretion, enter short- or long-term contracts to furnish irrigation water. Each such contract runs for up to forty years, at rates that, in the Secretary's judgment, will produce revenues at least sufficient to cover an appropriate share of yearly operation-and-maintenance cost and appropriate fixed charges the Secretary sets, giving due consideration to irrigation's share of water-supply construction costs, and must require payment of those rates each year in advance of that year's water delivery. Where such contracts are used, the costs of any irrigation-water distribution works the United States builds for the new project, division, or supplemental works are still covered by a repayment contract entered under subsection (d).
(f) Public participation. At least sixty days before entering or amending any repayment contract, or any contract for delivering irrigation water (except a contract for surplus or interim irrigation water lasting one year or less), the Secretary must: (1) publish notice of the proposed contract or amendment in newspapers with general circulation in the affected area, make reasonable efforts to otherwise notify interested parties who might be affected, and provide information on who to contact with comments or inquiries; and (2) provide an opportunity to submit written data, views, and arguments, and consider all substantive comments received.
No expenditures for the construction of any new project*, new division of a project*, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an investigation thereof and has submitted to the President and to the Congress his report and findings on—
the engineering feasibility of the proposed construction;
the estimated cost of the proposed construction;
the part of the estimated cost which can properly be allocated to irrigation and probably be repaid by the water users;
the part of the estimated cost which can properly be allocated to power and probably be returned to the United States in net power revenues;
the part of the estimated cost which can properly be allocated to municipal water supply or other miscellaneous purposes and probably be returned to the United States.
If the proposed construction is found by the Secretary to have engineering feasibility and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other miscellaneous purposes found by the Secretary to be proper, together with any allocation to flood control or navigation made under subsection (b) of this section, equal the total estimated cost of construction as determined by the Secretary, then the new project, new division of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Secretary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be undertaken by the Secretary only after provision therefor has been made by Act of Congress enacted after the Secretary has submitted to the President and the Congress the report and findings involved.
In connection with any new project, new division of a project, or supplemental works on a project there may be allocated to flood control or navigation the part of said total estimated cost which the Secretary may find to be proper. Items for any such allocations made in connection with projects which may be undertaken pursuant to subsection (a) of this section shall be included in the estimates of appropriations submitted by the Secretary for said projects, and funds for such portions of the projects shall not become available except as directly appropriated or allotted to the Department of the Interior. In connection with the making of such an allocation, the Secretary shall consult with the Chief of Engineers and the Secretary of the Army, and may perform any of the necessary investigations or studies under a cooperative agreement with the Secretary of the Army. In the event of such an allocation the Secretary of the Interior shall operate the project for purposes of flood control or navigation, to the extent justified by said allocation therefor.
The Secretary is authorized to enter into contracts to furnish water for municipal water supply or miscellaneous purposes: Provided, That any such contract either (A) shall require repayment to the United States, over a period of not to exceed forty years from the year in which water is first delivered for the use of the contracting party, with interest not exceeding the rate of 3½ per centum per annum if the Secretary determines an interest charge to be proper, of an appropriate share as determined by the Secretary of that part of the construction costs allocated by him to municipal water supply or other miscellaneous purposes; or (B) shall be for such periods, not to exceed forty years, and at such rates as in the Secretary’s judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems proper, and shall require the payment of said rates each year in advance of delivery of water for said year. Any sale of electric power or lease of power privileges, made by the Secretary in connection with the operation of any project or division of a project, shall be for such periods, not to exceed forty years, and at such rates as in his judgment will produce power revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost, interest on an appropriate share of the construction investment at not less than 3 per centum per annum, and such other fixed charges as the Secretary deems proper: Provided further, That in said sales or leases preference shall be given to municipalities and other public corporations or agencies; and also to cooperatives and other nonprofit organizations financed in whole or in part by loans made pursuant to the Rural Electrification Act of 1936 [7 U.S.C. 901 et seq.]. Nothing in this subsection shall be applicable to provisions in existing contracts, made pursuant to law, for the use of power and miscellaneous revenues of a project for the benefit of users of water from such project. The provisions of this subsection respecting the sales of electric power and leases of power privileges shall be an authorization in addition to and alternative to any authority in existing laws related to particular projects and reserve to the Secretary the exclusive authority to develop small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs. No contract relating to municipal water supply or miscellaneous purposes or to electric power or power privileges shall be made unless, in the judgment of the Secretary, it will not impair the efficiency of the project for irrigation purposes.
When carrying out this subsection, the Secretary shall first offer the lease of power privilege to an irrigation district or water users association operating the applicable transferred conduit, or to the irrigation district or water users association receiving water from the applicable reserved conduit. The Secretary shall determine a reasonable time frame for the irrigation district or water users association to accept or reject a lease of power privilege offer for a small conduit hydropower project.
If the irrigation district or water users association elects not accept 1 a lease of power privilege offer under subparagraph (A), the Secretary shall offer the lease of power privilege to other parties in accordance with this subsection.
The Bureau of Reclamation shall apply its categorical exclusion process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to small conduit hydropower development under this subsection, excluding siting of associated transmission facilities on Federal lands.
The Power Resources Office of the Bureau of Reclamation shall be the lead office of small conduit hydropower policy and procedure-setting activities conducted under this subsection.
Nothing in this subsection shall obligate the Western Area Power Administration, the Bonneville Power Administration, or the Southwestern Power Administration to purchase or market any of the power produced by the facilities covered under this subsection and none of the costs associated with production or delivery of such power shall be assigned to project purposes for inclusion in project rates.
Nothing in this subsection shall alter or impede the delivery and management of water by Bureau of Reclamation facilities, as water used for conduit hydropower generation shall be deemed incidental to use of water for the original project purposes. Lease of power privilege shall be made only when, in the judgment of the Secretary, the exercise of the lease will not be incompatible with the purposes of the project or division involved, nor shall it create any unmitigated financial or physical impacts to the project or division involved. The Secretary shall notify and consult with the irrigation district or water users association operating the transferred conduit before offering the lease of power privilege and shall prescribe terms and conditions that will adequately protect the planning, design, construction, operation, maintenance, and other interests of the United States and the project or division involved.
Nothing in this subsection shall alter or affect any existing agreements for the development of conduit hydropower projects or disposition of revenues.
Nothing in this subsection shall alter or affect any existing preliminary permit, license, or exemption issued by the Federal Energy Regulatory Commission under Part I of the Federal Power Act (16 U.S.C. 792 et seq.) or any project for which an application was filed with the Federal Energy Regulatory Commission before August 9, 2013, and is still pending.
In this subsection:
The term “conduit” means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The term “irrigation district” means any irrigation, water conservation or conservancy, multicounty water conservation or conservancy district, or any separate public entity composed of two or more such districts and jointly exercising powers of its member districts.
The term “reserved conduit” means any conduit that is included in project works the care, operation, and maintenance of which has been reserved by the Secretary, through the Commissioner of the Bureau of Reclamation.
The term “transferred conduit” means any conduit that is included in project works the care, operation, and maintenance of which has been transferred to a legally organized water users association or irrigation district.
The term “small conduit hydropower” means a facility capable of producing 5 megawatts or less of electric capacity.
No water may be delivered for irrigation of lands in connection with any new project, new division of a project, or supplemental works on a project until an organization*, satisfactory in form and powers to the Secretary, has entered into a repayment contract with the United States, in a form satisfactory to the Secretary, providing among other things—
That the Secretary may fix a development period for each irrigation block*, if any, of not to exceed ten years from and including the first calendar year in which water is delivered for the lands in said block; and that during the development period water shall be delivered to the lands in the irrigation block involved at a charge per annum per acre-foot, or other charge, to be fixed by the Secretary each year and to be paid in advance of delivery of water: Provided, That where the lands included in an irrigation block are for the most part lands owned by the United States, the Secretary, prior to execution of a repayment contract, may fix a development period, but in such case execution of such a contract shall be a condition precedent to delivery of water after the close of the development period: Provided further, That when the Secretary, by contract or by notice given thereunder, shall have fixed a development period of less than ten years, and at any time thereafter but before commencement of the repayment period conditions arise which in the judgment of the Secretary would have justified the fixing of a longer period, he may amend such contract or notice to extend such development period to a date not to exceed ten years from its commencement, and in a case where no development period was provided, he may amend such contract within the same limits: Provided further, That when the Secretary shall have deferred the payment of all or any part of any installments of construction charges* under any repayment contract pursuant to the authority of the Act of September 21, 1959 (73 Stat. 584), he may, at any time prior to the due date prescribed for the first installment not reduced by such deferment, and by agreement with the contracting organization, terminate the supplemental contract by which such deferment was effected, credit the construction payments made, and exercise the authority granted in this section. After the close of the development period, any such charges collected and which the Secretary determines to be in excess of the cost of the operation and maintenance during the development period shall be credited to the construction cost of the project in the manner determined by the Secretary.
That the part of the construction costs allocated by the Secretary to irrigation shall be included in a general repayment obligation of the organization; and that the organization may vary its distribution of construction charges in a manner that takes into account the productivity of the various classes of lands and the benefits accruing to the lands by reason of the construction: Provided, That no distribution of construction charges over the lands included in the organization shall in any manner be deemed to relieve the organization or any party or any land therein of the organization’s general obligation to the United States.
That the general repayment obligation of the organization shall be spread in annual installments, of the number and amounts fixed by the Secretary, over a period of not more than 40 years, exclusive of any development period fixed under paragraph (1) of this subsection, for any project contract unit* or, if the project contract unit be divided into two or more irrigation blocks, for any such block, or as near to said period of not more than forty years as is consistent with the adoption and operation of a variable payment formula which, being based on full repayment within such period under average conditions, permits variance in the required annual payments in the light of economic factors pertinent to the ability of the organization to pay.
That the first annual installment for any project contract unit, or for any irrigation block, as the case may be, shall accrue, on the date fixed by the Secretary, in the year after the last year of the development period or, if there be not development period, in the calendar year after the Secretary announces that the construction contemplated in the repayment contract is substantially completed or is advanced to a point where delivery of water can be made to substantially all of the lands in said unit or block to be irrigated; and if there be no development period fixed, that prior to and including the year in which the Secretary makes said announcement water shall be delivered only on the toll charge basis hereinbefore provided for development periods.
In lieu of entering into a repayment contract pursuant to the provisions of subsection (d) of this section to cover that part of the cost of the construction of works connected with water supply and allocated to irrigation, the Secretary, in his discretion, may enter into either short- or long-term contracts to furnish water for irrigation purposes. Each such contract shall be for such period, not to exceed forty years, and at such rates as in the Secretary’s judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems proper, due consideration being given to that part of the cost of construction of works connected with water supply and allocated to irrigation; and shall require payment of said rates each year in advance of delivery of water for said year. In the event such contracts are made for furnishing water for irrigation purposes, the costs of any irrigation water distribution works constructed by the United States in connection with the new project, new division of a project, or supplemental works on a project, shall be covered by a repayment contract entered into pursuant to said subsection (d).
No less than sixty days before entering into or amending any repayment contract or any contract for the delivery of irrigation water (except any contract for the delivery of surplus or interim irrigation water whose duration is for one year or less) the Secretary shall—
publish notice of the proposed contract or amendment in newspapers of general circulation in the affected area and shall make reasonable efforts to otherwise notify interested parties which may be affected by such contract or amendment, together with information indicating to whom comments or inquiries concerning the proposed actions can be addressed; and
provide an opportunity for submission of written data, views and arguments, and shall consider all substantive comments so received.
Source credit: (Aug. 4, 1939, ch. 418, § 9, 53 Stat. 1193; July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501; Pub. L. 85–611, §§ 1, 3, Aug. 8, 1958, 72 Stat. 542, 543; Pub. L. 87–613, § 2, Aug. 28, 1962, 76 Stat. 407; Pub. L. 97–293, title II, § 226, Oct. 12, 1982, 96 Stat. 1273; Pub. L. 113–24, § 2, Aug. 9, 2013, 127 Stat. 498; Pub. L. 117–58, div. D, title III, § 40335, Nov. 15, 2021, 135 Stat. 1025.)
- 1939Enacted · Act of Aug. 4, 1939, ch. 418 · 53 Stat. 1193
- 1947Amended · Act of July 26, 1947, ch. 343 · 61 Stat. 501
- 1958Amended · Pub. L. 85-611 · 72 Stat. 542, 543
- 1962Amended · Pub. L. 87-613 · 76 Stat. 407
- 1982Amended · Pub. L. 97-293 · 96 Stat. 1273
- 2013Amended · Pub. L. 113-24 · 127 Stat. 498
- 2021Amended · Pub. L. 117-58 · 135 Stat. 1025
A history note hasn’t been published yet. The record shows enactment by ch. 418 on 1939-08-04.
all 0 arguments · sorted by: best
no arguments yet — make the first case