(a) In General.— The Commandant shall— (1) ensure there is a stable and efficient production and support capability to develop an asset or capability for the Coast Guard; (2) conduct follow-on testing to confirm and monitor performance and correct deficiencies; and (3) conduct acceptance tests and trials before the delivery of each asset or system to ensure the delivered asset or system achieves full operational capability. (b) Elements.— The Commandant shall— (1) execute production contracts; (2) ensure that delivered assets and capabilities meet operational cost and schedules requirements established in the acquisition program baseline; (3) validate manpower and training requirements to meet system needs to operate, maintain, support, and instruct the assets or capabilities; and (4) prepare an acquisition project or program transition plan to enter into programmatic sustainment, operations, and support.
the actual law source: uscode.house.gov ↗public domain
(a)In General.—

The Commandant shall—

(1)

ensure there is a stable and efficient production and support capability to develop an asset or capability for the Coast Guard;

(2)

conduct follow-on testing to confirm and monitor performance and correct deficiencies; and

(3)

conduct acceptance tests and trials prior to the delivery of each asset or system to ensure the delivered asset or system achieves full operational capability.

(b)Elements.—

The Commandant shall—

(1)

execute production contracts;

(2)

ensure that delivered assets and capabilities meet operational cost and schedules requirements established in the acquisition program baseline;

(3)

validate manpower and training requirements to meet system needs to operate, maintain, support, and instruct the assets or capabilities; and

(4)

prepare an acquisition project or program transition plan to enter into programmatic sustainment, operations, and support.

Source credit: (Added Pub. L. 111–281, title IV, § 402(a), Oct. 15, 2010, 124 Stat. 2947, § 574; renumbered § 1134, Pub. L. 115–282, title I, § 108(b), Dec. 4, 2018, 132 Stat. 4208.)

history & why it existsrecord from the source credit
  • 2010Enacted · Pub. L. 111-281 · 124 Stat. 2947
  • 2018Amended · Pub. L. 115-282 · 132 Stat. 4208

A history note hasn’t been published yet. The record shows enactment by Pub. L. 111-281 on 2010-10-15.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case