ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

16 U.S.C. § 459h–5Beach erosion control and hurricane protection; study and formulation of plans; activities by Chief of Engineers, Department of Army

submitted 55 years ago by Pub. L. 91-660 to r/title-16-CONSERVATION · 84 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary of the Interior and the Secretary of the Army can work together on plans for beach erosion control and hurricane protection at Gulf Islands National Seashore. Any Army construction under those plans must follow a plan the Secretary of the Interior accepts.

The Secretary of the Interior and the Secretary of the Army may cooperate to study and design plans for controlling beach erosion and protecting against hurricanes at the Seashore. If the Army's Chief of Engineers builds any protective structures or dumps dredged material as part of that work, it must follow a plan the Secretary of the Interior finds acceptable, and that plan must fit the purposes of this group of sections.
the actual law source: uscode.house.gov ↗public domain

The Secretary of the Interior and the Secretary of the Army may cooperate in the study and formulation of plans for beach erosion control and hurricane protection of the seashore. Any such protective works or spoil deposit activities undertaken by the Chief of Engineers, Department of the Army, shall be carried out within the seashore in accordance with a plan that is acceptable to the Secretary of the Interior and that is consistent with the purposes of sections 459h to 459h–10 of this title.

Source credit: (Pub. L. 91–660, § 6, Jan. 8, 1971, 84 Stat. 1969.)

history & why it existsrecord from the source credit
  • 1971Enacted · Pub. L. 91-660 · 84 Stat. 1969

A history note hasn’t been published yet. The record shows enactment by Pub. L. 91-660 on 1971-01-08.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case