ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

22 U.S.C. § 277bWorks or projects under treaty

submitted 102 years ago by ch. 153 to r/title-22-FOREIGN-RELATIONS-AND-INTERCOURSE · 427 words · no verdicts yet

in plain englishAI-generated · not legal advice

The President can build and run water projects with Mexico under treaty terms. This covers Rio Grande bank protection and the Anzalduas diversion dam. The Secretary of State can also improve the Rio Grande Canalization Project to meet an older water-sharing treaty.

(a) Construction, operation, maintenance, and supervision; sewage interceptor system: The President can (1) build any project a treaty with Mexico provides for, and repair, protect, maintain, or finish projects already built or under construction under such a treaty, plus build any project designed to help meet U.S.-Mexico treaty terms; (2) operate and maintain such projects, or — under rules the American Commissioner or another federal agency issues for continuing supervision — hand off operation and maintenance to a federal agency, or to a state, county, municipality, district, or other local government where the project is located, on terms the President sets; and (3) carry out preliminary surveys, operations, and maintenance of the system built to intercept sewage flowing from Tijuana through certain canyon areas. (b) Rio Grande bank protection project: Spending on this project follows the rules set out for it in the Act of April 25, 1945 (59 Stat. 89), under the heading "International Obligations." (c) Anzalduas diversion dam: This dam cannot be operated for irrigation or water supply in the United States unless suitable arrangements have been made with the future water users, to repay the government for the parts of the dam the Secretary of State assigned to those purposes. (d) Improvements to Rio Grande Canalization Project: To help meet the terms of the 1906 Convention for Equitable Distribution of the Waters of the Rio Grande, the Secretary of State — acting through the U.S. Commissioner of the International Boundary and Water Commission — can improve the Rio Grande Canalization Project, first authorized by the Act of August 29, 1935 (49 Stat. 961). These improvements can include work needed to stabilize the Rio Grande between the Percha Diversion Dam in New Mexico and the American Diversion Dam in El Paso.
the actual law source: uscode.house.gov ↗public domain
(a) Construction, operation, maintenance, and supervision; sewage interceptor system

The President is further authorized (1) to construct any project or works which may be provided for in a treaty entered into with Mexico and to repair, protect, maintain, or complete works now existing or now under construction or those that may be constructed under the treaty provisions aforesaid; and to construct any project or works designed to facilitate compliance with the provisions of treaties between the United States and Mexico; (2) to operate and maintain any project or works so constructed or, subject to such rules and regulations for continuing supervision by the said American Commissioner or any Federal agency as the President may cause to be promulgated, to turn over the operation and maintenance of such project or works to any Federal agency, or any State, county, municipality, district, or other political subdivision within which such project or works may be in whole or in part situated, upon such terms, conditions, and requirements as the President may deem appropriate; and (3) to carry out preliminary surveys, operations, and maintenance of the interceptor system constructed to intercept sewage flows from Tijuana from selected canyon areas.

(b) Rio Grande bank protection project

Expenditures for the Rio Grande bank protection project shall be subject to the provisions and conditions made with respect to that project in the first undesignated paragraph under the heading “International Obligations” contained in the Act of April 25, 1945 (59 Stat. 89).

(c) Anzalduas diversion dam

The Anzalduas diversion dam shall not be operated for irrigation or water supply purposes in the United States unless suitable arrangements have been made with the prospective water users for repayment to the Government of the United States for such portions of the dam as shall have been allocated to such purposes by the Secretary of State.

(d) Improvements to Rio Grande Canalization Project

Pursuant to the authority of subsection (a) and in order to facilitate further compliance with the terms of the Convention for Equitable Distribution of the Waters of the Rio Grande, May 21, 1906, United States-Mexico, the Secretary of State, acting through the United States Commissioner of the International Boundary and Water Commission, may make improvements to the Rio Grande Canalization Project, originally authorized by the Act of August 29, 1935 (49 Stat. 961). Such improvements may include all such works as may be needed to stabilize the Rio Grande in the reach between the Percha Diversion Dam in New Mexico and the American Diversion Dam in El Paso.

Source credit: (May 13, 1924, ch. 153, § 3, as added Aug. 19, 1935, ch. 561, 49 Stat. 660; amended Pub. L. 101–246, title IV, § 412(b)(1), Feb. 16, 1990, 104 Stat. 70; Pub. L. 104–319, title I, § 104, Oct. 19, 1996, 110 Stat. 3866.)

history & why it existsrecord from the source credit
  • 1924Enacted · Act of May 13, 1924, ch. 153 · 49 Stat. 660
  • 1990Amended · Pub. L. 101-246 · 104 Stat. 70
  • 1996Amended · Pub. L. 104-319 · 110 Stat. 3866

A history note hasn’t been published yet. The record shows enactment by ch. 153 on 1924-05-13.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case