30 U.S.C. § 1272 — Designating areas unsuitable for surface coal mining

submitted 49 years ago by Pub. L. 95-87 to r/title-30-MINERAL-LANDS-AND-MINING · 1,363 words · no verdicts yet

in plain englishAI-generated · not legal advice

Each State must create a data-based process for deciding which areas are unsuitable for all or certain types of surface coal mining. The section also governs Federal-land review, petitions and hearings, required statements, and protected locations.

(a) State planning process. (1) To qualify for primary regulatory authority under section 1253, a State must establish a process for objective decisions, based on competent and scientifically sound information, about land unsuitable for all or certain surface coal mining. The designation does not prevent mineral exploration under this chapter. (2) After a subsection (c) petition, the State regulatory authority must designate an area unsuitable if it determines that reclamation under this chapter is not technologically and economically feasible. (3) After such a petition, an area may be designated unsuitable for certain operations if they would (A) conflict with State or local land-use plans; (B) damage important historic, cultural, scientific, aesthetic, or natural-system values on fragile or historic lands; (C) substantially reduce long-term water-supply or food-or-fiber productivity on renewable-resource lands, including aquifers and recharge areas; or (D) substantially endanger life or property on natural-hazard lands, including frequently flooded or geologically unstable areas. (4) The State process must include (A) a responsible State agency; (B) a database and inventory to evaluate land’s capacity to support and be reclaimed after mining; (C) methods for carrying out land-use decisions; and (D) notice and public participation, including a public hearing before designation or redesignation. (5) These decisions must be integrated as closely as possible with Federal, State, and local land-use planning and regulation. (6) This section does not apply to operations existing on August 3, 1977, operations under a chapter permit, or operations with substantial legal and financial commitments existing before January 4, 1977.nn(b) Federal lands. The Secretary must review Federal lands under subsection (a)(2) and (3), but may allow mining before the review ends. If an area is unsuitable, the Secretary must withdraw it or condition mineral leasing or entries to limit mining. Where a Federal program operates under section 1254, the Secretary must create a process for non-Federal lands using this section’s standards and procedures. Before designating Federal land, the Secretary must consult appropriate State and local agencies.nn(c) Petition and decision. A person whose interest is or may be adversely affected may petition the regulatory authority to designate an area unsuitable for surface coal mining operations or end such a designation. The petition must allege facts with supporting evidence. Within 10 months after receiving the petition, the authority must hold a public hearing in the locality of the affected area after appropriate notice and publication of the hearing’s date, time, and location. Before the hearing, anyone may intervene by filing supported factual allegations. Within 60 days after the hearing, the authority must give the petitioner and every other hearing party a written decision on the petition and the reasons for it. If all petitioners agree before the requested hearing and withdraw their request, the hearing need not occur.nn(d) Statement. Before a designation, the authority must prepare a detailed statement on (i) potential coal resources, (ii) demand for coal resources, and (iii) the designation’s effects on the environment, economy, and coal supply.nn(e) Prohibited operations. After August 3, 1977, subject to valid existing rights, no surface coal mining operation other than one existing on that date may be permitted (1) in a unit of the National Park System, National Wildlife Refuge System, National System of Trails, National Wilderness Preservation System, or Wild and Scenic Rivers System, including section 1276(a) study rivers and congressionally designated National Recreation Areas; (2) on Federal land within a national forest, unless the Secretary finds that no significant recreational, timber, economic, or other values would be incompatible with the surface mining and either (A) the surface operations and impacts are incidental to an underground coal mine, or (B) for land without significant forest cover in a national forest west of the 100th meridian, the Secretary of Agriculture determines that surface mining complies with the Multiple-Use Sustained-Yield Act of 1960, the Federal Coal Leasing Amendments Act of 1975, the National Forest Management Act of 1976, and this chapter. No surface coal mining operation may be permitted within the boundaries of the Custer National Forest. (3) if it would adversely affect a publicly owned park or a place included in the National Register of Historic Sites, unless the regulatory authority and the Federal, State, or local agency with jurisdiction jointly approve it; (4) within 100 feet of the outside right-of-way line of a public road, except where a mine-access road or haulage road joins that line. The regulatory authority may permit such a road to be relocated, or may permit the affected area to lie within 100 feet of the road, if, after public notice and an opportunity for a public hearing in the locality, it makes a written finding that the interests of the public and the affected landowners will be protected; or (5) within 300 feet of an occupied dwelling unless its owner waives the limit, or within 300 feet of a public building, school, church, community or institutional building, or public park, or within 100 feet of a cemetery. This section does not define “valid existing rights,” “right-of-way,” or “waiver.”

the actual law source: uscode.house.gov ↗public domain
(a) Establishment of State planning process; standards; State process requirements; integration with present and future land use planning and regulation processes; savings provisions
(1)

To be eligible to assume primary regulatory authority pursuant to section 1253 of this title, each State shall establish a planning process enabling objective decisions based upon competent and scientifically sound data and information as to which, if any, land areas of a State are unsuitable for all or certain types of surface coal mining operations pursuant to the standards set forth in paragraphs (2) and (3) of this subsection but such designation shall not prevent the mineral exploration pursuant to the chapter of any area so designated.

(2)

Upon petition pursuant to subsection (c) of this section, the State regulatory authority shall designate an area as unsuitable for all or certain types of surface coal mining operations if the State regulatory authority determines that reclamation pursuant to the requirements of this chapter is not technologically and economically feasible.

(3)

Upon petition pursuant to subsection (c) of this section, a surface area may be designated unsuitable for certain types of surface coal mining operations if such operations will—

(A)

be incompatible with existing State or local land use plans or programs; or

(B)

affect fragile or historic lands in which such operations could result in significant damage to important historic, cultural, scientific, and esthetic values and natural systems; or

(C)

affect renewable resource lands in which such operations could result in a substantial loss or reduction of long-range productivity of water supply or of food or fiber products, and such lands to include aquifers and aquifer recharge areas; or

(D)

affect natural hazard lands in which such operations could substantially endanger life and property, such lands to include areas subject to frequent flooding and areas of unstable geology.

(4)

To comply with this section, a State must demonstrate it has developed or is developing a process which includes—

(A)

a State agency responsible for surface coal mining lands review;

(B)

a data base and an inventory system which will permit proper evaluation of the capacity of different land areas of the State to support and permit reclamation of surface coal mining operations;

(C)

a method or methods for implementing land use planning decisions concerning surface coal mining operations; and

(D)

proper notice, opportunities for public participation, including a public hearing prior to making any designation or redesignation, pursuant to this section.

(5)

Determinations of the unsuitability of land for surface coal mining, as provided for in this section, shall be integrated as closely as possible with present and future land use planning and regulation processes at the Federal, State, and local levels.

(6)

The requirements of this section shall not apply to lands on which surface coal mining operations are being conducted on August 3, 1977, or under a permit issued pursuant to this chapter, or where substantial legal and financial commitments in such operation were in existence prior to January 4, 1977.

(b) Review of Federal lands

The Secretary shall conduct a review of the Federal lands to determine, pursuant to the standards set forth in paragraphs (2) and (3) of subsection (a) of this section, whether there are areas on Federal lands which are unsuitable for all or certain types of surface coal mining operations: Provided, however, That the Secretary may permit surface coal mining on Federal lands prior to the completion of this review. When the Secretary determines an area on Federal lands to be unsuitable for all or certain types of surface coal mining operations, he shall withdraw such area or condition any mineral leasing or mineral entries in a manner so as to limit surface coal mining operations on such area. Where a Federal program has been implemented in a State pursuant to section 1254 of this title, the Secretary shall implement a process for designation of areas unsuitable for surface coal mining for non-Federal lands within such State and such process shall incorporate the standards and procedures of this section. Prior to designating Federal lands unsuitable for such mining, the Secretary shall consult with the appropriate State and local agencies.

(c) Petition; intervention; decision

Any person having an interest which is or may be adversely affected shall have the right to petition the regulatory authority to have an area designated as unsuitable for surface coal mining operations, or to have such a designation terminated. Such a petition shall contain allegations of facts with supporting evidence which would tend to establish the allegations. Within ten months after receipt of the petition the regulatory authority shall hold a public hearing in the locality of the affected area, after appropriate notice and publication of the date, time, and location of such hearing. After a person having an interest which is or may be adversely affected has filed a petition and before the hearing, as required by this subsection, any person may intervene by filing allegations of facts with supporting evidence which would tend to establish the allegations. Within sixty days after such hearing, the regulatory authority shall issue and furnish to the petitioner and any other party to the hearing, a written decision regarding the petition, and the reasons therefore.1 In the event that all the petitioners stipulate agreement prior to the requested hearing, and withdraw their request, such hearing need not be held.

(d) Statement

Prior to designating any land areas as unsuitable for surface coal mining operations, the regulatory authority shall prepare a detailed statement on (i) the potential coal resources of the area, (ii) the demand for coal resources, and (iii) the impact of such designation on the environment, the economy, and the supply of coal.

(e) Prohibition on certain Federal public and private surface coal mining operations

After August 3, 1977, and subject to valid existing rights no surface coal mining operations except those which exist on August 3, 1977, shall be permitted—

(1)

on any lands within the boundaries of units of the National Park System, the National Wildlife Refuge Systems, the National System of Trails, the National Wilderness Preservation System, the Wild and Scenic Rivers System, including study rivers designated under section 1276(a) of title 16 and National Recreation Areas designated by Act of Congress;

(2)

on any Federal lands within the boundaries of any national forest: Provided, however, That surface coal mining operations may be permitted on such lands if the Secretary finds that there are no significant recreational, timber, economic, or other values which may be incompatible with such surface mining operations and—

(A)

surface operations and impacts are incident to an underground coal mine; or

(B)

where the Secretary of Agriculture determines, with respect to lands which do not have significant forest cover within those national forests west of the 100th meridian, that surface mining is in compliance with the Multiple-Use Sustained-Yield Act of 1960 [16 U.S.C. 528–531], the Federal Coal Leasing Amendments Act of 1975, the National Forest Management Act of 1976, and the provisions of this chapter: And provided further, That no surface coal mining operations may be permitted within the boundaries of the Custer National Forest;

(3)

which will adversely affect any publicly owned park or places included in the National Register of Historic Sites unless approved jointly by the regulatory authority and the Federal, State, or local agency with jurisdiction over the park or the historic site;

(4)

within one hundred feet of the outside right-of-way line of any public road, except where mine access roads or haulage roads join such right-of-way line and except that the regulatory authority may permit such roads to be relocated or the area affected to lie within one hundred feet of such road, if after public notice and opportunity for public hearing in the locality a written finding is made that the interests of the public and the landowners affected thereby will be protected; or

(5)

within three hundred feet from any occupied dwelling, unless waived by the owner thereof, nor within three hundred feet of any public building, school, church, community, or institutional building, public park, or within one hundred feet of a cemetery.

Source credit: (Pub. L. 95–87, title V, § 522, Aug. 3, 1977, 91 Stat. 507.)

history & why it existsrecord from the source credit
  • 1977Enacted · Pub. L. 95-87 · 91 Stat. 507

A history note hasn’t been published yet. The record shows enactment by Pub. L. 95-87 on 1977-08-03.