ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

33 U.S.C. § 702oMississippi River and Tributaries Project

submitted 8 years ago by Pub. L. 115-270 to r/title-33-NAVIGATION-AND-NAVIGABLE-WATERS · 111 words · no verdicts yet

in plain englishAI-generated · not legal advice

This section addresses Mississippi River and Tributaries Project. It sets out the duties, permissions, requirements, limits, or other rules stated in the section.

(a) In general After any flood event requiring operation or activation of any floodway or backwater feature within the Mississippi River and Tributaries Project through natural overtopping of a Federal levee or artificial crevassing of a Federal levee to relieve pressure on the levees elsewhere in the system, the Secretary must expeditiously reset and restore the damaged floodway’s levees. (b) Consultation In carrying out subsection (a), the Secretary must provide an opportunity for consultation with affected communities. (c) Mississippi River and Tributaries Project The term “Mississippi River and Tributaries Project” means the Mississippi River and Tributaries project authorized by the Act of May 15, 1928 (Chap. 569; 45 Stat. 534 ).
the actual law source: uscode.house.gov ↗public domain
(a) In general

After any flood event requiring operation or activation of any floodway or backwater feature within the Mississippi River and Tributaries Project through natural overtopping of a Federal levee or artificial crevassing of a Federal levee to relieve pressure on the levees elsewhere in the system, the Secretary shall expeditiously reset and restore the damaged floodway’s levees.

(b) Consultation

In carrying out subsection (a), the Secretary shall provide an opportunity for consultation with affected communities.

(c) Mississippi River and Tributaries Project

The term “Mississippi River and Tributaries Project” means the Mississippi River and Tributaries project authorized by the Act of May 15, 1928 (Chap. 569; 45 Stat. 534).

Source credit: (Pub. L. 115–270, title I, § 1128, Oct. 23, 2018, 132 Stat. 3780.)

history & why it existsrecord from the source credit
  • 2018Enacted · Pub. L. 115-270 · 132 Stat. 3780

A history note hasn’t been published yet. The record shows enactment by Pub. L. 115-270 on 2018-10-23.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case