ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

40 U.S.C. § 3177 — Use of photovoltaic energy in public buildings

submitted 21 years ago by Pub. L. 109-58 to r/title-40-PUBLIC-BUILDINGS-PROPERTY-AND-WORKS · 439 words · no verdicts yet

in plain englishAI-generated · not legal advice

This section authorizes photovoltaic-system procurement and evaluation programs for public buildings. It authorizes specified funding for both programs for fiscal years 2006 through 2010.

(a) Photovoltaic Energy Commercialization Program. (1) The Administrator may establish a program to procure and install photovoltaic solar-electric systems for electricity in new and existing public buildings. (2) Its purposes are to grow a commercially viable industry and make the system a public option that can reduce fossil-fuel use; reduce Federal fossil-fuel use and costs; pursue installation in 20,000 Federal buildings by 2010 under the 1997 Million Solar Roof Initiative; encourage Federal life-cycle costing and innovative procurement; and develop performance data for future energy incentives. (3)(A) The program shall acquire systems and related storage for public buildings. (B) Acquisitions must permit low-cost production techniques, with at least 150 peak megawatts acquired cumulatively during five years. (4) The Administrator shall administer the program, issue rules to monitor and assess installed systems, develop innovative procurement strategies, and send Congress an annual results report. (b) Photovoltaic Systems Evaluation Program. (1) Within 60 days after enactment, the Administrator had to establish a program evaluating photovoltaic systems required in public buildings. (2) The systems evaluated must reflect the most advanced technology. (c) Appropriations. (1) $50,000,000 each fiscal year 2006 through 2010 is authorized for subsection (a), available until spent. (2) $10,000,000 each such fiscal year is authorized for subsection (b), available until spent.

the actual law source: uscode.house.gov ↗public domain
(a)Photovoltaic Energy Commercialization Program.—
(1)In general.—

The Administrator of General Services may establish a photovoltaic energy commercialization program for the procurement and installation of photovoltaic solar electric systems for electric production in new and existing public buildings.

(2)Purposes.—

The purposes of the program shall be to accomplish the following:

(A)

To accelerate the growth of a commercially viable photovoltaic industry to make this energy system available to the general public as an option which can reduce the national consumption of fossil fuel.

(B)

To reduce the fossil fuel consumption and costs of the Federal Government.

(C)

To attain the goal of installing solar energy systems in 20,000 Federal buildings by 2010, as contained in the Federal Government’s Million Solar Roof Initiative of 1997.

(D)

To stimulate the general use within the Federal Government of life-cycle costing and innovative procurement methods.

(E)

To develop program performance data to support policy decisions on future incentive programs with respect to energy.

(3)Acquisition of photovoltaic solar electric systems.—
(A)In general.—

The program shall provide for the acquisition of photovoltaic solar electric systems and associated storage capability for use in public buildings.

(B)Acquisition levels.—

The acquisition of photovoltaic electric systems shall be at a level substantial enough to allow use of low-cost production techniques with at least 150 megawatts (peak) cumulative acquired during the 5 years of the program.

(4)Administration.—

The Administrator shall administer the program and shall—

(A)

issue such rules and regulations as may be appropriate to monitor and assess the performance and operation of photovoltaic solar electric systems installed pursuant to this subsection;

(B)

develop innovative procurement strategies for the acquisition of such systems; and

(C)

transmit to Congress an annual report on the results of the program.

(b)Photovoltaic Systems Evaluation Program.—
(1)In general.—

Not later than 60 days after the date of enactment of this section, the Administrator shall establish a photovoltaic solar energy systems evaluation program to evaluate such photovoltaic solar energy systems as are required in public buildings.

(2)Program requirement.—

In evaluating photovoltaic solar energy systems under the program, the Administrator shall ensure that such systems reflect the most advanced technology.

(c)Authorization of Appropriations.—
(1)Photovoltaic energy commercialization program.—

There are authorized to be appropriated to carry out subsection (a) $50,000,000 for each of fiscal years 2006 through 2010. Such sums shall remain available until expended.

(2)Photovoltaic systems evaluation program.—

There are authorized to be appropriated to carry out subsection (b) $10,000,000 for each of fiscal years 2006 through 2010. Such sums shall remain available until expended.

Source credit: (Added Pub. L. 109–58, title II, § 204(a), Aug. 8, 2005, 119 Stat. 653.)

history & why it existsrecord from the source credit
  • 2005Enacted · Pub. L. 109-58 · 119 Stat. 653

A history note hasn’t been published yet. The record shows enactment by Pub. L. 109-58 on 2005-08-08.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case