42 U.S.C. § 13493Commercialization of advanced light water reactor technology

submitted 34 years ago by Pub. L. 102-486 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 419 words · no verdicts yet

in plain englishAI-generated · not legal advice

This section funds Department of Energy help for companies developing advanced light water reactor designs. The goal is Commission certification of those designs by 1996. It also funds first-of-a-kind engineering, with eligibility rules and a 50 percent non-federal funding requirement.

(a) Certification of designs. To meet the goal in section 13492(b) of getting standardized reactor designs certified by the Commission by 1996, the Secretary had to run a 5-year program of technical and financial help to encourage developing and submitting advanced light water reactor designs that the Secretary judges could be certified by the end of fiscal year 1996. (b) First-of-a-kind engineering. The Secretary had to run a program of federal financial and technical help for the "first-of-a-kind" engineering design of standardized commercial nuclear power plants that were, as of October 24, 1992, part of the Department of Energy's certification program for advanced light water reactor designs. To qualify for this help, an entity had to certify to the Secretary that: (A) it (or its members) actually designs, engineers, manufactures, builds, or operates nuclear reactors; (B) it (or its members) has the money and genuinely intends to design, engineer, manufacture, build, and operate nuclear power plants in the U.S. all the way through construction and into operation; (C) its proposed design is scheduled for certification under the Department of Energy's light water reactor design certification program; and (D) at least 50 percent of the project's funding comes from non-federal sources, with a substantial share of that coming from utilities or other entities whose main purpose is producing electric power for the public. The Secretary had to give Congress a program document for each selected design, spelling out its goals, major milestones, and the work products to be delivered to the Secretary or made available for review. Before agreeing to help an entity, the Secretary had to set a cost ceiling on the federal government's contribution and report it to Congress. No entity could get help under this subsection for more than 4 years. The total money the Secretary could give out for these projects couldn't exceed $100,000,000 for fiscal years 1993 through 1997 combined.
the actual law source: uscode.house.gov ↗public domain
(a) Certification of designs

In order to achieve the goal of certification of completed standardized designs by the Commission by 1996 as set forth in section 13492(b) of this title, the Secretary shall conduct a 5-year program of technical and financial assistance to encourage the development and submission for certification of advanced light water reactor designs which, in the judgment of the Secretary, can be certified by the Commission by no later than the end of fiscal year 1996.

(b) First-of-a-kind engineering
(1) Establishment of program

The Secretary shall conduct a program of Federal financial and technical assistance for the first-of-a-kind engineering design of standardized commercial nuclear powerplants which are included, as of October 24, 1992, in the Department of Energy’s program for certification of advanced light water reactor designs.

(2) Selection criteria

In order to be eligible for assistance under this subsection, an entity shall certify to the satisfaction of the Secretary that—

(A)

the entity, or its members, are bona fide entities engaged in the design, engineering, manufacture, construction, or operation of nuclear reactors;

(B)

the entity, or its members, have the financial resources necessary for, and fully intend to pursue the design, engineering, manufacture, construction, and operation in the United States of nuclear power plants 1 through completion of construction and into operation;

(C)

the design proposed is scheduled for certification by the Commission under the Department of Energy’s program for certification of light water reactor designs; and

(D)

at least 50 percent of the funding for the project shall be obtained from non-Federal sources, and a substantial portion of that non-Federal funding shall be obtained from utilities or entities whose primary purpose is the production of electrical power for public consumption.

(3) Program documents

The Secretary shall prepare and submit to the Congress a program document for each design selected under this subsection, specifying goals and objectives, major milestones for achieving those goals and objectives, and the work products to be provided to the Secretary or made available for inspection.

(4) Funding limitations
(A)

Before entering into an agreement with an entity under this subsection, the Secretary shall establish a cost ceiling for the contribution of the Federal Government for the project, and shall report such cost ceiling to the Congress.

(B)

No entity shall receive assistance under this subsection for a period greater than 4 years.

(C)

The aggregate funding provided by the Secretary for projects under this subsection shall not exceed $100,000,000 for the period encompassing fiscal years 1993 through 1997.

Source credit: (Pub. L. 102–486, title XXI, § 2123, Oct. 24, 1992, 106 Stat. 3083.)

history & why it existsrecord from the source credit
  • 1992Enacted · Pub. L. 102-486 · 106 Stat. 3083

A history note hasn’t been published yet. The record shows enactment by Pub. L. 102-486 on 1992-10-24.