This section creates a "National Priority Project" award and medal for organizations that advance renewable energy. Winners must meet size and performance rules and get certified yearly by the Secretary of Energy. The Department then gives certified projects extra technical help and guidance.

(a) Designation of National Priority Projects: (1) In general: This section creates the "National Priority Project Designation" (the "Designation"), shown by a medal reading "National Priority Project." (2) Design and materials: The President decides the medal's design, materials, and any extra wording. (b) Making and presentation of Designation: (1) In general: Each year, based on the Secretary's recommendations, the President designates organizations that have: (A) advanced renewable energy technology and helped North American energy independence; and (B) been certified by the Secretary under subsection (e). (2) Presentation: The President decides how the designation ceremony is held. (3) Use of Designation: A winning organization may advertise its Designation as a National Priority Project. (4) Categories: Separate Designations go to winners in each category: (A) Wind and biomass energy generation projects. (B) Photovoltaic and fuel cell energy generation projects. (C) Energy efficient building and renewable energy projects. (D) First-in-Class projects. (c) Selection criteria: (1) In general: The Secretary certifies and selects projects using the criteria in this subsection. (2) Wind, biomass, and building projects: These must show they will install at least 30 megawatts of renewable energy generation capacity. (3) Solar photovoltaic and fuel cell projects: These must show they will install at least 3 megawatts of capacity. (4) Energy efficient building and renewable energy projects: Besides meeting the requirement in (2), a building project must also show it will: (A) meet third-party certification standards for high-performance, sustainable buildings; (B) use whole-building design that integrates energy efficiency and environmental performance, including advanced building controls; (C) get at least 50 percent of its energy from renewable sources; (D) meet applicable Energy Star standards; and (E) include at least 5,000,000 square feet of enclosed space. (5) First-in-Class use: Despite (2) through (4), a new building project may still qualify if the Secretary determines it either: (A) represents a First-In-Class use of renewable energy; or (B) otherwise establishes a new model for building-integrated renewable energy or efficiency. (d) Application: (1) Initial applications: Within 120 days after August 8, 2005, and every year after, the Secretary must publish application instructions and guidelines in the Federal Register. (2) Contents: The application must describe the project (existing or planned) and how it plans to meet the criteria in subsection (c). (e) Certification: (1) In general: Within 60 days after the application period, and every year after, the Secretary must certify projects reasonably expected to meet the criteria in subsection (c). (2) Certified projects: The Secretary assigns Department staff to work with each certified project. These staff must: (A) guide the project on meeting the subsection (c) criteria; (B) identify Department programs, including National Laboratories and Technology Centers, that can help; and (C) make sure current technology know-how transfers between federal resources, including National Laboratories, the Department, and the EPA, and the certified projects, to speed up bringing the technology to market. (f) Authorization of appropriations: Congress may provide whatever money is necessary to carry out this section for fiscal years 2006 through 2010.
the actual law source: uscode.house.gov ↗public domain
(a) Designation of National Priority Projects
(1) In general

There is established the National Priority Project Designation (referred to in this section as the “Designation”), which shall be evidenced by a medal bearing the inscription “National Priority Project”.

(2) Design and materials

The medal shall be of such design and materials and bear such additional inscriptions as the President may prescribe.

(b) Making and presentation of Designation
(1) In general

The President, on the basis of recommendations made by the Secretary, shall annually designate organizations that have—

(A)

advanced the field of renewable energy technology and contributed to North American energy independence; and

(B)

been certified by the Secretary under subsection (e).

(2) Presentation

The President shall designate projects with such ceremonies as the President may prescribe.

(3) Use of Designation

An organization that receives a Designation under this section may publicize the Designation of the organization as a National Priority Project in advertising.

(4) Categories in which the Designation may be given

Separate Designations shall be made to qualifying projects in each of the following categories:

(A)

Wind and biomass energy generation projects.

(B)

Photovoltaic and fuel cell energy generation projects.

(C)

Energy efficient building and renewable energy projects.

(D)

First-in-Class projects.

(c) Selection criteria
(1) In general

Certification and selection of the projects to receive the Designation shall be based on criteria established under this subsection.

(2) Wind, biomass, and building projects

In the case of a wind, biomass, or building project, the project shall demonstrate that the project will install not less than 30 megawatts of renewable energy generation capacity.

(3) Solar photovoltaic and fuel cell projects

In the case of a solar photovoltaic or fuel cell project, the project shall demonstrate that the project will install not less than 3 megawatts of renewable energy generation capacity.

(4) Energy efficient building and renewable energy projects

In the case of an energy efficient building or renewable energy project, in addition to meeting the criteria established under paragraph (2), each building project shall demonstrate that the project will—

(A)

comply with third-party certification standards for high-performance, sustainable buildings;

(B)

use whole-building integration of energy efficiency and environmental performance design and technology, including advanced building controls;

(C)

use renewable energy for at least 50 percent of the energy consumption of the project;

(D)

comply with applicable Energy Star standards; and

(E)

include at least 5,000,000 square feet of enclosed space.

(5) First-in-Class use

Notwithstanding paragraphs (2) through (4), a new building project may qualify under this section if the Secretary determines that the project—

(A)

represents a First-In-Class use of renewable energy; or

(B)

otherwise establishes a new paradigm of building integrated renewable energy use or energy efficiency.

(d) Application
(1) Initial applications

No later than 120 days after August 8, 2005, and annually thereafter, the Secretary shall publish in the Federal Register an invitation and guidelines for submitting applications, consistent with this section.

(2) Contents

The application shall describe the project, or planned project, and the plans to meet the criteria established under subsection (c).

(e) Certification
(1) In general

Not later than 60 days after the application period described in subsection (d), and annually thereafter, the Secretary shall certify projects that are reasonably expected to meet the criteria established under subsection (c).

(2) Certified projects

The Secretary shall designate personnel of the Department to work with persons carrying out each certified project and ensure that the personnel—

(A)

provide each certified project with guidance in meeting the criteria established under subsection (c);

(B)

identify programs of the Department, including National Laboratories and Technology Centers, that will assist each project in meeting the criteria established under subsection (c); and

(C)

ensure that knowledge and transfer of the most current technology between the applicable resources of the Federal Government (including the National Laboratories and Technology Centers, the Department, and the Environmental Protection Agency) and the certified projects is being facilitated to accelerate commercialization of work developed through those resources.

(f) Authorization of appropriations

There are authorized to be appropriated such sums as are necessary to carry out this section for each of fiscal years 2006 through 2010.

Source credit: (Pub. L. 109–58, title XIV, § 1405, Aug. 8, 2005, 119 Stat. 1062.)

history & why it existsrecord from the source credit
  • 2005Enacted · Pub. L. 109-58 · 119 Stat. 1062

A history note hasn’t been published yet. The record shows enactment by Pub. L. 109-58 on 2005-08-08.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case