42 U.S.C. § 17385Smart grid interoperability framework

submitted 19 years ago by Pub. L. 110-140 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 544 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Director of NIST must lead work on smart grid interoperability standards. FERC can then adopt matching rules for interstate power transmission. Congress authorized $5,000,000 a year for NIST from 2008 through 2012.

(a) Interoperability framework. The Director of the National Institute of Standards and Technology (NIST) has the main job of coordinating a framework, protocols and model standards, for managing information so smart grid devices and systems can work together. These protocols and standards must line up policy, business, and technology approaches so that all electric resources, including demand-side resources, can help build an efficient, reliable power network. While building them: (1) the Director must ask for input and cooperation from the Federal Energy Regulatory Commission (the "Commission"), OEDER and its Smart Grid Task Force, the Smart Grid Advisory Committee, and other relevant federal and state agencies; and (2) the Director must also ask private groups for input, including the Gridwise Architecture Council, the Institute of Electrical and Electronics Engineers, the national electric reliability organization recognized by FERC, and the National Electrical Manufacturers Association. (b) Scope of framework. The framework must be flexible, uniform, and neutral about technology, including technology used to manage smart grid information. It must be designed to: (1) work with both traditional centralized power plants and transmission, and consumer-owned distributed resources like distributed generation, renewable generation, storage, energy efficiency, and demand response tools; (2) stay flexible enough to handle (A) regional and organizational differences and (B) new technology; (3) consider voluntary uniform standards for mass-produced home and business appliances that let customers choose, consistent with state and federal law, to have appliances that can respond to grid emergencies and demand-response signals by cutting some or all of their power use, through (A) reducing total demand, (B) adjusting load to help the grid, and (C) in a reliability crisis that threatens an outage, briefly shedding load to keep the grid stable; and (4) give manufacturers reasonable lead time to build in these voluntary standards. (c) Timing of framework development. NIST had to start this work within 60 days of December 19, 2007. It had to publish an initial progress report on standards within one year of that date, further reports whenever NIST judges they're needed, and a final report once the work is done or a federal role is no longer needed. (d) Standards for interoperability in federal jurisdiction. Once NIST's work has built enough agreement, in FERC's judgment, FERC must start a rulemaking to adopt the standards and protocols needed to guarantee smart-grid functions and interoperability for interstate power transmission and for regional and wholesale electricity markets. (e) Authorization. Congress authorized $5,000,000 per year for NIST to carry out this section's work, for each of fiscal years 2008 through 2012.
the actual law source: uscode.house.gov ↗public domain
(a) Interoperability framework

The Director of the National Institute of Standards and Technology shall have primary responsibility to coordinate the development of a framework that includes protocols and model standards for information management to achieve interoperability of smart grid devices and systems. Such protocols and standards shall further align policy, business, and technology approaches in a manner that would enable all electric resources, including demand-side resources, to contribute to an efficient, reliable electricity network. In developing such protocols and standards—

(1)

the Director shall seek input and cooperation from the Commission, OEDER and its Smart Grid Task Force, the Smart Grid Advisory Committee, other relevant Federal and State agencies; and

(2)

the Director shall also solicit input and cooperation from private entities interested in such protocols and standards, including but not limited to the Gridwise Architecture Council, the International Electrical and Electronics Engineers, the National Electric Reliability Organization recognized by the Federal Energy Regulatory Commission, and National Electrical Manufacturer’s Association.

(b) Scope of framework

The framework developed under subsection (a) shall be flexible, uniform and technology neutral, including but not limited to technologies for managing smart grid information, and designed—

(1)

to accommodate traditional, centralized generation and transmission resources and consumer distributed resources, including distributed generation, renewable generation, energy storage, energy efficiency, and demand response and enabling devices and systems;

(2)

to be flexible to incorporate—

(A)

regional and organizational differences; and

(B)

technological innovations;

(3)

to consider the use of voluntary uniform standards for certain classes of mass-produced electric appliances and equipment for homes and businesses that enable customers, at their election and consistent with applicable State and Federal laws, and are manufactured with the ability to respond to electric grid emergencies and demand response signals by curtailing all, or a portion of, the electrical power consumed by the appliances or equipment in response to an emergency or demand response signal, including through—

(A)

load reduction to reduce total electrical demand;

(B)

adjustment of load to provide grid ancillary services; and

(C)

in the event of a reliability crisis that threatens an outage, short-term load shedding to help preserve the stability of the grid; and

(4)

such voluntary standards should incorporate appropriate manufacturer lead time.1

(c) Timing of framework development

The Institute shall begin work pursuant to this section within 60 days of December 19, 2007. The Institute shall provide and publish an initial report on progress toward recommended or consensus standards and protocols within 1 year after December 19, 2007, further reports at such times as developments warrant in the judgment of the Institute, and a final report when the Institute determines that the work is completed or that a Federal role is no longer necessary.

(d) Standards for interoperability in Federal jurisdiction

At any time after the Institute’s work has led to sufficient consensus in the Commission’s judgment, the Commission shall institute a rulemaking proceeding to adopt such standards and protocols as may be necessary to insure smart-grid functionality and interoperability in interstate transmission of electric power, and regional and wholesale electricity markets.

(e) Authorization

There are authorized to be appropriated for the purposes of this section $5,000,000 to the Institute to support the activities required by this subsection 2 for each of fiscal years 2008 through 2012.

Source credit: (Pub. L. 110–140, title XIII, § 1305, Dec. 19, 2007, 121 Stat. 1787.)

history & why it existsrecord from the source credit
  • 2007Enacted · Pub. L. 110-140 · 121 Stat. 1787