42 U.S.C. § 6803 — Development of electric utility rate design proposals by Secretary; contents; submission to Congress; supporting analysis
submitted 50 years ago by Pub. L. 94-385 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 237 words · no verdicts yet
The Secretary must develop electric-utility rate-design proposals. The proposals must encourage conservation, reduce the need for new generating capacity, and reduce consumer costs, and must be sent to Congress with specified analysis.
(a) The Secretary* must develop proposals to improve electric-utility rate design. They must encourage energy conservation, reduce the need for new generating capacity, and reduce consumers' electric-energy costs. They must include proposals for cost-effective load management; rates based on marginal service cost or time of use, or both; rate-making policies discouraging inefficient fuel use and encouraging economical fuel purchases; and rates or other policies encouraging reliable utility systems and reliable major equipment.
(b) The Secretary must send the proposals to each House of Congress within six months after August 14, 1976, for review and any further action Congress directs by law. Each proposal must include an analysis of likely nationwide effects on petroleum, natural-gas, electric-energy, and other-energy consumption; the need for new generating capacity and the industry's capital demand; and consumer electric-energy costs.
The Secretary* shall develop proposals to improve electric utility* rate design. Such proposals shall be designed to encourage energy conservation, minimize the need for new electrical generating capacity, and minimize costs of electric energy to consumers, and shall include (but not be limited to) proposals which provide for the development and implementation of—
load management techniques which are cost effective;
rates which reflect marginal cost of service, or time of use of service, or both;
ratemaking policies which discourage inefficient use of fuel and encourage economical purchases of fuel; and
rates (or other regulatory policies) which encourage electric utility system reliability and reliability of major items of electric utility equipment.
The proposals prepared under subsection (a) shall be transmitted to each House of Congress not later than 6 months after August 14, 1976, for review and for such further action as the Congress may direct by law. Such proposals shall be accompanied by an analysis of—
the projected savings (if any) in consumption of petroleum products, natural gas, electric energy, and other energy resources,
the reduction (if any) in the need for new electrical generating capacity, and of the demand for capital by the electric utility industry, and
changes (if any) in the cost of electric energy to consumers,
which are likely to result from the implementation nationally of each of the proposals transmitted under this subsection.
Source credit: (Pub. L. 94–385, title II, § 203, Aug. 14, 1976, 90 Stat. 1143; Pub. L. 95–617, title I, § 143, Nov. 9, 1978, 92 Stat. 3134.)
- 1976Enacted · Pub. L. 94-385 · 90 Stat. 1143
- 1978Amended · Pub. L. 95-617 · 92 Stat. 3134