42 U.S.C. § 7651n — Clean coal technology regulatory incentives
submitted 71 years ago by Pub. L. 101-549 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 631 words · no verdicts yet
This law defines 'clean coal technology' and gives it special regulatory breaks. Temporary and permanent demonstration projects are excused from certain permitting rules. Very clean coal units that restart after shutting down also get an exemption if they meet strict conditions.
For purposes of this section, “clean coal technology” means any technology, including technologies applied at the precombustion, combustion, or post combustion stage, at a new or existing facility which will achieve significant reductions in air emissions of sulfur dioxide or oxides of nitrogen associated with the utilization of coal in the generation of electricity, process steam, or industrial products, which is not in widespread use as of November 15, 1990.
This subsection applies to physical or operational changes to existing facilities for the sole purpose of installation, operation, cessation, or removal of a temporary or permanent clean coal technology demonstration project*. For the purposes of this section, a clean coal technology demonstration project shall mean a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology”, up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The Federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.
Installation, operation, cessation, or removal of a temporary clean coal technology demonstration project that is operated for a period of five years or less, and which complies with the State* implementation plans for the State in which the project is located and other requirements necessary to attain and maintain the national ambient air quality standards during and after the project is terminated, shall not subject such facility to the requirements of section 7411 of this title or part C or D of subchapter I.
For permanent clean coal technology demonstration projects that constitute repowering* as defined in section 7651a(l) 1 of this title, any qualifying project shall not be subject to standards of performance under section 7411 of this title or to the review and permitting requirements of part C 2 for any pollutant the potential emissions of which will not increase as a result of the demonstration project.
Not later than 12 months after November 15, 1990, the Administrator* shall promulgate regulations or interpretive rulings to revise requirements under section 7411 of this title and parts C and D,2 as appropriate, to facilitate projects consistent in 3 this subsection. With respect to parts C and D,2 such regulations or rulings shall apply to all areas in which EPA is the permitting authority*. In those instances in which the State is the permitting authority under part C or D,2 any State may adopt and submit to the Administrator for approval revisions to its implementation plan to apply the regulations or rulings promulgated under this subsection.
Physical changes or changes in the method of operation associated with the commencement of commercial operations by a coal-fired utility unit* after a period of discontinued operation shall not subject the unit* to the requirements of section 7411 of this title or part C of the Act 2 where the unit (1) has not been in operation for the two-year period prior to the enactment of the Clean Air Act Amendments of 1990 [November 15, 1990], and the emissions from such unit continue to be carried in the permitting authority’s emissions inventory at the time of enactment, (2) was equipped prior to shut-down with a continuous system of emissions control that achieves a removal efficiency for sulfur dioxide of no less than 85 percent and a removal efficiency for particulates of no less than 98 percent, (3) is equipped with low-NOx burners prior to the time of commencement, and (4) is otherwise in compliance with the requirements of this chapter.
Source credit: (July 14, 1955, ch. 360, title IV, § 415, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2625.)
- 1955Enacted · Pub. L. 101-549 · 104 Stat. 2625
A history note hasn’t been published yet. The record shows enactment by Pub. L. 101-549 on 1955-07-14.
all 0 arguments · sorted by: best
no arguments yet — make the first case