42 U.S.C. § 9004Pilot and demonstration plants

submitted 46 years ago by Pub. L. 96-310 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 236 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary may build test ocean thermal energy plants to prove the technology works. At least two separate demonstration projects must be chosen competitively. The Secretary must consider offshore projects and fair cost-sharing.

(a) Initiation of program. The Secretary may start a program to design, build, and run well-monitored ocean thermal energy conversion facilities. These must be big enough to show the technology can work, and could work economically, to replace nonrenewable fuels. To build a strong industry around this technology, at least two independent, parallel demonstration projects must be picked through competition. (b) Demonstration program goals. The program must aim at least to: (1) prove the technology works through pilot and demonstration plants totaling at least 100 megawatts of electricity or an equal energy product by 1986; (2) deliver base-load electricity to utilities, or produce commercially useful amounts of energy product; and (3) run each demonstration plant long enough to collect and study performance and reliability data. (c) Financial assistance. When giving financial help under this section, the Secretary must: (1) fully consider projects that would supply energy to U.S. offshore states, territories, and possessions; and (2) look for fair cost-sharing deals when the Secretary thinks that is appropriate.
the actual law source: uscode.house.gov ↗public domain
(a) Initiation of program

The Secretary is authorized to initiate a program to design, construct, and operate well instrumented ocean thermal energy conversion facilities of sufficient size to demonstrate the technical feasibility and potential economic feasibility of utilizing the various forms of ocean thermal energy conversion to displace nonrenewable fuels. To achieve the goals of this section and to facilitate development of a strong industrial basis for the application of ocean thermal energy conversion system technology, at least two independent parallel demonstration projects shall be competitively selected.

(b) Demonstration program goals

The specific goals of the demonstration program shall include at a minimum—

(1)

the demonstration of ocean thermal energy conversion technical feasibility through multiple pilot and demonstration plants with a combined capacity of at least one hundred megawatts of electrical capacity or energy product equivalent by the year 1986;

(2)

the delivery of baseload electricity to utilities located on land or the production of commercially attractive quantities of energy product; and

(3)

the continuous operation of each pilot and demonstration facility for a sufficient period of time to collect and analyze system performance and reliability data.

(c) Financial assistance

In providing any financial assistance under this section, the Secretary shall (1) give full consideration to those projects which will provide energy to United States offshore States, its territories, and its possessions and (2) seek satisfactory cost-sharing arrangements when he deems such arrangements to be appropriate.

Source credit: (Pub. L. 96–310, § 5, July 17, 1980, 94 Stat. 943.)

history & why it existsrecord from the source credit
  • 1980Enacted · Pub. L. 96-310 · 94 Stat. 943

A history note hasn’t been published yet. The record shows enactment by Pub. L. 96-310 on 1980-07-17.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case