49 U.S.C. § 40112 — Multiyear procurement contracts for property

submitted 32 years ago by Pub. L. 103-272 to r/title-49-TRANSPORTATION · 717 words · no verdicts yet

in plain englishAI-generated · not legal advice

The FAA Administrator can sign contracts up to 5 years to buy airspace-system property. First, the Administrator must confirm the need, design, and costs are stable and realistic. Big contracts need 30 days' notice to Congress, and unfunded contracts must end using set-aside money.

(a) General Authority. Getting around the usual one-year funding rule, the FAA Administrator can sign contracts of more than 1 but no more than 5 years to buy property — but not contracts to build, alter, or majorly repair real estate.

(b) Required Findings. The Administrator can only sign this kind of contract after finding that: (1) it improves airspace safety or efficiency and cuts total costs; (2) the need for the property will likely stay about the same throughout the contract, in terms of production rate, purchase rate, and total amount; (3) the Administrator can reasonably expect to keep requesting enough funding each year to avoid canceling the contract; (4) the property's design is stable and its technical risks aren't excessive; and (5) the cost and savings estimates are realistic.

(c) Regulations. The Administrator must write rules for buying property this way that make the most efficient use of these contracts. The rules can allow a cancellation clause when needed, which may factor in the contractor's recurring and one-time costs. As much as practical, the rules must: (1) help the broader aviation industry by (A) using these contracts to involve subcontractors, vendors, and suppliers, and (B) paying them as quickly as possible once they've earned it; and (2) not be applied in a way that blocks the Administrator's existing ability to (A) keep competition in producing items under the contract, or (B) end a prime contract that's falling short on cost, quality, or schedule.

(d) Contract Provisions. (1) A contract under this section may (A) be used to buy in advance the parts and materials needed to build equipment for the national airspace system, (B) say that performance after the first year depends on Congress appropriating money, and (C) include a priced option to change how many items get bought over the contract's life. (2) If practical, an advance-purchase contract can be used to get bulk-buying savings and better production rates.

(e) Cancellation Payment and Notice of Cancellation Ceiling. (1) If the contract's performance depends on future appropriations, it can also include a payment to the contractor if that funding doesn't come through. (2) Before signing a contract with a cancellation cap over $100,000,000, the Administrator must give written notice to the Senate Commerce Committee and House Transportation Committee, and then wait at least 30 days before signing.

(f) Ending Contracts. Just like the previous section, if funding isn't provided to continue the contract into the next fiscal year, it must end, with wind-down costs paid from (1) money set aside for the contract, (2) unused current funding for that type of property, or (3) money appropriated specifically to end contracts.

the actual law source: uscode.house.gov ↗public domain
(a)General Authority.—

Notwithstanding section 1341(a)(1)(B) of title 31 and to the extent that amounts otherwise are available for obligation, the Administrator of the Federal Aviation Administration may make a contract of more than one but not more than 5 fiscal years to purchase property, except a contract to construct, alter, or make a major repair or improvement to real property.

(b)Required Findings.—

The Administrator may make a contract under this section if the Administrator finds that—

(1)

the contract will promote the safety or efficiency of the national airspace system and will result in reduced total contract costs;

(2)

the minimum need for the property to be purchased is expected to remain substantially unchanged during the proposed contract period in terms of production rate, procurement rate, and total quantities;

(3)

there is a reasonable expectation that throughout the proposed contract period the Administrator will request appropriations for the contract at the level required to avoid cancellation;

(4)

there is a stable design for the property to be acquired and the technical risks associated with the property are not excessive; and

(5)

the estimates of the contract costs and the anticipated savings from the contract are realistic.

(c)Regulations.—

The Administrator shall prescribe regulations for acquiring property under this section to promote the use of contracts under this section in a way that will allow the most efficient use of those contracts. The regulations may provide for a cancellation provision in the contract to the extent the provision is necessary and in the best interest of the United States. The provision may include consideration of recurring and nonrecurring costs of the contractor associated with producing the item to be delivered under the contract. The regulations shall provide that, to the extent practicable—

(1)

to broaden the aviation industrial base—

(A)

a contract under this section shall be used to seek, retain, and promote the use under that contract of subcontractors, vendors, or suppliers; and

(B)

on accrual of a payment or other benefit accruing on a contract under this section to a subcontractor, vendor, or supplier participating in the contract, the payment or benefit shall be delivered in the most expeditious way practicable; and

(2)

this section and regulations prescribed under this section may not be carried out in a way that precludes or curtails the existing ability of the Administrator to provide for—

(A)

competition in producing items to be delivered under a contract under this section; or

(B)

ending a prime contract when performance is deficient with respect to cost, quality, or schedule.

(d)Contract Provisions.—
(1)

A contract under this section may—

(A)

be used for the advance procurement of components, parts, and material necessary to manufacture equipment to be used in the national airspace system;

(B)

provide that performance under the contract after the first year is subject to amounts being appropriated; and

(C)

contain a negotiated priced option for varying the number of end items to be procured over the period of the contract.

(2)

If feasible and practicable, an advance procurement contract may be made to achieve economic-lot purchases and more efficient production rates.

(e)Cancellation Payment and Notice of Cancellation Ceiling.—
(1)

If a contract under this section provides that performance is subject to an appropriation being made, it also may provide for a cancellation payment to be made to the contractor if the appropriation is not made.

(2)

Before awarding a contract under this section containing a cancellation ceiling of more than $100,000,000, the Administrator shall give written notice of the proposed contract and cancellation ceiling to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives. The contract may not be awarded until the end of the 30-day period beginning on the date of the notice.

(f)Ending Contracts.—

A contract made under this section shall be ended if amounts are not made available to continue the contract into a subsequent fiscal year. The cost of ending the contract may be paid from—

(1)

an appropriation originally available for carrying out the contract;

(2)

an appropriation currently available for procuring the type of property concerned and not otherwise obligated; or

(3)

amounts appropriated for payments to end the contract.

Source credit: (Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1108; Pub. L. 104–106, div. E, title LVI, § 5606, Feb. 10, 1996, 110 Stat. 700; Pub. L. 104–287, § 5(9), Oct. 11, 1996, 110 Stat. 3389.)

history & why it existsrecord from the source credit
  • 1994Enacted · Pub. L. 103-272 · 108 Stat. 1108
  • 1996Amended · Pub. L. 104-106 · 110 Stat. 700
  • 1996Amended · Pub. L. 104-287 · 110 Stat. 3389