ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

42 U.S.C. § 8374 — Emergency authorities

submitted 48 years ago by Pub. L. 95-620 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 629 words · no verdicts yet

in plain englishAI-generated · not legal advice

This section gives the President emergency powers over coal allocation, fuel use, and powerplant rules during serious supply interruptions or emergencies. It limits the duration of orders, bars delegation of the authority, and requires publication and reports to Congress.

(a) Coal allocation. (1) If the President declares a severe energy supply interruption as defined in section 6202(8), or finds and publishes that a national or regional fuel shortage exists or may exist that: (i) is or likely will be significant in scope and duration and emergency in nature; (ii) causes or may cause major harm to public health, safety, welfare, or the economy; and (iii) results or likely will result from a coal-supply interruption, sabotage, or an act of God, the President may order coal allocated, and its transportation required, for an electric powerplant or major fuel-burning installation. The President may set terms and conditions to ensure reliable electric service, prevent unemployment, or protect public health, safety, or welfare. (2) “Coal” means anthracite, bituminous coal, and lignite, but not a fuel derivative. This section does not define the quoted term “severe energy supply interruption.” (b) Emergency ban on natural gas or petroleum. If the President declares such an interruption, the President may order a powerplant or major fuel-burning installation not to use natural gas, petroleum, or both as a primary energy source for the interruption’s duration. Any suspension of emissions limits or other implementation-plan requirements needed because of the order may be issued only under section 7410(f). (c) Emergency stays. The President may order a stay of any chapter provision, rule, or order applying to a new or existing plant if the President finds and publishes that an emergency caused by national, regional, or systemwide shortages of coal or other alternate fuels, or disrupted transportation, is likely to affect the plant’s service reliability. (d) Duration. (1) Unless paragraph (3) applies, an order under this section lasts no longer than the interruption or emergency, or 90 days, whichever is shorter. (2) A later order may extend it and must be sent to Congress under section 6421; that section’s congressional review applies. (3) Despite paragraph (1), the order does not end under this subsection during the 15-calendar-day congressional-review period for the later order. (4) This subsection supersedes subchapter II of chapter 34 of title 50. (e) No delegation. The President may not delegate authority to issue an order. This does not prevent directing a Federal agency to issue rules or take consistent action to implement the order. (f) Publication and reports. Every order must be published in the Federal Register. To the greatest practicable extent, before issuing an order, but no later than five days afterward, the President must report to Congress the intent to issue it and the reasons.

the actual law source: uscode.house.gov ↗public domain
(a) Coal allocation authority
(1)

If the President—

(A)

declares a severe energy supply interruption, as defined in section 6202(8) of this title, or

(B)

finds, and publishes such finding, that a national or regional fuel supply shortage exists or may exist which the President determines—

(i)

is, or is likely to be, of significant scope and duration, and of an emergency nature;

(ii)

causes, or may cause, major adverse impact on public health, safety, or welfare or on the economy; and

(iii)

results, or is likely to result, from an interruption in the supply of coal or from sabotage, or an act of God;

the President may, by order, allocate coal (and require the transportation thereof) for the use of any electric powerplant or major fuel-burning installation, in accordance with such terms and conditions as he may prescribe, to insure reliability of electric service or prevent unemployment, or protect public health, safety, or welfare.

(2)

For purposes of this subsection, the term “coal” means anthracite and bituminous coal and lignite (but does not mean any fuel derivative thereof).

(b) Emergency prohibition on use of natural gas or petroleum

If the President declares a severe energy supply interruption, as defined in section 6202(8) of this title, the President may, by order, prohibit any electric powerplant or major fuel-burning installation from using natural gas or petroleum, or both, as a primary energy source for the duration of such interruption. Notwithstanding any other provision of this section, any suspension of emission limitations or other requirements of applicable implementation plans, as defined in section 7410(d) 1 of this title, required by such prohibition shall be issued only in accordance with section 7410(f) of this title.

(c) Emergency stays

The President may, by order, stay the application of any provision of this chapter, or any rule or order thereunder, applicable to any new or existing electric powerplant, if the President finds, and publishes such finding, that an emergency exists, due to national, regional, or systemwide shortages of coal or other alternate fuels, or disruption of transportation facilities, which emergency is likely to affect reliability of service of any such electric powerplant.

(d) Duration of emergency orders
(1)

Except as provided in paragraph (3), any order issued by the President under this section shall not be effective for longer than the duration of the interruption or emergency, or 90 days, whichever is less.

(2)

Any such order may be extended by a subsequent order which the President shall transmit to the Congress in accordance with section 6421 of this title. Such order shall be subject to congressional review pursuant to such section.

(3)

Notwithstanding paragraph (1), the effectiveness of any order issued under this section shall not terminate under this subsection during the 15-calendar-day period during which any such subsequent order described in paragraph (2) is subject to congressional review under section 6421 of this title.

(4)

For purposes of this subsection, the provisions of this subsection supersede the provisions of subchapter II of chapter 34 of title 50.

(e) Delegation of authority prohibited

The authority of the President to issue any order under this section may not be delegated. This subsection shall not be construed to prevent the President from directing any Federal agency to issue rules or regulations or take such other action, consistent with this section, in the implementation of such order.

(f) Publication and reports to Congress of orders

Any order issued under this section shall be published in the Federal Register. To the greatest extent practicable, the President shall, before issuing any order under this section, but in no event later than 5 days after issuing such order, report to the Congress of his intention to issue such order and state his reasons therefor.

Source credit: (Pub. L. 95–620, title IV, § 404, Nov. 9, 1978, 92 Stat. 3319; Pub. L. 100–42, § 1(c)(15), May 21, 1987, 101 Stat. 313.)

history & why it existsrecord from the source credit
  • 1978Enacted · Pub. L. 95-620 · 92 Stat. 3319
  • 1987Amended · Pub. L. 100-42 · 101 Stat. 313

A history note hasn’t been published yet. The record shows enactment by Pub. L. 95-620 on 1978-11-09.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case