43 U.S.C. § 2402 — Rural water supply program
submitted 20 years ago by Pub. L. 109-451 to r/title-43-PUBLIC-LANDS · 406 words · no verdicts yet
A translation hasn’t been published for this section yet. The official text below is complete and authoritative.
The Secretary*, in cooperation with non-Federal project entities and consistent with this subchapter, may carry out a rural water supply program* in Reclamation States* to—
investigate and identify opportunities to ensure safe and adequate rural water supply projects for domestic, municipal, and industrial use in small communities and rural areas of the Reclamation States;
plan the design and construction*, through the conduct of appraisal investigations and feasibility studies, of rural water supply projects in Reclamation States; and
oversee, as appropriate, the construction of rural water supply projects in Reclamation States that are recommended by the Secretary in a feasibility report developed pursuant to section 2405 of this title and subsequently authorized by Congress.
Any activity carried out under this subchapter shall be carried out in cooperation with a qualifying non-Federal project entity, consistent with this subchapter.
Not later than 1 year after December 22, 2006, the Secretary shall, consistent with this subchapter, develop and publish in the Federal Register criteria for—
determining the eligibility of a rural community for assistance under the Program; and
prioritizing requests for assistance under the Program.
The criteria developed under subsection (c) shall take into account such factors as whether—
a rural water supply project*—
serves—
rural areas and small communities; or
Indian* tribes; or
promotes and applies a regional or watershed perspective to water resources management;
there is an urgent and compelling need for a rural water supply project that would—
improve the health or aesthetic quality of water;
result in continuous, measurable, and significant water quality benefits; or
address current or future water supply needs;
a rural water supply project helps meet applicable requirements established by law; and
a rural water supply project is cost effective.
The Secretary may include—
to the extent that connection provides a reliable water supply, a connection to pre-existing infrastructure (including impoundments and conveyance channels) as part of a rural water supply project; and
notwithstanding the limitation on population under section 2401(9)(A) of this title, a town or community with a population in excess of 50,000 inhabitants in an area served by a rural water supply project if, at the discretion of the Secretary, the town or community is considered to be a critical partner in the rural supply project.
Source credit: (Pub. L. 109–451, title I, § 103, Dec. 22, 2006, 120 Stat. 3347.)
- 2006Enacted · Pub. L. 109-451 · 120 Stat. 3347
A history note hasn’t been published yet. The record shows enactment by Pub. L. 109-451 on 2006-12-22.
all 0 arguments · sorted by: best
no arguments yet — make the first case