10 U.S.C. § 4236 — Negotiation of price for technical data before development, production, or sustainment of major weapon systems
submitted 9 years ago by Pub. L. 115-91 to r/title-10-ARMED-FORCES · 62 words · no verdicts yet
This section requires the Department of Defense, when practicable, to negotiate a price for technical data before selecting a contractor for development, production, or sustainment of a major weapon system.
The Secretary of Defense must ensure, to the maximum extent practicable, that the Department of Defense, before selecting a contractor for the engineering and manufacturing development of a major weapon system*, production of a major weapon system, or sustainment of a major weapon system, negotiates a price for technical data to be delivered under a contract for that development, production, or sustainment.
The Secretary of Defense shall ensure, to the maximum extent practicable, that the Department of Defense, before selecting a contractor for the engineering and manufacturing development of a major weapon system*, production of a major weapon system, or sustainment of a major weapon system, negotiates a price for technical data to be delivered under a contract for such development, production, or sustainment.
Source credit: (Added Pub. L. 115–91, div. A, title VIII, § 835(a)(1), Dec. 12, 2017, 131 Stat. 1471, § 2439; amended Pub. L. 115–232, div. A, title VIII, § 867, Aug. 13, 2018, 132 Stat. 1901; renumbered § 4236, Pub. L. 116–283, div. A, title XVIII, § 1847(c)(3), Jan. 1, 2021, 134 Stat. 4254.)
- 2017Enacted · Pub. L. 115-91 · 131 Stat. 1471
- 2018Amended · Pub. L. 115-232 · 132 Stat. 1901
- 2021Amended · Pub. L. 116-283 · 134 Stat. 4254
A history note hasn’t been published yet. The record shows enactment by Pub. L. 115-91 on 2017-12-12.