10 U.S.C. § 6123 — Acceleration of depleted uranium manufacturing processes
submitted 1 year ago by Pub. L. 119-60 to r/title-10-ARMED-FORCES · 188 words · no verdicts yet
A translation hasn’t been published for this section yet. The official text below is complete and authoritative.
The Administrator* shall require the nuclear security enterprise* to accelerate the modernization of manufacturing processes for depleted uranium by 2030 so that the nuclear security enterprise—
demonstrates bulk cold hearth melting of depleted uranium alloys to augment existing capabilities on an operational basis for war reserve components;
manufactures, on a repeatable and ongoing basis, war reserve depleted uranium alloy components using net shape casting;
demonstrates, if possible, a production facility to conduct routine operations for manufacturing depleted uranium alloy components outside of the current perimeter security fencing of the Y-12 National Security Complex, Oak Ridge, Tennessee; and
has available high purity depleted uranium for the production of war reserve components.
Not later than March 31, 2023, and annually thereafter through 2030, the Administrator shall provide to the congressional defense committees* a briefing on—
progress made in carrying out subsection (a);
the cost of activities conducted under such subsection during the preceding fiscal year; and
the ability of the nuclear security enterprise to convert depleted uranium fluoride hexafluoride to depleted uranium tetrafluoride.
Source credit: (Added Pub. L. 119–60, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1359.)
- 2025Enacted · Pub. L. 119-60 · 139 Stat. 1359
A history note hasn’t been published yet. The record shows enactment by Pub. L. 119-60 on 2025-12-18.
all 0 arguments · sorted by: best
no arguments yet — make the first case