10 U.S.C. § 6153 — Disposition of weapons-usable plutonium at Savannah River Site

submitted 1 year ago by Pub. L. 119-60 to r/title-10-ARMED-FORCES · 1,592 words · no verdicts yet

in plain englishAI-generated · not legal advice

This section required plans, reports, corrective actions, and possible removal of defense plutonium connected with the MOX facility at the Savannah River Site. It also provided possible payments to South Carolina and defines the key terms.

(a) Plan for construction and operation of the MOX facility. (1) By February 1, 2003, the Secretary of Energy had to give Congress a plan to construct and operate the MOX facility at the Savannah River Site in Aiken, South Carolina. (2) The plan had to include (A) a construction and operating schedule that would meet the “MOX production objective” on January 1, 2012, and afterward, and produce 1 metric ton of mixed-oxide fuel by December 31, 2012; and (B) an operating schedule designed to process 34 metric tons of defense plutonium and defense plutonium materials at the site into mixed-oxide fuel by January 1, 2019. (3)(A) From 2004 through 2024, by February 15 each year, the Secretary had to report to Congress on implementing the plan. (B) Reports for years before 2010 had to assess compliance with the paragraph (2) schedules and certify whether the objective could be met by January 2012. (C) Reports for years after 2014 had to say whether the objective was met and assess progress on United States obligations under the Plutonium Management and Disposition Agreement. (D) Reports for years after 2019 also had to assess compliance and, if there was none, give the Secretary’s plan to achieve either (i) compliance or (ii) removal of all remaining defense plutonium and defense plutonium materials from South Carolina.

(b) Corrective actions. (1) If a report showed that construction or operation was at least 12 months behind the applicable subsection (g) schedule, the Secretary had to submit corrective-action plans to Congress by August 15 of that year so the project could meet the objective. (2) A plan submitted after 2008 had to include actions ensuring that the objective would be met. (3) Every such plan had to include milestones for compliance. (4) Before January 1, 2012, if the Secretary found a substantial and material risk that the objective would not be met because milestones in the latest plan were missed, the Secretary had to stop further transfers of defense plutonium and defense plutonium materials for processing until the risk was addressed and the Secretary certified that the objective could be met by 2012. (5) After January 1, 2014, if the Secretary found the objective had not been met because those milestones were missed, the Secretary had to stop such transfers until certifying that the objective could be met. (6)(A) After a determination under (4) or (5), the Secretary had to report to Congress options for removing from South Carolina an amount equal to the amount transferred there after April 15, 2002. (B) The report had to analyze each option, including its cost, implementation schedule, and any National Environmental Policy Act of 1969 requirements for considering or selecting it. (C) After submitting the report, the Secretary had to begin any analysis required under that Act to choose among the options.

(c) If the objective was not met on January 1, 2014, the Secretary had to comply with the National Environmental Policy Act and other applicable laws and remove from South Carolina for storage or disposal elsewhere (1) by January 1, 2016, at least 1 metric ton; and (2) by January 1, 2022, an amount equal to material transferred to the site between April 15, 2002 and January 1, 2022, but not processed by the facility.

(d) Economic and impact assistance. (1) If the objective was not met on January 1, 2016, and appropriations were available, the Secretary had to pay South Carolina each year from then through 2021 $1,000,000 per day, up to $100,000,000 per year, until the later of (A) achievement of the objective that year or (B) removal that year of at least 1 metric ton. (2)(A) If on January 1, 2022 the facility had not processed at least 1 metric ton in each of two consecutive calendar years and 3 metric tons total, the Secretary had to pay South Carolina from available funds $1,000,000 per day, up to $100,000,000 per year, until the Secretary removed material equal to the amount transferred to the site between April 15, 2002 and January 1, 2022 but not processed. (B) This paragraph did not end, replace, or otherwise affect other requirements of this section. (3) If South Carolina obtained an injunction blocking an action needed for a deadline, the deadline was extended by the length of the injunction.

(e) If less than 34 metric tons had been processed by October 1, 2026, the Secretary had to submit a plan by December 1, 2026, and every two years afterward, to (1) finish processing 34 metric tons, or (2) remove from South Carolina an amount equal to material transferred after April 15, 2002 but not processed.

(f) If any mixed-oxide fuel remained at the site one year after permanent cessation of facility operations, the Secretary had to submit either (1) a report stating when it would be transferred for use in commercial nuclear reactors, or (2) a plan to remove it from South Carolina.

(g) By December 31, 2006, the Secretary had to report to Congress on construction and operation, including a fiscal-year-2007 schedule for revising this section’s requirements to match the Secretary’s facility schedule, based on estimated funding.

(h) Definitions. (1) “MOX production objective” means producing mixed-oxide fuel from defense plutonium and defense plutonium materials at an average rate of at least 1 metric ton per year. The average is measured from the date the Nuclear Regulatory Commission declares the facility operational through the assessment date. (2) “MOX facility” means the mixed-oxide fuel fabrication facility at the Savannah River Site in Aiken, South Carolina. (3) “Defense plutonium” and “defense plutonium materials” mean weapons-usable plutonium.

the actual law source: uscode.house.gov ↗public domain
(a)Plan for Construction and Operation of MOX Facility.—
(1)

Not later than February 1, 2003, the Secretary of Energy shall submit to Congress a plan for the construction and operation of the MOX facility at the Savannah River Site, Aiken, South Carolina.

(2)

The plan under paragraph (1) shall include—

(A)

a schedule for construction and operations so as to achieve, as of January 1, 2012, and thereafter, the MOX production objective, and to produce 1 metric ton of mixed-oxide fuel by December 31, 2012; and

(B)

a schedule of operations of the MOX facility designed so that 34 metric tons of defense plutonium and defense plutonium materials at the Savannah River Site will be processed into mixed-oxide fuel by January 1, 2019.

(3)
(A)

Not later than February 15 each year, beginning in 2004 and continuing through 2024, the Secretary shall submit to Congress a report on the implementation of the plan required by paragraph (1).

(B)

Each report under subparagraph (A) for years before 2010 shall include—

(i)

an assessment of compliance with the schedules included with the plan under paragraph (2); and

(ii)

a certification by the Secretary whether or not the MOX production objective can be met by January 2012.

(C)

Each report under subparagraph (A) for years after 2014 shall—

(i)

address whether the MOX production objective has been met; and

(ii)

assess progress toward meeting the obligations of the United States under the Plutonium Management and Disposition Agreement.

(D)

Each report under subparagraph (A) for years after 2019 shall also include an assessment of compliance with the MOX production objective and, if not in compliance, the plan of the Secretary for achieving one of the following:

(i)

Compliance with such objective.

(ii)

Removal of all remaining defense plutonium and defense plutonium materials from the State of South Carolina.

(b)Corrective Actions.—
(1)

If a report under subsection (a)(3) indicates that construction or operation of the MOX facility is behind the applicable schedule under subsection (g) by 12 months or more, the Secretary shall submit to Congress, not later than August 15 of the year in which such report is submitted, a plan for corrective actions to be implemented by the Secretary to ensure that the MOX facility project is capable of meeting the MOX production objective.

(2)

If a plan is submitted under paragraph (1) in any year after 2008, the plan shall include corrective actions to be implemented by the Secretary to ensure that the MOX production objective is met.

(3)

Any plan for corrective actions under paragraph (1) or (2) shall include established milestones under such plan for achieving compliance with the MOX production objective.

(4)

If, before January 1, 2012, the Secretary determines that there is a substantial and material risk that the MOX production objective will not be achieved by 2012 because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until such risk is addressed and the Secretary certifies that the MOX production objective can be met by 2012.

(5)

If, after January 1, 2014, the Secretary determines that the MOX production objective has not been achieved because of a failure to achieve milestones set forth in the most recent corrective action plan under this subsection, the Secretary shall suspend further transfers of defense plutonium and defense plutonium materials to be processed by the MOX facility until the Secretary certifies that the MOX production objective can be met.

(6)
(A)

Upon making a determination under paragraph (4) or (5), the Secretary shall submit to Congress a report on the options for removing from the State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the State of South Carolina after April 15, 2002.

(B)

Each report under subparagraph (A) shall include an analysis of each option set forth in the report, including the cost and schedule for implementation of such option, and any requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) relating to consideration or selection of such option.

(C)

Upon submittal of a report under subparagraph (A), the Secretary shall commence any analysis that may be required under the National Environmental Policy Act of 1969 in order to select among the options set forth in the report.

(c)Contingent Requirement for Removal of Plutonium and Materials From Savannah River Site.—

If the MOX production objective is not achieved as of January 1, 2014, the Secretary shall, consistent with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable laws, remove from the State of South Carolina, for storage or disposal elsewhere—

(1)

not later than January 1, 2016, not less than 1 metric ton of defense plutonium or defense plutonium materials; and

(2)

not later than January 1, 2022, an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.

(d)Economic and Impact Assistance.—
(1)

If the MOX production objective is not achieved as of January 1, 2016, the Secretary shall, subject to the availability of appropriations, pay to the State of South Carolina each year beginning on or after that date through 2021 for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the later of—

(A)

the date on which the MOX production objective is achieved in such year; or

(B)

the date on which the Secretary has removed from the State of South Carolina in such year at least 1 metric ton of defense plutonium or defense plutonium materials.

(2)
(A)

If, as of January 1, 2022, the MOX facility has not processed mixed-oxide fuel from defense plutonium and defense plutonium materials in the amount of not less than—

(i)

one metric ton, in each of any two consecutive calendar years; and

(ii)

three metric tons total,

the Secretary shall, from funds available to the Secretary, pay to the State of South Carolina for economic and impact assistance an amount equal to $1,000,000 per day, not to exceed $100,000,000 per year, until the removal by the Secretary from the State of South Carolina of an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site between April 15, 2002, and January 1, 2022, but not processed by the MOX facility.

(B)

Nothing in this paragraph may be construed to terminate, supersede, or otherwise affect any other requirements of this section.

(3)

If the State of South Carolina obtains an injunction that prohibits the Department of Energy from taking any action necessary for the Department to meet any deadline specified by this subsection, that deadline shall be extended for a period of time equal to the period of time during which the injunction is in effect.

(e)Failure to Complete Planned Disposition Program.—

If less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX facility by October 1, 2026, the Secretary shall, not later than December 1, 2026, and on a biennial basis thereafter, submit to Congress a plan for—

(1)

completing the processing of 34 metric tons of defense plutonium and defense plutonium material by the MOX facility; or

(2)

removing from the State of South Carolina an amount of defense plutonium or defense plutonium materials equal to the amount of defense plutonium or defense plutonium materials transferred to the Savannah River Site after April 15, 2002, but not processed by the MOX facility.

(f)Removal of Mixed-oxide Fuel Upon Completion of Operations of MOX Facility.—

If, one year after the date on which operation of the MOX facility permanently ceases, any mixed-oxide fuel remains at the Savannah River Site, the Secretary shall submit to Congress—

(1)

a report on when such fuel will be transferred for use in commercial nuclear reactors; or

(2)

a plan for removing such fuel from the State of South Carolina.

(g)Baseline.—

Not later than December 31, 2006, the Secretary shall submit to Congress a report on the construction and operation of the MOX facility that includes a schedule for revising the requirements of this section during fiscal year 2007 to conform with the schedule established by the Secretary for the MOX facility, which shall be based on estimated funding levels for the fiscal year.

(h)Definitions.—

In this section:

(1)

The term “MOX production objective” means production at the MOX facility of mixed-oxide fuel from defense plutonium and defense plutonium materials at an average rate equivalent to not less than one metric ton of mixed-oxide fuel per year. The average rate shall be determined by measuring production at the MOX facility from the date the facility is declared operational to the Nuclear Regulatory Commission through the date of assessment.

(2)

The term “MOX facility” means the mixed-oxide fuel fabrication facility at the Savannah River Site, Aiken, South Carolina.

(3)

The terms “defense plutonium” and “defense plutonium materials” mean weapons-usable plutonium.

Source credit: (Added and amended Pub. L. 119–60, div. C, title XXXI, § 3111(a), (d)(2), Dec. 18, 2025, 139 Stat. 1373, 1462.)

history & why it existsrecord from the source credit
  • 2025Enacted · Pub. L. 119-60 · 139 Stat. 1373, 1462

A history note hasn’t been published yet. The record shows enactment by Pub. L. 119-60 on 2025-12-18.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case