42 U.S.C. § 17195Geothermal energy production from oil and gas fields and recovery and production of geopressured gas resources

submitted 19 years ago by Pub. L. 110-140 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 576 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary must fund research and demonstration projects that produce geothermal energy from oil and gas wells and from geopressured resources. At least 3 well-site demonstration projects and a geopressured facilities program are required, each with detailed engineering, cost, and monitoring requirements. No money under this section may pay for drilling new wells.

(a) In general: The Secretary must set up a research, development, demonstration, and commercial-application program supporting geothermal energy production from oil and gas fields, and production and recovery of energy — including electricity — from geopressured resources, along with supporting research and resource characterization. (b) Geothermal energy production from oil and gas fields: The Secretary must run a grant program funding at least 3 demonstration projects using geothermal techniques (such as advanced organic rankine cycle systems) at marginal, unproductive, or productive oil and gas wells. As much as practical, awards should (1) cover at least 5 well sites each; (2) use hot water sources between 150 and 300 degrees Fahrenheit; (3) cover project sizes up to 1 megawatt; (4) be spread across different sites; (5) be replicable elsewhere; (6) help identify the best techniques among competing options; (7) include business plans capable of scaling to high-volume equipment production and wide operational support; and (8) meet any other criteria the Secretary needs to run the program and collect data. The Secretary must favor proposals that address several of these points at once. (c) Grant awards: Each demonstration grant under (b) must include: a site engineering study; a detailed economic assessment of site conditions; feasibility studies on replicability; design or adaptation of existing technology for the site; equipment installation, service, and support; at least 1 year of operation with ongoing monitoring; and validation of the technical and economic assumptions, with lessons learned documented. (d) Geopressured gas resource recovery and production: (1) The Secretary must run a program supporting cost-effective ways to produce energy from geopressured resources. (2) The Secretary must ask for preliminary engineering designs for geopressured production and recovery facilities. (3) Based on those designs, the Secretary must award grants — which can be cost-shared — for detailed engineering and technical plans. (4) Based on the final plans, the Secretary must award cost-shared construction grants for demonstration facilities that show real potential to economically recover heat, kinetic energy, and gas from geopressured resources. (e) Competitive grant selection: At least 90 days after December 19, 2007, the Secretary must run a national solicitation for grants under subsections (b) and (d), choosing recipients competitively using each subsection's own criteria. (f) Well drilling: None of this section's funds may be used to drill new wells.
the actual law source: uscode.house.gov ↗public domain
(a) In general

The Secretary shall establish a program of research, development, demonstration, and commercial application to support development of geothermal energy production from oil and gas fields and production and recovery of energy, including electricity, from geopressured resources. In addition, the Secretary shall conduct such supporting activities including research, resource characterization, and technology development as necessary.

(b) Geothermal energy production from oil and gas fields

The Secretary shall implement a grant program in support of geothermal energy production from oil and gas fields. The program shall include grants for a total of not less than three demonstration projects of the use of geothermal techniques such as advanced organic rankine cycle systems at marginal, unproductive, and productive oil and gas wells. The Secretary shall, to the extent practicable and in the public interest, make awards that—

(1)

include not less than five oil or gas well sites per project award;

(2)

use a range of oil or gas well hot water source temperatures from 150 degrees Fahrenheit to 300 degrees Fahrenheit;

(3)

cover a range of sizes up to one megawatt;

(4)

are located at a range of sites;

(5)

can be replicated at a wide range of sites;

(6)

facilitate identification of optimum techniques among competing alternatives;

(7)

include business commercialization plans that have the potential for production of equipment at high volumes and operation and support at a large number of sites; and

(8)

satisfy other criteria that the Secretary determines are necessary to carry out the program and collect necessary data and information.

The Secretary shall give preference to assessments that address multiple elements contained in paragraphs (1) through (8).

(c) Grant awards

Each grant award for demonstration of geothermal technology such as advanced organic rankine cycle systems at oil and gas wells made by the Secretary under subsection (b) shall include—

(1)

necessary and appropriate site engineering study;

(2)

detailed economic assessment of site specific conditions;

(3)

appropriate feasibility studies to determine whether the demonstration can be replicated;

(4)

design or adaptation of existing technology for site specific circumstances or conditions;

(5)

installation of equipment, service, and support;

(6)

operation for a minimum of 1 year and monitoring for the duration of the demonstration; and

(7)

validation of technical and economic assumptions and documentation of lessons learned.

(d) Geopressured gas resource recovery and production
(1)

The Secretary shall implement a program to support the research, development, demonstration, and commercial application of cost-effective techniques to produce energy from geopressured resources.

(2)

The Secretary shall solicit preliminary engineering designs for geopressured resources production and recovery facilities.

(3)

Based upon a review of the preliminary designs, the Secretary shall award grants, which may be cost-shared, to support the detailed development and completion of engineering, architectural and technical plans needed to support construction of new designs.

(4)

Based upon a review of the final design plans above, the Secretary shall award cost-shared development and construction grants for demonstration geopressured production facilities that show potential for economic recovery of the heat, kinetic energy and gas resources from geopressured resources.

(e) Competitive grant selection

Not less than 90 days after December 19, 2007, the Secretary shall conduct a national solicitation for applications for grants under the programs outlined in subsections (b) and (d). Grant recipients shall be selected on a competitive basis based on criteria in the respective subsection.

(f) Well drilling

No funds may be used under this section for the purpose of drilling new wells.

Source credit: (Pub. L. 110–140, title VI, § 616, Dec. 19, 2007, 121 Stat. 1681.)

history & why it existsrecord from the source credit
  • 2007Enacted · Pub. L. 110-140 · 121 Stat. 1681

A history note hasn’t been published yet. The record shows enactment by Pub. L. 110-140 on 2007-12-19.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case