ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

42 U.S.C. § 17390Voluntary model pathways

submitted 6 years ago by Pub. L. 116-260 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 370 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary of Energy must start voluntary model pathways for grid modernization within 90 days. A steering committee of public, private, and academic experts helps build the pathways. The Secretary may also give technical help to states, tribes, and local governments.

(a) Establishment of voluntary model pathways. (1) Within 90 days after December 27, 2020, the Secretary, working with the steering committee under paragraph (3), must start building voluntary model pathways for modernizing the electric grid through a joint public-private effort that: (A) produces sample policy pathways covering a range of technologies that states and regions can adapt; (B) helps modernize the grid and its communications networks to meet the goals in paragraph (2); (C) keeps the grid reliable, resilient, affordable, safe, and secure; and (D) recognizes that states and regions have different priorities, electric systems, and rate structures. (2) The pathways must help achieve, as far as practical, these goals: (A) near real-time awareness of the electric system; (B) data visualization; (C) advanced monitoring and control of the modern grid; (D) more certainty for investors about grid policy; (E) more innovation; (F) more consumer power; (G) more grid resilience, reliability, and robustness; (H) better (i) integration of distributed energy resources, (ii) interoperability of the electric system, and (iii) predictive modeling and capacity forecasting; (I) lower costs for consumers; and (J) more diverse generation sources. (3) Within 90 days after December 27, 2020, the Secretary must also set up a steering committee to help build the pathways, made up of appointed experts from a mix of public, private, and academic backgrounds, including representatives of (A) FERC, (B) the National Laboratories, (C) states, (D) state regulators, (E) transmission organizations, (F) all parts of the electric power industry, (G) colleges and universities, (H) independent research institutes, and (I) other groups. (b) Technical assistance. The Secretary may give technical help to states, Indian tribes, or local governments to adopt or use parts of the pathways built under subsection (a)(1), including on a trial basis.
the actual law source: uscode.house.gov ↗public domain
(a) Establishment of voluntary model pathways
(1) Establishment

Not later than 90 days after December 27, 2020, the Secretary of Energy (in this section referred to as the “Secretary”), in consultation with the steering committee established under paragraph (3), shall initiate the development of voluntary model pathways for modernizing the electric grid through a collaborative, public-private effort that—

(A)

produces illustrative policy pathways encompassing a diverse range of technologies that can be adapted for State and regional applications by regulators and policymakers;

(B)

facilitates the modernization of the electric grid and associated communications networks to achieve the objectives described in paragraph (2);

(C)

ensures a reliable, resilient, affordable, safe, and secure electric grid; and

(D)

acknowledges and accounts for different priorities, electric systems, and rate structures across States and regions.

(2) Objectives

The pathways established under paragraph (1) shall facilitate achievement of as many of the following objectives as practicable:

(A)

Near real-time situational awareness of the electric system.

(B)

Data visualization.

(C)

Advanced monitoring and control of the advanced electric grid.

(D)

Enhanced certainty of policies for investment in the electric grid.

(E)

Increased innovation.

(F)

Greater consumer empowerment.

(G)

Enhanced grid resilience, reliability, and robustness.

(H)

Improved—

(i)

integration of distributed energy resources;

(ii)

interoperability of the electric system; and

(iii)

predictive modeling and capacity forecasting.

(I)

Reduced cost of service for consumers.

(J)

Diversification of generation sources.

(3) Steering committee

Not later than 90 days after December 27, 2020, the Secretary shall establish a steering committee to help develop the pathways under paragraph (1), to be composed of members appointed by the Secretary, consisting of persons with appropriate expertise representing a diverse range of interests in the public, private, and academic sectors, including representatives of—

(A)

the Federal Energy Regulatory Commission;

(B)

the National Laboratories;

(C)

States;

(D)

State regulatory authorities;

(E)

transmission organizations;

(F)

representatives of all sectors of the electric power industry;

(G)

institutions of higher education;

(H)

independent research institutes; and

(I)

other entities.

(b) Technical assistance

The Secretary may provide technical assistance to States, Indian Tribes, or units of local government to adopt or implement one or more elements of the pathways developed under subsection (a)(1), including on a pilot basis.

Source credit: (Pub. L. 116–260, div. Z, title VIII, § 8008, Dec. 27, 2020, 134 Stat. 2586.)

history & why it existsrecord from the source credit
  • 2020Enacted · Pub. L. 116-260 · 134 Stat. 2586

A history note hasn’t been published yet. The record shows enactment by Pub. L. 116-260 on 2020-12-27.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case