42 U.S.C. § 17391 — Voluntary state, regional, and local electricity distribution planning
submitted 6 years ago by Pub. L. 116-260 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 281 words · no verdicts yet
States, regions, and utilities can ask the Secretary of Energy for help planning grid distribution. The Secretary studies risks and shares open-source planning tools. Anyone can withdraw the request, and the Secretary cannot force anyone to adopt the results.
(a) In general. If a state*, regional organization, or electric utility asks, the Secretary* of Energy must help it build state, regional, or local electricity distribution plans by: (1) assessing and analyzing future demand and distribution needs; and (2) developing open-source tools for planning and operations.
(b) Risk and security analysis. The assessment in (a)(1) must include: (1) evaluating the physical security, cybersecurity, and communications needs of an advanced distribution management system and of integrating distributed energy resources; and (2) using grid architecture analysis to study risks across all hazards, including communications infrastructure, control systems, and power systems.
(c) Designation. Information collected for this assessment: (1) counts as critical electric infrastructure information under section 824o-1 of title 16; and (2) can only be released following the rules for that section.
(d) Technical assistance. To help build these plans, the Secretary must give technical assistance to: (1) states; (2) regional reliability entities; and (3) other owners and operators of distribution assets.
(e) Withdrawal. A state or other entity that asked for help can withdraw the request at any time; once it does, the Secretary must stop all assistance.
(f) Effect. Nothing in this section lets the Secretary force any state, regional organization, regional reliability entity, or asset owner* or operator to adopt any model, tool, plan, analysis, or assessment.
On the request of a State*, regional organization, or electric utility, the Secretary* of Energy shall provide assistance to States, regional organizations, and electric utilities to facilitate the development of State, regional, and local electricity distribution plans by—
conducting a resource assessment and analysis of future demand and distribution requirements; and
developing open source tools for State, regional, and local planning and operations.
The assessment under subsection (a)(1) shall include—
the evaluation of the physical security, cybersecurity, and associated communications needs of an advanced distribution management system and the integration of distributed energy resources; and
advanced use of grid architecture to analyze risks in an all-hazards approach that includes communications infrastructure, control systems architecture, and power systems architecture.
The information collected for the assessment and analysis under subsection (a)(1)—
shall be considered to be critical electric infrastructure information under section 824o–1 of title 16; and
shall only be released in compliance with regulations implementing that section.
For the purpose of assisting in the development of State and regional electricity distribution plans, the Secretary shall provide technical assistance to—
States;
regional reliability entities; and
other distribution asset owners and operators.
A State or any entity that has requested technical assistance under this section may withdraw the request for technical assistance at any time, and on such withdrawal, the Secretary shall terminate all assistance efforts.
Nothing in this section authorizes the Secretary to require any State, regional organization, regional reliability entity, asset owner*, or asset operator to adopt any model, tool, plan, analysis, or assessment.
Source credit: (Pub. L. 116–260, div. Z, title VIII, § 8010, Dec. 27, 2020, 134 Stat. 2588.)
- 2020Enacted · Pub. L. 116-260 · 134 Stat. 2588
A history note hasn’t been published yet. The record shows enactment by Pub. L. 116-260 on 2020-12-27.