42 U.S.C. § 18353 — Maintenance of the United States segment and assurance of continued operations of the International Space Station

submitted 16 years ago by Pub. L. 111-267 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 985 words · no verdicts yet

in plain englishAI-generated · not legal advice

NASA must keep the U.S. part of the Space Station running safely through at least 2030. It must study what spare parts the station needs, report that to Congress, and have the GAO double-check the study. NASA must also fly one more Shuttle mission to the station and keep the Shuttle ready to fly its last scheduled missions.

(a) In general. The Administrator must take all steps needed to keep the U.S. segment of the ISS operating safely, well-maintained, and fully used, through at least September 30, 2030.

(b) Vehicle and component review. NASA must review the station's vehicles and parts. First, as soon as practical after October 11, 2010, the Administrator must fully assess the essential modules, systems, components, structural parts, and permanent scientific equipment on the ISS or planned for delivery there, covering both U.S. and international partner parts. The goal is to identify which spare or replacement modules, systems, parts, and equipment are needed to keep the ISS working completely, safely, and at full scientific use through September 30, 2020. Second, to do this assessment, the Administrator must gather existing data and develop any new data or analysis that's needed but doesn't exist yet.

(c) Reports. NASA and the GAO must report on this. First, on the assessment itself: not later than 90 days after October 11, 2010, the Administrator must send Congress's appropriate committees a report on the assessment. At minimum, the report must describe the spare or replacement parts already being produced, in inventory, or on order — their state of readiness, when they'll be delivered and how, and for each part its size, weight, and launch configuration, its function, its location, and how critical it is to the ISS's integrity. It must separately describe the spare or replacement parts not yet produced, in inventory, or on order, with the same details plus the expected cost and schedule to design, buy, build, and deliver them. And it must give a detailed summary of the delivery schedule and the delivery vehicles needed to transport every essential spare and replacement part, including whether the current schedule and available vehicles can actually meet it. Second, on GAO's review: not later than 90 days after Congress gets that assessment report, the Comptroller General must send Congress's appropriate committees a report evaluating the assessment, including how accurate and reliable its findings are. To make that possible, the Administrator must let the Comptroller General monitor and take part in the assessment.

(d) Utilization of research facilities and capabilities. Research facilities aboard the ISS are handled two ways. Most research facilities and capabilities on the ISS must be planned, managed, and supported as section 18354 describes. But facilities and capabilities related to exploration research and technology, and the ground support and logistics that go with them, must instead be planned, managed, and supported by the right NASA offices and officials, in a way that doesn't get in the way of the other activities under section 18354.

(e) Space Shuttle mission to ISS. NASA must fly one more Shuttle mission to the ISS. First, the Administrator must fly the Launch-On-Need Shuttle mission named in the February 28, 2010 Shuttle Flight Manifest, sometime in fiscal year 2011, but not before June 1, 2011, unless an operational emergency requires it sooner, and pending the results of the safety assessment and the schedule determination below. Second, the Administrator must have the NASA Engineering and Safety Center assess the plans for keeping the Shuttle crew safe, including alternative ways to bring them home if the Shuttle is damaged or can't return safely. Third, the schedule and cargo for this mission must take into account the ISS's supply needs and the findings of that safety study. Fourth, money authorized under section 101(2)(B) is available to pay for this mission.

(f) Space Shuttle manifest flight assurance. NASA must also protect the rest of the Shuttle's flight schedule. First, the Administrator must take all necessary steps to keep the Shuttle able to launch through fiscal year 2011, enough to fly, at minimum, the missions and main payloads listed in the February 28, 2010 flight manifest. Second, the Administrator cannot end any contract that provides the technical work needed to shift Shuttle-derived hardware over to the multi-purpose crew vehicle described in section 18323 or the Space Launch System described in section 18322.

the actual law source: uscode.house.gov ↗public domain
(a) In general

The Administrator shall take all actions necessary to ensure the safe and effective operation, maintenance, and maximum utilization of the United States segment of the ISS through at least September 30, 2030.

(b) Vehicle and component review
(1) In general

The Administrator shall, as soon as is practicable after October 11, 2010, carry out a comprehensive assessment of the essential modules, operational systems and components, structural elements, and permanent scientific equipment on board or planned for delivery and installation aboard the ISS, including both United States and international partner elements, for purposes of identifying the spare or replacement modules, systems and components, elements, and equipment that are required to ensure complete, effective, and safe functioning and full scientific utilization of the ISS through September 30, 2020.1

(2) Data

In carrying out the assessment, the Administrator shall assemble any existing data, and provide for the development of any data or analysis not currently available, that is necessary for purposes of the assessment.

(c) Reports
(1) Report on assessment
(A) Report required

Not later than 90 days after October 11, 2010, the Administrator shall submit to the appropriate committees of Congress a report on the assessment required by subsection (b).

(B) Elements

The report required by this paragraph shall include, at minimum, the following:

(i)

A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are currently produced, in inventory, or on order, a description of the state of their readiness, and a schedule for their delivery to the ISS (including the planned transportation means for such delivery), including for each such module, system or component, element, or equipment a description of—

(I)

its specifications, including size, weight, and necessary configuration for launch and delivery to the ISS;

(II)

its function;

(III)

its location; and

(IV)

its criticality for ISS system integrity.

(ii)

A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are not currently produced, in inventory, or on order, including for each such module, system or component, element, or equipment a description of—

(I)

its specifications, including size, weight, and necessary configuration for launch and delivery to the ISS;

(II)

its function;

(III)

its location;

(IV)

its criticality for ISS system integrity; and

(V)

the anticipated cost and schedule for its design, procurement, manufacture, and delivery to the ISS.

(iii)

A detailed summary of the delivery schedule and associated delivery vehicle requirements necessary to transport all spare and replacement elements considered essential for the ongoing and sustained functionality of all critical systems of the ISS, both in and of themselves and as an element of an integrated, mutually dependent essential capability, including an assessment of the current schedule for delivery, the availability of delivery vehicles to meet that schedule, and the likelihood of meeting that schedule through such vehicles.

(2) GAO report
(A) Report required

Not later than 90 days after the submittal to Congress under paragraph (1) of the assessment required by subsection (b), the Comptroller General of the United States shall submit to the appropriate committees of Congress a report on the assessment. The report shall set forth an evaluation of the assessment by the Comptroller General, including an evaluation of the accuracy and level of confidence in the findings of the assessment.

(B) Cooperation with GAO

The Administrator shall provide for the monitoring and participation of the Comptroller General in the assessment in a manner that permits the Comptroller General to prepare and submit the report required by subparagraph (A).

(d) Utilization of research facilities and capabilities

Utilization of research facilities and capabilities aboard the ISS (other than exploration-related research and technology development facilities and capabilities, and associated ground support and logistics), shall be planned, managed, and supported as provided in section 18354 of this title. Exploration-related research and technology development facilities, capabilities, and associated ground support and logistics shall be planned, managed, and supported by the appropriate NASA organizations and officials in a manner that does not interfere with other activities under section 18354 of this title.

(e) Space Shuttle mission to ISS
(1) Space Shuttle mission

The Administrator shall fly the Launch-On-Need Shuttle mission currently designated in the Shuttle Flight Manifest dated February 28, 2010, to the ISS in fiscal year 2011, but no earlier than June 1, 2011, unless required earlier by an operations contingency, and pending the results of the assessment required by paragraph (2) and the determination under paragraph (3)(A).

(2) Assessment of safe means of return

The Administrator shall provide for an assessment by the NASA Engineering and Safety Center of the procedures and plans developed to ensure the safety of the Space Shuttle crew, and alternative means of return, in the event the Space Shuttle is damaged or otherwise unable to return safely to Earth.

(3) Schedule and payload

The determination of the schedule and payload for the mission authorized by paragraph (1) shall take into account the following:

(A)

The supply and logistics delivery requirements of the ISS.

(B)

The findings of the study required by paragraph (2).

(4) Funds

Amounts authorized to be appropriated by section 101(2)(B) 1 shall be available for the mission authorized by paragraph (1).

(f) Space Shuttle manifest flight assurance
(1) In general

The Administrator shall take all actions necessary to preserve Space Shuttle launch capability through fiscal year 2011 in a manner that enables the launch, at a minimum, of missions and primary payloads in the Shuttle flight manifest as of February 28, 2010.

(2) Continuation of contractor support

The Administrator may not terminate any contract that provides the system transitions necessary for shuttle-derived hardware to be used on either the multi-purpose crew vehicle described in section 18323 of this title or the Space Launch System described in section 18322 of this title.

Source credit: (Pub. L. 111–267, title V, § 503, Oct. 11, 2010, 124 Stat. 2823; Pub. L. 114–90, title I, § 114(b)(2), Nov. 25, 2015, 129 Stat. 716; Pub. L. 117–167, div. B, title VII, § 10815(b), Aug. 9, 2022, 136 Stat. 1737.)

history & why it existsrecord from the source credit
  • 2010Enacted · Pub. L. 111-267 · 124 Stat. 2823
  • 2015Amended · Pub. L. 114-90 · 129 Stat. 716
  • 2022Amended · Pub. L. 117-167 · 136 Stat. 1737