43 U.S.C. § 593a — Construction, operation, and maintenance of Hungry Horse Dam

submitted 82 years ago by ch. 234 to r/title-43-PUBLIC-LANDS · 178 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary of the Interior must proceed with Hungry Horse Dam in Montana for irrigation, reclamation, flood control, navigation, river-flow regulation, electricity, and other beneficial uses. The dam must store at least one million acre-feet and may be completed to the maximum usable and feasible capacity.

For irrigation, reclamation, flood control, navigation, regulation of the South Fork of the Flathead River, electric power, and other beneficial uses mainly in Montana and also downstream, the Secretary of the Interior must proceed as soon as practicable with building, operating, and maintaining Hungry Horse Dam and its electric-generating facilities in Flathead County, Montana. The dam must be high enough to store at least one million acre-feet. The project is subject to the Federal reclamation laws. When needed material is available, the Secretary may complete the dam to provide the maximum usable and feasible reservoir capacity.

the actual law source: uscode.house.gov ↗public domain

For the purpose of irrigation and reclamation of arid lands, for controlling floods, improving navigation, regulating the flow of the South Fork of the Flathead River, for the generation of electric energy, and for other beneficial uses primarily in the State of Montana but also in downstream areas, the Secretary of the Interior is authorized and directed to proceed as soon as practicable with the construction, operation, and maintenance of the proposed Hungry Horse Dam (including facilities for generating electric energy) on the South Fork of the Flathead River, Flathead County, Montana, to such a height as may be necessary to impound not less than one million acre-feet of water. The Hungry Horse project shall be subject to the Federal reclamation laws (Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto).

The Secretary of the Interior is authorized to complete, as soon as the necessary additional material is available, the construction of the Hungry Horse Dam so as to provide a storage reservoir of the maximum usable and feasible capacity.

Source credit: (June 5, 1944, ch. 234, §§ 1, 2, 58 Stat. 270; Pub. L. 85–428, May 29, 1958, 72 Stat. 147.)

history & why it existsrecord from the source credit
  • 1944Enacted · Act of June 5, 1944, ch. 234 · 58 Stat. 270
  • 1958Amended · Pub. L. 85-428 · 72 Stat. 147