42 U.S.C. § 8253 — Energy and water management requirements
submitted 48 years ago by Pub. L. 95-619 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 5,084 words · no verdicts yet
Federal agencies must cut energy use in their buildings and meter energy and water use. Agencies must review large energy investments, evaluate facilities regularly, and report progress to Congress. The Secretary of Energy runs a Federal Energy Management Program to help agencies save energy and water.
(a) Energy performance requirement for Federal buildings — (1) Each agency* must apply energy conservation measures* and improve building designs so that, from fiscal years 2006 through 2015, its Federal buildings, including each industrial or laboratory facility, use less energy per square foot than they did in fiscal year 2003. The required cuts grow every year: 2% in 2006, 4% in 2007, 9% in 2008, 12% in 2009, 15% in 2010, 18% in 2011, 21% in 2012, 24% in 2013, 27% in 2014, and 30% in 2015. (2) An agency can leave out buildings with energy-intensive activities, but must list them in its section 8258(a) reports. (3) By December 31, 2014, the Secretary* had to review how this requirement worked and recommend requirements to Congress for 2016 through 2025.
(b) Energy and water management requirement for Federal agencies — (1) By October 1, 2022, each agency had to start installing, as much as practical, all energy and water conservation measures the Secretary judges life cycle cost*-effective (defined in subsection (f)(1)) in buildings the government owns, and finish installing them as soon as practical after that. (2) If an agency doesn't comply, it must explain why to the Secretary, using guidelines the Secretary sets; by January 1, 2022, and every two years after, the Secretary must report any agency noncompliance to Congress. (3) This subsection doesn't apply to an agency's power-generating or power-transmitting facilities, or to the Department of Energy's uranium enrichment facilities. (4) An agency may join the EPA's "Green Lights" program for technical help meeting these requirements.
(c) Exclusions — (1)(A) An agency head can exclude a building or group of buildings from the requirements in (a) and (b) if they find that: (i) complying would be impractical; (ii) the agency has filed all required energy or water management reports; (iii) the agency already meets the energy and water efficiency rules in this chapter, the Energy Policy Act of 1992, executive orders, and other federal law; and (iv) the agency has already done every practical, cost-effective project* for the building being excluded. (B) A finding that compliance is "impracticable" must be based on either (i) how energy- or water-intensive the building's activities are, or (ii) the building being used for a national security function. (2) Agencies must list excluded buildings in their section 8258(a) reports. The Secretary reviews these exclusions for consistency with the standards in paragraph (1) and can reverse one within 90 days of learning about it; if reversed, the agency must then comply with subsections (a) and (b)(1) for that building. (3) Within 180 days of August 8, 2005, the Secretary had to issue guidelines setting the criteria for these exclusions.
(d) Implementation steps — The Secretary must consult the Secretary of Defense and the GSA Administrator* when writing implementation guidelines. To meet this section's requirements, each agency must: (1) by December 31, 1993, submit a plan to the Secretary describing how it will meet the requirements, including how it will (A) name the staff responsible, (B) find high-priority projects by calculating payback periods, (C) make the most of contracts authorized under subchapter VII, utility financial incentives and services, and other financing, to lower direct costs to the government, and (D) otherwise carry out this part; (2) survey its buildings' energy and water use as needed and update the surveys, using relevant results from the section 8258b survey; (3) use those surveys to work out the cost and payback period of likely conservation measures; (4) install conservation measures using the methods set under section 8254; and (5) keep up the operation and maintenance procedures used under this section.
(e) Metering of energy and water use — (1) By October 1, 2022, following guidelines the Secretary sets under paragraph (2), every federal building* must be metered, to help use energy and water efficiently and cut electricity and water costs. Agencies must use, as much as practical, advanced meters that give data at least daily and measure electricity and water use at least hourly. By October 1, 2016, agencies also had to meter natural gas and steam the same way. This metering data must feed into existing federal energy and water tracking systems and be available to facility managers.
(2) Guidelines — (A) Within 180 days of August 8, 2005, the Secretary, after consulting the Defense Department, GSA, and representatives from the metering, utility, energy services, and energy efficiency industries, efficiency advocacy groups, national laboratories, universities, and facility managers, had to set guidelines for agencies to carry out paragraph (1). (B) These guidelines had to (i) weigh the cost of metering against expected savings, the potential for better energy and water management and savings, the cost and energy and water savings due to utility contract aggregation, and Department of Energy measurement protocols; (ii) recommend how much funding and how many trained staff are needed; (iii) set priorities for which buildings get metered first, and set a schedule of one or more dates, no later than one year after the guidelines came out, on which the requirements would take effect; and (iv) exclude buildings, processes, or structures with only minimal energy or water use. (C) Within 180 days of December 27, 2020, the Secretary had to update these guidelines to also cover water efficiency.
(3) Plan — Within 180 days of that (2)(C) update, each agency, in a report filed under section 8258(a), must submit a plan for carrying out paragraph (1), including (A) who is responsible, and (B) documented proof for any finding that advanced meters aren't practical.
(4) Best practices* report — (A) Within 180 days of December 27, 2020, the Secretary of Energy, with the Secretary of Defense and GSA, had to write and issue a report on best practices for advanced metering of energy and water in federal facilities. (B) That report had to include (i) summaries and analysis of agencies' paragraph (3) plans; (ii) recommendations on standard requirements for automated energy and water management systems, including common communication standards, ways to keep up continuous commissioning and evidence-based maintenance, and cybersecurity standards to stop unauthorized control; and (iii) an analysis of the advanced metering systems being tried or installed in federal buildings and of techniques used outside the federal government.
(f) Use of energy and water efficiency measures in Federal buildings — (1) Definitions used in this subsection: "Commissioning" means a systematic process — from the start of a facility's design through at least a year after construction* finishes — of checking, with proper verification and paperwork, that all the facility's systems work together the way they were designed to and the way the owner* needs, including training the operating staff, with the main goal of fully working systems that can be properly run and kept up for the facility's life. An "energy manager" is the person responsible for following this subsection and cutting a facility's energy use; this can be a contractor, a part-time employee, or someone in charge of several facilities. A "facility" is any federally owned or leased building, installation, structure, or other property, including a group of facilities managed together and contractor-run facilities the government owns; it does not include land where the government doesn't pay the utility bill. A measure is "life cycle cost-effective" if its estimated savings, figured out under section 8254, are more than its estimated costs over its life. "Ongoing commissioning" is a continuing process, using monitored data, meant to keep a facility working at its best over its life. The "payback period" is a measure's setup cost (not counting financing costs) divided by its yearly savings — net energy and water cost savings plus operations, maintenance, repair, and replacement savings; the Secretary can adjust how this is calculated. "Recommissioning" means commissioning a facility again after its original construction and warranty period, to keep it working at its best. "Retrocommissioning" means commissioning a facility or system that was never commissioned when it was built.
(2) Facility energy managers — (A) Each agency must name an energy manager for every facility that meets the criteria in (B). (B) The Secretary must set criteria covering, at minimum, facilities — including central utility plants, distribution systems, and other energy-intensive operations — that make up at least 75% of an agency's energy or water use. (C) Each energy manager must consider using an energy and water management system and whether ISO standard 50001 certification fits the facility.
(3) Energy and water evaluations and commissioning — (A) Starting within 180 days of December 27, 2020, and every year after, each energy manager must fully evaluate and recommission or retrocommission about 25% of the agency's covered facilities each year, so that every facility gets evaluated at least once every four years. (B) A facility doesn't need this evaluation if, at the time it would happen, it: (i) had a full evaluation within the last 8 years; (ii) was commissioned, recommissioned, or retrocommissioned within the last 10 years, or is undergoing ongoing commissioning; (iii) hasn't had a major change in function or use since its last evaluation; (iv) was publicly benchmarked under paragraph (8) within the last year; and (v) either, based on that benchmarking, has achieved at the facility level the most recent cumulative energy savings target under subsection (a), compared with the earlier of the date of the most recent evaluation or the date of the most recent commissioning, recommissioning, or retrocommissioning or the date on which ongoing commissioning began, or has a long-term contract guaranteeing savings at least as large as that target.
(4) Implementation of identified energy and water efficiency measures — (A) Within 2 years of finishing an evaluation, each energy manager must put in place any energy- or water-saving measure the evaluation identified that is life cycle cost-effective, whether judged alone or as part of a bundle. (B) Each agency must use performance contracting for at least half of the identified measures.
(5) Follow-up on implemented measures — For each measure installed, the energy manager must make sure (A) equipment is fully commissioned and working at its design specs when accepted; (B) a plan for proper operation, maintenance, and repair is in place and followed; (C) equipment and system performance is tracked over its whole life; and (D) energy and water savings are measured and verified.
(6) Guidelines — (A) The Secretary must issue guidelines for carrying out paragraphs (2) and (3) within 180 days of December 19, 2007, and for paragraphs (4) and (5) within one year of that date. (B) These guidelines must match each type of funding available under paragraph (10), but can vary by measure type, project size, and other relevant factors.
(7) Web-based certification — (A) For each covered facility, the energy manager must use the web-based tracking system in (B) to certify compliance with the evaluation, implementation, and follow-up requirements in paragraphs (3), (4), and (5), and to publish the facility's energy and water use data. (B) Within one year of December 19, 2007, the Secretary had to build and launch this tracking system, covering, at minimum, which facilities are covered, their compliance status, cost and savings estimates, measured savings, and benchmarking data; the Secretary must also make compliance as easy as possible, using streamlined procedures and coordinating with other reporting requirements. (C) The Secretary must make the tracking system public over the internet for Congress, other agencies, and the public, but may exempt specific facility data from disclosure for national security reasons if an agency asks.
(8) Benchmarking of Federal facilities — (A) The energy manager must enter energy use data for each metered covered building into a benchmarking system, such as the Energy Star Portfolio Manager. (B) Within one year of December 19, 2007, the Secretary had to pick or build a benchmarking system for each building type and issue guidance on using it. (C) Each energy manager must post this benchmarking information on the web-based tracking system, updating it every year and keeping past years' data so performance changes can be tracked over time.
(9) Federal agency scorecards — (A) The OMB Director must issue scorecards twice a year on each agency's energy and water management activities, summarizing how the agency and its energy managers are meeting the requirements, plus any other performance measures the Director thinks fit. (B) The Director must make these scorecards public over the internet.
(10) Funding and implementation — (A) Congress authorized whatever money is needed to carry out this subsection. (B) An agency may use any mix of appropriated funds and private financing — such as energy savings performance contracts or utility energy service contracts — including combining both to pay for the same measure. (C) An agency may carry out these requirements itself or contract out some or all of the work.
(11) Rule of construction — This subsection doesn't require, or rule out, contractor savings guarantees.
(g) Large capital energy investments — (1) Each agency must make sure that any large capital energy investment in an existing building — one that isn't a major renovation but does replace equipment like heating and cooling systems, or that renovates, rehabilitates, expands, or remodels existing space — uses the most energy-efficient, life cycle cost-effective designs, systems, equipment, and controls. (2) Within 180 days of December 19, 2007, each agency had to set up a process for reviewing these investment decisions and report that process to the OMB Director. (3) Within one year of December 19, 2007, the OMB Director had to evaluate and report to Congress on how well each agency was complying with this subsection.
(h) Federal implementation strategy for energy-efficient and energy-saving information technologies — (1) "Director" means the OMB Director; "information technology" has the meaning given in section 11101 of title 40. (2) Within one year of December 27, 2020, each agency had to work with the Director, the Secretary, and the EPA Administrator to build an implementation strategy — with best practices and ways to measure and verify results — for maintaining, buying, and using energy-efficient information technology at its facilities, taking into account the performance goals set under paragraph (4). (3) In building that strategy, agencies had to consider (A) advanced metering infrastructure; (B) energy-efficient data center strategies and better use of assets and infrastructure; (C) advanced power management tools; (D) building information modeling, including energy management; (E) secure telework and travel-substitution tools; and (F) ways to make sure the agency actually captures the cost savings from being more efficient. (4) Performance goals — (A) within 180 days of December 27, 2020, the Director, with the Secretary, had to set performance goals for judging how well agencies improve their energy-efficient information technology; (B) the Chief Information Officers Council, set up under section 3603 of title 44, had to recommend best practices for meeting those goals, including — where the law allows — considering energy savings performance contracting and utility energy services contracting. (5) Reports — (A) each agency must describe its efforts and results under this subsection in its report under section 17143; (B) starting no later than October 1, 2022, the Director must describe agencies' efforts and results in the annual report and scorecard required under section 17144; and (C) the Director may have agencies submit this information using reporting structures already in place as of December 27, 2020.
(i) Federal Energy Management Program — (1) The Secretary must run a program, called the "Federal Energy Management Program," to help the federal government carry out cost-effective energy and water management and energy-related investment practices, in order to (A) coordinate and strengthen federal energy and water resilience, (B) promote environmental stewardship, and (C) cut energy use during periods of unusually high electricity or natural gas demand. (2) The Secretary must appoint a "Federal Director*" — a career Senior Executive Service position — to run the Program.
(3) Program activities — (A) Strategic planning and technical assistance: the Federal Director must (i) give agencies technical help and guidance to identify, install, buy, and track energy and water conservation measures required by this chapter and other laws; (ii) work with GSA to set procedures and best practices for agencies managing utility incentive program contracts under section 8256(c); (iii) carry out the Secretary's duties under section 8287 as the Secretary decides is appropriate; (iv) keep up internet-based information and project-tracking tools for energy and water management; (v) coordinate strategic energy and water resilience planning across agencies; (vi) run a recognition program, including award ceremonies and public announcements, for federal achievement in energy and water management, investment practices, and environmental stewardship; and (vii) promote installing demand-response technology and using demand-response practices in federal buildings.
(B) Energy and water management and reporting: the Federal Director must (i) track and report on agencies' progress meeting this section's requirements; (ii) make agency performance data public under this section and sections 8254, 8256, 8257, and 8258, and under section 15852; (iii) collect energy and water use data from each agency and, based on that data, send each agency a report to help its energy and water management, investment practices, and environmental stewardship; (iv) carry out the Secretary's duties under section 6834; (v) work with GSA's Office of High-Performance Green Buildings to set sustainable design principles for federal facilities; and (vi) designate products meeting the highest conservation standards for categories the Energy Star program (section 6294a) doesn't already cover.
(C) Federal interagency coordination: the Federal Director must (i) build accredited training — in-person, online, and at national events — on energy and water use, management, and resilience, investment practices, and environmental stewardship; (ii) carry out the Secretary's role with the Interagency Energy Management Task Force under section 8257; and (iii) report on carrying out the President's priorities, including executive orders, on federal energy and water use, coordinating with the Office of Management and Budget, the Council on Environmental Quality, and any other group the Federal Director thinks is needed.
(D) Facility and fleet optimization: the Federal Director must give guidance to, help, and track agencies' progress on (i) planning energy and water resilience and project integration across their whole facility portfolio; (ii) meeting sustainable design and energy and water performance standards in new construction and major renovations; (iii) developing guidelines for facility commissioning and for facility operations and maintenance; and (iv) working with GSA to meet statutory and agency goals for federal fleet vehicles.
(4) Management council — The Federal Director must set up a council to advise them, which must (A) meet at least once every quarter, and (B) include representatives from the Council on Environmental Quality, the Office of Management and Budget, and GSA's Office of Federal High-Performance Green Buildings*.
(5) Authorization of appropriations — Congress authorized $36,000,000 for the Secretary, for each of fiscal years 2021 through 2025, to run this subsection.
Subject to paragraph (2), each agency* shall apply energy conservation measures* to, and shall improve the design for the construction* of, the Federal buildings of the agency (including each industrial or laboratory facility) so that the energy consumption per gross square foot of the Federal buildings of the agency in fiscal years 2006 through 2015 is reduced, as compared with the energy consumption per gross square foot of the Federal buildings of the agency in fiscal year 2003, by the percentage specified in the following table:
Fiscal Year | Percentage Reduction |
|---|---|
2006 | 2 |
2007 | 4 |
2008 | 9 |
2009 | 12 |
2010 | 15 |
2011 | 18 |
2012 | 21 |
2013 | 24 |
2014 | 27 |
2015 | 30. |
An agency may exclude from the requirements of paragraph (1) any building, and the associated energy consumption and gross square footage, in which energy intensive activities are carried out. Each agency shall identify and list in each report made under section 8258(a) of this title the buildings designated by it for such exclusion.
Not later than December 31, 2014, the Secretary* shall review the results of the implementation of the energy performance requirement established under paragraph (1) and submit to Congress recommendations concerning energy performance requirements for fiscal years 2016 through 2025.
Each agency shall—
not later than October 1, 2022, to the maximum extent practicable, begin installing in Federal buildings owned by the United States all energy and water conservation measures determined by the Secretary to be life cycle cost*-effective (as defined in subsection (f)(1)); and
complete the installation described in subparagraph (A) as soon as practicable after the date referred to in that subparagraph.
If an agency fails to comply with paragraph (1), the agency shall submit to the Secretary, using guidelines developed by the Secretary, an explanation of the reasons for the failure.
Not later than January 1, 2022, and every 2 years thereafter, the Secretary shall submit to Congress a report that describes any noncompliance by an agency with the requirements of paragraph (1).
This subsection shall not apply to an agency’s facilities that generate or transmit electric energy or to the uranium enrichment facilities operated by the Department of Energy.
An agency may participate in the Environmental Protection Agency’s “Green Lights” program for purposes of receiving technical assistance in complying with the requirements of this section.
The head of each agency may exclude, from the energy or water performance requirement for a fiscal year established under subsection (a) and the energy or water management requirement established under subsection (b), any Federal building* or collection of Federal buildings, if the head of the agency finds that—
compliance with those requirements would be impracticable;
the agency has completed and submitted all federally required energy or water management reports;
the agency has achieved compliance with the energy or water efficiency requirements of this chapter, the Energy Policy Act of 1992, Executive orders, and other Federal law; and
the agency has implemented all practicable, life cycle cost-effective projects with respect to the Federal building or collection of Federal buildings to be excluded.
A finding of impracticability under subparagraph (A)(i) shall be based on—
the energy or water intensiveness of activities carried out in the Federal building or collection of Federal buildings; or
the fact that the Federal building or collection of Federal buildings is used in the performance of a national security function.
Each agency shall identify and list, in each report made under section 8258(a) of this title, the Federal buildings designated by it for such exclusion. The Secretary shall review such findings for consistency with the standards for exclusion set forth in paragraph (1), and may within 90 days after receipt of the findings, reverse the exclusion. In the case of any such reversal, the agency shall comply with the requirements of subsections (a) and (b)(1) for the building concerned.
Not later than 180 days after August 8, 2005, the Secretary shall issue guidelines that establish criteria for exclusions under paragraph (1).
The Secretary shall consult with the Secretary of Defense and the Administrator* of General Services in developing guidelines for the implementation of this part. To meet the requirements of this section, each agency shall—
prepare and submit to the Secretary, not later than December 31, 1993, a plan describing how the agency intends to meet such requirements, including how it will—
designate personnel primarily responsible for achieving such requirements;
identify high priority projects through calculation of payback periods;
take maximum advantage of contracts authorized under subchapter VII of this chapter, of financial incentives and other services provided by utilities for efficiency investment, and of other forms of financing to reduce the direct costs to the Government; and
otherwise implement this part;
perform energy and water surveys of its Federal buildings to the extent necessary and update such surveys as needed, incorporating any relevant information obtained from the survey conducted pursuant to section 8258b of this title;
using such surveys, determine the cost and payback period of energy and water conservation measures likely to achieve the requirements of this section;
install energy and water conservation measures that will achieve the requirements of this section through the methods and procedures established pursuant to section 8254 of this title; and
ensure that the operation and maintenance procedures applied under this section are continued.
By October 1, 2022, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and water and reduction in the cost of electricity and water used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity and water in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary under paragraph (2). Such data shall be incorporated into existing Federal energy and water tracking systems and made available to Federal facility* managers.
Not later than 180 days after August 8, 2005, the Secretary, in consultation with the Department of Defense, the General Services Administration, representatives from the metering industry, utility industry, energy services industry, energy efficiency industry, energy efficiency advocacy organizations, national laboratories, universities, Federal facility managers, and any other person the Secretary deems necessary, shall establish guidelines for agencies to carry out paragraph (1).
The guidelines shall—
take into consideration—
the cost of metering and the reduced cost of operation and maintenance expected to result from metering;
the extent to which metering is expected to result in increased potential for energy and water management, increased potential for energy and water savings and energy and water efficiency improvement, and cost and energy and water savings due to utility contract aggregation; and
the measurement and verification protocols of the Department of Energy;
include recommendations concerning the amount of funds and the number of trained personnel necessary to gather and use the metering information to track and reduce energy and water use;
establish priorities for types and locations of buildings to be metered based on cost-effectiveness and a schedule of one or more dates, not later than 1 year after the date of issuance of the guidelines, on which the requirements specified in paragraph (1) shall take effect; and
establish exclusions from the requirements specified in paragraph (1) based on the de minimis quantity of energy and water use of a Federal building, industrial process, or structure.
Not later than 180 days after December 27, 2020, the Secretary shall update the guidelines established under subparagraph (A) to take into account water efficiency requirements under this section.
Not later than 180 days after the date on which guidelines are updated under paragraph (2)(C), in a report submitted by the agency under section 8258(a) of this title, each agency shall submit to the Secretary a plan describing the manner in which the agency will implement the requirements of paragraph (1), including—
how the agency will designate personnel primarily responsible for achieving the requirements; and
a demonstration by the agency, complete with documentation, of any finding that advanced meters or advanced metering devices (as those terms are used in paragraph (1)), are not practicable.
Not later than 180 days after December 27, 2020, the Secretary of Energy, in consultation with the Secretary of Defense and the Administrator of General Services, shall develop, and issue a report on, best practices for the use of advanced metering of energy and water use in Federal facilities, buildings, and equipment by Federal agencies.
The report shall include, at a minimum—
summaries and analysis of the reports by agencies under paragraph (3);
recommendations on standard requirements or guidelines for automated energy and water management systems, including—
potential common communications standards to allow data sharing and reporting;
means of facilitating continuous commissioning of buildings and evidence-based maintenance of buildings and building systems; and
standards for sufficient levels of security and protection against cyber threats to ensure systems cannot be controlled by unauthorized persons; and
an analysis of—
the types of advanced metering and monitoring systems being piloted, tested, or installed in Federal buildings; and
existing techniques used within the private sector or other non-Federal government buildings.
In this subsection:
The term “commissioning”, with respect to a facility, means a systematic process—
of ensuring, using appropriate verification and documentation, during the period beginning on the initial day of the design phase of the facility and ending not earlier than 1 year after the date of completion of construction of the facility, that all facility systems perform interactively in accordance with—
the design documentation and intent of the facility; and
the operational needs of the owner* of the facility, including preparation of operation personnel; and
the primary goal of which is to ensure fully functional systems that can be properly operated and maintained during the useful life of the facility.
The term “energy manager”, with respect to a facility, means the individual who is responsible for—
ensuring compliance with this subsection by the facility; and
reducing energy use at the facility.
The term “energy manager” may include—
a contractor of a facility;
a part-time employee of a facility; and
an individual who is responsible for multiple facilities.
The term “facility” means any building, installation, structure, or other property (including any applicable fixtures) owned or operated by, or constructed or manufactured and leased to, the Federal Government.
The term “facility” includes—
a group of facilities at a single location or multiple locations managed as an integrated operation; and
contractor-operated facilities owned by the Federal Government.
The term “facility” does not include any land or site for which the cost of utilities is not paid by the Federal Government.
The term “life cycle cost-effective”, with respect to a measure, means a measure, the estimated savings of which exceed the estimated costs over the lifespan of the measure, as determined in accordance with section 8254 of this title.
The term “ongoing commissioning” means an ongoing process of commissioning using monitored data, the primary goal of which is to ensure continuous optimum performance of a facility, in accordance with design or operating needs, over the useful life of the facility, while meeting facility occupancy requirements.
Subject to clause (ii), the term “payback period”, with respect to a measure, means a value equal to the quotient obtained by dividing—
the estimated initial implementation cost of the measure (other than financing costs); by
the annual cost savings resulting from the measure, including—
net savings in estimated energy and water costs; and
operations, maintenance, repair, replacement, and other direct costs.
The Secretary, in guidelines issued pursuant to paragraph (6), may make such modifications and provide such exceptions to the calculation of the payback period of a measure as the Secretary determines to be appropriate to achieve the purposes of this chapter.
The term “recommissioning” means a process—
of commissioning a facility or system beyond the project* development and warranty phases of the facility or system; and
the primary goal of which is to ensure optimum performance of a facility, in accordance with design or current operating needs, over the useful life of the facility, while meeting building occupancy requirements.
The term “retrocommissioning” means a process of commissioning a facility or system that was not commissioned at the time of construction of the facility or system.
Each Federal agency shall designate an energy manager responsible for implementing this subsection and reducing energy and water use at each facility that meets criteria under subparagraph (B).
The Secretary shall develop criteria, after consultation with affected agencies, efficiency advocates, and energy and utility service providers, that cover, at a minimum, Federal facilities, including central utility plants and distribution systems and other energy intensive operations, that constitute at least 75 percent of facility energy or water use at each agency.
An energy manager designated for a facility under subparagraph (A) shall take into consideration—
the use of a system to manage energy and water use at the facility; and
the applicability of the certification of the facility in accordance with the International Organization for Standardization standard numbered 50001 and entitled “Energy Management Systems”.
Except as provided in subparagraph (B), not later than the date that is 180 days after December 27, 2020, and annually thereafter, each energy manager shall complete, for the preceding calendar year, a comprehensive energy and water evaluation and recommissioning or retrocommissioning for approximately 25 percent of the facilities of the applicable agency that meet the criteria under paragraph (2)(B) in a manner that ensures that an evaluation of each facility is completed not less frequently than once every 4 years.
An evaluation and recommissioning or retrocommissioning shall not be required under subparagraph (A) with respect to a facility that, as of the date on which the evaluation and recommissioning or retrocommissioning would occur—
has had a comprehensive energy and water evaluation during the preceding 8-year period;
has been commissioned, recommissioned, or retrocommissioned during the preceding 10-year period; or
is under ongoing commissioning, recommissioning, or retrocomissioning;
has not had a major change in function or use since the previous evaluation and recommissioning or retrocommissioning;
has been benchmarked with public disclosure under paragraph (8) during the preceding calendar year; and
based on the benchmarking described in clause (iv), has achieved at a facility level the most recent cumulative energy savings target under subsection (a) compared to the earlier of—
the date of the most recent evaluation; or
the date—
of the most recent commissioning, recommissioning, or retrocommissioning; or
on which ongoing commissioning began; or
has a long-term contract in place guaranteeing energy savings at least as great as the energy savings target under subclause (I).
Not later than 2 years after the date of completion of each evaluation under paragraph (3), each energy manager shall implement any energy- or water-saving measure that—
the Federal agency identified in the evaluation; and
is life cycle cost-effective, as determined by evaluating an individual measure or a bundle of measures with varying paybacks.
Each Federal agency shall use performance contracting to address at least 50 percent of the measures identified under subparagraph (A)(i).
For each measure implemented under paragraph (4), each energy manager shall ensure that—
equipment, including building and equipment controls, is fully commissioned at acceptance to be operating at design specifications;
a plan for appropriate operations, maintenance, and repair of the equipment is in place at acceptance and is followed;
equipment and system performance is measured during its entire life to ensure proper operations, maintenance, and repair; and
energy and water savings are measured and verified.
The Secretary shall issue guidelines and necessary criteria that each Federal agency shall follow for implementation of—
paragraphs (2) and (3) not later than 180 days after December 19, 2007; and
paragraphs (4) and (5) not later than 1 year after December 19, 2007.
The guidelines issued by the Secretary under subparagraph (A) shall be appropriate and uniform for measures funded with each type of funding made available under paragraph (10), but may distinguish between different types of measures 1 project size, and other criteria the Secretary determines are relevant.
For each facility that meets the criteria established by the Secretary under paragraph (2)(B), the energy manager shall use the web-based tracking system under subparagraph (B)—
to certify compliance with the requirements for—
energy and water evaluations under paragraph (3);
implementation of identified energy and water measures under paragraph (4); and
follow-up on implemented measures under paragraph (5); and
to publish energy and water consumption data on an individual facility basis.
Not later than 1 year after December 19, 2007, the Secretary shall develop and deploy a web-based tracking system required under this paragraph in a manner that tracks, at a minimum—
the covered facilities;
the status of meeting the requirements specified in subparagraph (A);
the estimated cost and savings for measures required to be implemented in a facility;
the measured savings and persistence of savings for implemented measures; and
the benchmarking information disclosed under paragraph (8)(C).
The Secretary shall ensure that energy manager compliance with the requirements in this paragraph, to the maximum extent practicable—
can be accomplished with the use of streamlined procedures and templates that minimize the time demands on Federal employees; and
is coordinated with other applicable energy and water reporting requirements.
Subject to clause (ii), the Secretary shall make the web-based tracking system required under this paragraph available to Congress, other Federal agencies, and the public through the Internet.
At the request of a Federal agency, the Secretary may exempt specific data for specific facilities from disclosure under clause (i) for national security purposes.
The energy manager shall enter energy use data for each metered building that is (or is a part of) a facility that meets the criteria established by the Secretary under paragraph (2)(B) into a building energy use benchmarking system, such as the Energy Star Portfolio Manager.
Not later than 1 year after December 19, 2007, the Secretary shall—
select or develop the building energy use benchmarking system required under this paragraph for each type of building; and
issue guidance for use of the system.
Each energy manager shall post the information entered into, or generated by, a benchmarking system under this subsection, on the web-based tracking system under paragraph (7)(B). The energy manager shall update such information each year, and shall include in such reporting previous years’ information to allow changes in building performance to be tracked over time.
The Director of the Office of Management and Budget shall issue semiannual scorecards for energy and water management activities carried out by each Federal agency that includes—
summaries of the status of implementing the various requirements of the agency and its energy managers under this subsection; and
any other means of measuring performance that the Director considers appropriate.
The Director shall make the scorecards required under this paragraph available to Congress, other Federal agencies, and the public through the Internet.
There are authorized to be appropriated such sums as are necessary to carry out this subsection.
To carry out this subsection, a Federal agency may use any combination of—
appropriated funds made available under subparagraph (A); and
private financing otherwise authorized under Federal law, including financing available through energy savings performance contracts or utility energy service contracts.
A Federal agency may use any combination of appropriated funds and private financing described in clause (i) to carry out the same measure under this subsection.
Each Federal agency may implement the requirements under this subsection itself or may contract out performance of some or all of the requirements.
This subsection shall not be construed to require or to obviate any contractor savings guarantees.
Each Federal agency shall ensure that any large capital energy investment in an existing building that is not a major renovation but involves replacement of installed equipment (such as heating and cooling systems), or involves renovation, rehabilitation, expansion, or remodeling of existing space, employs the most energy efficient designs, systems, equipment, and controls that are life-cycle cost effective.
Not later than 180 days after December 19, 2007, each Federal agency shall—
develop a process for reviewing each decision made on a large capital energy investment described in paragraph (1) to ensure that the requirements of this subsection are met; and
report to the Director of the Office of Management and Budget on the process established.
Not later than 1 year after December 19, 2007, the Director of the Office of Management and Budget shall evaluate and report to Congress on the compliance of each agency with this subsection.
In this subsection:
The term “Director” means the Director of the Office of Management and Budget.
The term “information technology” has the meaning given that term in section 11101 of title 40.
Not later than 1 year after December 27, 2020, each Federal agency shall coordinate with the Director, the Secretary, and the Administrator of the Environmental Protection Agency to develop an implementation strategy (including best-practices and measurement and verification techniques) for the maintenance, purchase, and use by the Federal agency of energy-efficient and energy-saving information technologies at or for facilities owned and operated by the Federal agency, taking into consideration the performance goals established under paragraph (4).
In developing an implementation strategy under paragraph (2), each Federal agency shall consider—
advanced metering infrastructure;
energy efficient data center strategies and methods of increasing asset and infrastructure utilization;
advanced power management tools;
building information modeling, including building energy management;
secure telework and travel substitution tools; and
mechanisms to ensure that the agency realizes the energy cost savings of increased efficiency and utilization.
Not later than 180 days after December 27, 2020, the Director, in consultation with the Secretary, shall establish performance goals for evaluating the efforts of Federal agencies in improving the maintenance, purchase, and use of energy-efficient and energy-saving information technology at or for facilities owned and operated by the Federal agencies.
The Chief Information Officers Council established under section 3603 of title 44, shall recommend best practices for the attainment of the performance goals established under subparagraph (A), which shall include, to the extent applicable by law, consideration by a Federal agency of the use of—
energy savings performance contracting; and
utility energy services contracting.
Each Federal agency shall include in the report of the agency under section 17143 of this title a description of the efforts and results of the agency under this subsection.
Effective beginning not later than October 1, 2022, the Director shall include in the annual report and scorecard of the Director required under section 17144 of this title a description of the efforts and results of Federal agencies under this subsection.
The Director may require Federal agencies to submit any information required to be submitted under this subsection though reporting structures in use as of December 27, 2020.
The Secretary shall carry out a program, to be known as the “Federal Energy Management Program” (referred to in this subsection as the “Program”), to facilitate the implementation by the Federal Government of cost-effective energy and water management and energy-related investment practices—
to coordinate and strengthen Federal energy and water resilience;
to promote environmental stewardship; and
to reduce energy consumption during periods of unusually high electricity or natural gas demand.
The Secretary shall appoint an individual to serve as the director of the Program (referred to in this subsection as the “Federal Director”), which shall be a career position in the Senior Executive service, to administer the Program.
In administering the Program, the Federal Director shall—
provide technical assistance and project implementation support and guidance to agencies to identify, implement, procure, and track energy and water conservation measures required under this chapter and under other provisions of law;
in coordination with the Administrator of the General Services Administration, establish appropriate procedures, methods, and best practices for use by agencies to select, monitor, and terminate contracts entered into pursuant to a utility incentive program under section 8256(c) of this title with utilities;
carry out the responsibilities of the Secretary under section 8287 of this title, as determined appropriate by the Secretary;
establish and maintain internet-based information resources and project tracking systems and tools for energy and water management;
coordinate comprehensive and strategic approaches to energy and water resilience planning for agencies;
establish a recognition program for Federal achievement in energy and water management, energy-related investment practices, environmental stewardship, and other relevant areas, through events such as individual recognition award ceremonies and public announcements; and
promote the installation of demand-response technology and the use of demand-response practices in Federal buildings.
In administering the Program, the Federal Director shall—
track and report on the progress of agencies in meeting the requirements of the agency under this section;
make publicly available agency performance data required under—
this section and sections 8254, 8256, 8257, and 8258 of this title; and
section 15852 of this title;
collect energy and water use and consumption data from each agency; and
based on that data, submit to each agency a report that will facilitate the energy and water management, energy-related investment practices, and environmental stewardship of the agency in support of Federal goals under this chapter and under other provisions of law;
carry out the responsibilities of the Secretary under section 6834 of this title;
in consultation with the Administrator of the General Services Administration, acting through the head of the Office of High-Performance Green Buildings, establish and implement sustainable design principles for Federal facilities; and
designate products that meet the highest energy conservation standards for categories not covered under the Energy Star program established under section 6294a of this title.
In administering the Program, the Federal Director shall—
develop and implement accredited training consistent with existing Federal programs and activities—
relating to energy and water use, management, and resilience in Federal facilities, energy-related investment practices, and environmental stewardship; and
that includes in-person training, internet-based programs, and national in-person training events;
carry out the functions of the Secretary with respect to the Interagency Energy Management Task Force under section 8257 of this title; and
report on the implementation of the priorities of the President, including Executive orders, relating to energy and water use in Federal facilities, in coordination with—
the Office of Management and Budget;
the Council on Environmental Quality; and
any other entity, as considered necessary by the Federal Director.
In administering the Program, the Federal Director shall develop guidance, supply assistance to, and track the progress of agencies—
in conducting portfolio-wide facility energy and water resilience planning and project integration;
in building new construction and major renovations to meet the sustainable design and energy and water performance standards required under this section;
in developing guidelines for—
facility commissioning; and
facility operations and maintenance; and
in coordination with the Administrator of the General Services Administration, in meeting statutory and agency goals for Federal fleet vehicles.
The Federal Director shall establish a management council to advise the Federal Director that shall—
convene not less frequently than once every quarter; and
consist of representatives from—
the Council on Environmental Quality;
the Office of Management and Budget; and
the Office of Federal High-Performance Green Buildings* in the General Services Administration.
There is authorized to be appropriated to the Secretary to carry out this subsection $36,000,000 for each of fiscal years 2021 through 2025.
Source credit: (Pub. L. 95–619, title V, § 543, Nov. 9, 1978, 92 Stat. 3277; Pub. L. 100–615, § 2(a), Nov. 5, 1988, 102 Stat. 3185; Pub. L. 102–486, title I, § 152(b), (c), Oct. 24, 1992, 106 Stat. 2844, 2845; Pub. L. 104–66, title I, § 1052(b), Dec. 21, 1995, 109 Stat. 718; Pub. L. 109–58, title I, §§ 102(a)(1), (b)–(e), 103, Aug. 8, 2005, 119 Stat. 606–608; Pub. L. 110–140, title IV, §§ 431, 432, 434, Dec. 19, 2007, 121 Stat. 1607, 1614; Pub. L. 112–210, §§ 8, 9, Dec. 18, 2012, 126 Stat. 1521, 1522; Pub. L. 116–260, div. Z, title I, §§ 1002(g), 1004, 1012, Dec. 27, 2020, 134 Stat. 2423, 2428, 2447; Pub. L. 117–58, div. D, title I, § 40104(c), Nov. 15, 2021, 135 Stat. 932.)
- 1978Enacted · Pub. L. 95-619 · 92 Stat. 3277
- 1988Amended · Pub. L. 100-615 · 102 Stat. 3185
- 1992Amended · Pub. L. 102-486 · 106 Stat. 2844, 2845
- 1995Amended · Pub. L. 104-66 · 109 Stat. 718
- 2005Amended · Pub. L. 109-58 · 119 Stat. 606
- 2007Amended · Pub. L. 110-140 · 121 Stat. 1607, 1614
- 2012Amended · Pub. L. 112-210 · 126 Stat. 1521, 1522
- 2020Amended · Pub. L. 116-260 · 134 Stat. 2423, 2428, 2447
- 2021Amended · Pub. L. 117-58 · 135 Stat. 932
A history note hasn’t been published yet. The record shows enactment by Pub. L. 95-619 on 1978-11-09.
all 0 arguments · sorted by: best
no arguments yet — make the first case