ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

49 U.S.C. § 60126Risk management

submitted 30 years ago by Pub. L. 104-304 to r/title-49-TRANSPORTATION · 813 words · no verdicts yet

in plain englishAI-generated · not legal advice

The Secretary ran voluntary demonstration projects letting operators use risk-management plans instead of standard rules. Approved plans needed to keep safety equal to or better than the usual standards. The Secretary reported to Congress on the results and whether to make risk management permanent.

(a) Risk Management Program Demonstration Projects. (1) The Secretary had to set up demonstration projects that: (A) let gas and hazardous liquid pipeline owners and operators voluntarily try out risk management; and (B) evaluated how safe and cost-effective that approach was. (2) While running a project, the Secretary, by order: (A) could exempt a participating ("covered") pipeline facility from all or part of this chapter's usual requirements; and (B) had to exempt that facility, for the project's length, from any new standard the Secretary issued during that time. (b) Requirements. In running a demonstration project, the Secretary had to: (1) invite owners and operators to submit risk management plans for timely approval; (2) require, before approving a plan, that it deliver a level of safety equal to or better than following the chapter's normal standards; (3) build the project around: (A) joint government-industry training; (B) ways to measure how well the safety plans work; (C) developing and using new technologies; (D) helping communities understand how safety would be kept up or improved; (E) building models that rank each facility's risks, based on its location, volume, pressure, and what it carries; (F) using risk assessment methods suited to the risks those models reveal; (G) making sure participants can show they are managing those risks well, and that their plans can be audited; (H) a process letting an operator end its plan, or — with the Secretary's approval — change it, in response to (i) changed circumstances, or (ii) the Secretary deciding the operator isn't achieving that equal-or-better safety level; (I) any other elements the Secretary and participating operators agree would help meet the section's goals; and (J) a chance for public comment before approval; and (4) when picking participants, consider each applicant's past safety and regulatory record. (c) Emergencies and Revocations. Nothing here limits the Secretary's usual emergency powers. The Secretary can revoke an exemption if an operator seriously fails to follow its approved plan. (d) Participation by State Authority. The Secretary could consult a state that has a certification under section 60105. For projects involving an intrastate gas or hazardous liquid pipeline, the Secretary could let that state agency handle approving and running the project. (e) Report. By March 31, 2000, the Secretary had to send Congress a report on the demonstration projects' results, including: (1) an evaluation of each project, including how each participant did on safety and environmental protection; and (2) recommendations on whether to make risk management a permanent, standard part of the federal pipeline safety program.
the actual law source: uscode.house.gov ↗public domain
(a)Risk Management Program Demonstration Projects.—
(1)In general.—

The Secretary shall establish risk management demonstration projects—

(A)

to demonstrate, through the voluntary participation by owners and operators of gas pipeline facilities and hazardous liquid pipeline facilities, the application of risk management; and

(B)

to evaluate the safety and cost-effectiveness of the program.

(2)Exemptions.—

In carrying out a demonstration project under this subsection, the Secretary, by order—

(A)

may exempt an owner or operator of the pipeline facility covered under the project (referred to in this subsection as a “covered pipeline facility”), from the applicability of all or a portion of the requirements under this chapter that would otherwise apply to the covered pipeline facility; and

(B)

shall exempt, for the period of the project, an owner or operator of the covered pipeline facility, from the applicability of any new standard that the Secretary promulgates under this chapter during the period of that participation, with respect to the covered facility.

(b)Requirements.—

In carrying out a demonstration project under this section, the Secretary shall—

(1)

invite owners and operators of pipeline facilities to submit risk management plans for timely approval by the Secretary;

(2)

require, as a condition of approval, that a risk management plan submitted under this subsection contain measures that are designed to achieve an equivalent or greater overall level of safety than would otherwise be achieved through compliance with the standards contained in this chapter or promulgated by the Secretary under this chapter;

(3)

provide for—

(A)

collaborative government and industry training;

(B)

methods to measure the safety performance of risk management plans;

(C)

the development and application of new technologies;

(D)

the promotion of community awareness concerning how the overall level of safety will be maintained or enhanced by the demonstration project;

(E)

the development of models that categorize the risks inherent to each covered pipeline facility, taking into consideration the location, volume, pressure, and material transported or stored by that pipeline facility;

(F)

the application of risk assessment and risk management methodologies that are suitable to the inherent risks that are determined to exist through the use of models developed under subparagraph (E);

(G)

the development of project elements that are necessary to ensure that—

(i)

the owners and operators that participate in the demonstration project demonstrate that they are effectively managing the risks referred to in subparagraph (E); and

(ii)

the risk management plans carried out under the demonstration project under this subsection can be audited;

(H)

a process whereby an owner or operator of a pipeline facility is able to terminate a risk management plan or, with the approval of the Secretary, to amend, modify, or otherwise adjust a risk management plan referred to in paragraph (1) that has been approved by the Secretary pursuant to that paragraph to respond to—

(i)

changed circumstances; or

(ii)

a determination by the Secretary that the owner or operator is not achieving an overall level of safety that is at least equivalent to the level that would otherwise be achieved through compliance with the standards contained in this chapter or promulgated by the Secretary under this chapter;

(I)

such other elements as the Secretary, with the agreement of the owners and operators that participate in the demonstration project under this section, determines to further the purposes of this section; and

(J)

an opportunity for public comment in the approval process; and

(4)

in selecting participants for the demonstration project, take into consideration the past safety and regulatory performance of each applicant who submits a risk management plan pursuant to paragraph (1).

(c)Emergencies and Revocations.—

Nothing in this section diminishes or modifies the Secretary’s authority under this title to act in case of an emergency. The Secretary may revoke any exemption granted under this section for substantial noncompliance with the terms and conditions of an approved risk management plan.

(d)Participation by State Authority.—

In carrying out this section, the Secretary may provide for consultation by a State that has in effect a certification under section 60105. To the extent that a demonstration project comprises an intrastate natural gas pipeline or an intrastate hazardous liquid pipeline facility, the Secretary may make an agreement with the State agency to carry out the duties of the Secretary for approval and administration of the project.

(e)Report.—

Not later than March 31, 2000, the Secretary shall transmit to the Congress a report on the results of the demonstration projects carried out under this section that includes—

(1)

an evaluation of each such demonstration project, including an evaluation of the performance of each participant in that project with respect to safety and environmental protection; and

(2)

recommendations concerning whether the applications of risk management demonstrated under the demonstration project should be incorporated into the Federal pipeline safety program under this chapter on a permanent basis.

Source credit: (Added Pub. L. 104–304, § 5(a), Oct. 12, 1996, 110 Stat. 3798.)

history & why it existsrecord from the source credit
  • 1996Enacted · Pub. L. 104-304 · 110 Stat. 3798

A history note hasn’t been published yet. The record shows enactment by Pub. L. 104-304 on 1996-10-12.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case