42 U.S.C. § 18385On-going restoration of radioisotope thermoelectric generator material production

submitted 16 years ago by Pub. L. 111-267 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 311 words · no verdicts yet

in plain englishAI-generated · not legal advice

Congress found that NASA is running low on the fuel it needs to power deep-space missions, called radioisotope power systems, and relying on Russia isn't safe. NASA and the Energy Department must restart U.S. production of this fuel starting in fiscal year 2011. They must report to Congress within 120 days on their plan and schedule.

(a) Findings. Congress made six findings. The U.S. has led the world in scientific space exploration for almost 50 years. Missions like Viking, Voyager, Cassini, and New Horizons have taught us a lot about the solar system's planets. Radioisotope power systems are the only power source available for deep space missions, letting spacecraft reach places like Mars, Jupiter, Saturn, and Pluto and keep working for a long time. Current supplies and production of these power systems won't fully cover NASA's planned missions even over the next decade, and without new domestic production, the U.S. won't be able to explore most of the solar system by the end of the decade. Relying on Russia or other foreign sources for this fuel isn't a secure option. And restarting domestic production takes a long lead time, so a restart project needs to begin as soon as possible to meet future mission needs. (b) In general. The Administrator must work with the Secretary of Energy, starting in fiscal year 2011, on a joint plan to restart and sustain domestic production of radioisotope thermoelectric generator material for deep space and other science and exploration missions. Money this chapter authorizes for NASA must be made available to the Department of Energy, through a reimbursable agreement, to rebuild the facilities needed to produce this fuel. (c) Report. Within 120 days after October 11, 2010, the Administrator and the Secretary of Energy must send Congress's appropriate committees a joint report on their coordinated agreements, their implementation plans, and the schedule, production amounts, and mission uses expected under this section.
the actual law source: uscode.house.gov ↗public domain
(a) Findings

The Congress finds the following:

(1)

The United States has led the world in the scientific exploration of space for nearly 50 years.

(2)

Missions such as Viking, Voyager, Cassini, and New Horizons have greatly expanded knowledge of our solar system and planetary characteristics and evolution.

(3)

Radioisotope power systems are the only available power sources for deep space missions making it possible to travel to such distant destinations as Mars, Jupiter, Saturn, Pluto, and beyond and maintain operational control and systems viability for extended mission durations.

(4)

Current radioisotope power systems supplies and production will not fully support NASA missions planned even in the next decade and, without a new domestic production capability, the United States will no longer have the means to explore the majority of the solar system by the end of this decade.

(5)

Continuing to rely on Russia or other foreign sources for radioisotope power system fuel production is not a secure option.

(6)

Reestablishing domestic production will require a long lead-time. Thus, meeting future space exploration mission needs requires that a restart project begin at the earliest opportunity.

(b) In general

The Administrator shall, in coordination with the Secretary of Energy, pursue a joint approach beginning in fiscal year 2011 towards restarting and sustaining the domestic production of radioisotope thermoelectric generator material for deep space and other science and exploration missions. Funds authorized by this chapter for NASA shall be made available under a reimbursable agreement with the Department of Energy for the purpose of reestablishing facilities to produce fuel required for radioisotope thermoelectric generators to enable future missions.

(c) Report

Within 120 days after October 11, 2010, the Administrator and the Secretary of Energy shall submit a joint report to the appropriate committees of Congress on coordinated agreements, planned implementation, and anticipated schedule, production quantities, and mission applications under this section.

Source credit: (Pub. L. 111–267, title VIII, § 806, Oct. 11, 2010, 124 Stat. 2833.)

history & why it existsrecord from the source credit
  • 2010Enacted · Pub. L. 111-267 · 124 Stat. 2833

A history note hasn’t been published yet. The record shows enactment by Pub. L. 111-267 on 2010-10-11.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case