42 U.S.C. § 7651k — Monitoring, reporting, and recordkeeping requirements

submitted 71 years ago by Pub. L. 101-549 to r/title-42-THE-PUBLIC-HEALTH-AND-WELFARE · 550 words · no verdicts yet

in plain englishAI-generated · not legal advice

Owners of covered sources must install monitors that track sulfur dioxide, nitrogen oxides, opacity, and flow. EPA sets deadlines and rules for monitoring, recordkeeping, and reporting. If data is missing, EPA assumes the unit ran uncontrolled and charges fees for that period.

(a) Applicability: Owners and operators of any source under this subchapter must install and run continuous emissions monitoring systems (CEMS) on each affected unit, and make sure the data for sulfur dioxide, nitrogen oxides, opacity, and flow volume is accurate ("quality assured"). Within 18 months of November 15, 1990, EPA must issue rules spelling out the CEMS requirements, rules for any alternative monitoring system shown to be just as precise, reliable, accessible, and timely as CEMS, and rules for keeping records and reporting the data. These rules may limit alternative compliance methods for units using an alternative monitoring system, as needed to keep the allowance system working properly and to make sure the pollution cuts the law intends actually happen. When two or more units share one stack, they don't each need a separate CEMS — instead, EPA's rules must require the owner to gather enough information to reliably determine each unit's compliance.

(b) First phase requirements: By 36 months after November 15, 1990, owners of each affected unit under section 7651c — including units that become affected under subsections (b) and (c) of that section, and eligible units under its subsection (d) — must install and run CEMS, quality-assure the data, and keep records and file reports as (a)'s regulations require.

(c) Second phase requirements: By January 1, 1995, owners of any affected unit that hasn't already met (a) and (b)'s requirements must install and run CEMS, quality-assure the data, and keep records and reports under (a)'s rules. Any new utility unit must meet (a)'s requirements as soon as it starts commercial operation.

(d) Unavailability of emissions data: If CEMS data (or approved alternative-monitoring data) is missing for any part of a year when it's required, and the owner can't give EPA satisfactory information about emissions during that gap, EPA treats the unit as if it ran uncontrolled for the whole period the data was missing. EPA must issue rules, within 18 months of November 15, 1990, for how to calculate emissions in that situation. The owner is then liable for excess-emissions fees and offsets under section 7651j based on those calculated numbers. Paying such a fee doesn't reduce any other fine, penalty, fee, or assessment owed for the same violation under any other part of this chapter.

(e) Prohibition: It's illegal for an owner of a source covered by this subchapter to operate it without meeting this section's requirements and any regulations that implement it.

the actual law source: uscode.house.gov ↗public domain
(a) Applicability

The owner and operator of any source subject to this subchapter shall be required to install and operate CEMS on each affected unit at the source, and to quality assure the data for sulfur dioxide, nitrogen oxides, opacity and volumetric flow at each such unit. The Administrator shall, by regulations issued not later than eighteen months after November 15, 1990, specify the requirements for CEMS, for any alternative monitoring system that is demonstrated as providing information with the same precision, reliability, accessibility, and timeliness as that provided by CEMS, and for recordkeeping and reporting of information from such systems. Such regulations may include limitations or the use of alternative compliance methods by units equipped with an alternative monitoring system as may be necessary to preserve the orderly functioning of the allowance system, and which will ensure the emissions reductions contemplated by this subchapter. Where 2 or more units utilize a single stack, a separate CEMS shall not be required for each unit, and for such units the regulations shall require that the owner or operator collect sufficient information to permit reliable compliance determinations for each such unit.

(b) First phase requirements

Not later than thirty-six months after November 15, 1990, the owner or operator of each affected unit under section 7651c of this title, including, but not limited to, units that become affected units pursuant to subsections (b) and (c) and eligible units under subsection (d), shall install and operate CEMS, quality assure the data, and keep records and reports in accordance with the regulations issued under subsection (a).

(c) Second phase requirements

Not later than January 1, 1995, the owner or operator of each affected unit that has not previously met the requirements of subsections (a) and (b) shall install and operate CEMS, quality assure the data, and keep records and reports in accordance with the regulations issued under subsection (a). Upon commencement of commercial operation of each new utility unit, the unit shall comply with the requirements of subsection (a).

(d) Unavailability of emissions data

If CEMS data or data from an alternative monitoring system approved by the Administrator under subsection (a) is not available for any affected unit during any period of a calendar year in which such data is required under this subchapter, and the owner or operator cannot provide information, satisfactory to the Administrator, on emissions during that period, the Administrator shall deem the unit to be operating in an uncontrolled manner during the entire period for which the data was not available and shall, by regulation which shall be issued not later than eighteen months after November 15, 1990, prescribe means to calculate emissions for that period. The owner or operator shall be liable for excess emissions fees and offsets under section 7651j of this title in accordance with such regulations. Any fee due and payable under this subsection shall not diminish the liability of the unit’s owner or operator for any fine, penalty, fee or assessment against the unit for the same violation under any other section of this chapter.

(e) Prohibition

It shall be unlawful for the owner or operator of any source subject to this subchapter to operate a source without complying with the requirements of this section, and any regulations implementing this section.

Source credit: (July 14, 1955, ch. 360, title IV, § 412, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2624.)

history & why it existsrecord from the source credit
  • 1955Enacted · Pub. L. 101-549 · 104 Stat. 2624

A history note hasn’t been published yet. The record shows enactment by Pub. L. 101-549 on 1955-07-14.