ALLcrimesfood&drugstaxestelecomcommercehealthconservationtransportationagricultureveteransbrowse all titles »
0

54 U.S.C. § 101301Maintenance management system

submitted 12 years ago by Pub. L. 113-287 to r/title-54-NATIONAL-PARK-SERVICE-AND-RELATED-PROGRAMS · 208 words · no verdicts yet

in plain englishAI-generated · not legal advice

The National Park Service must run a system to plan and track maintenance work. The system tracks all park assets, sets work standards, schedules tasks, and compares planned costs against actual results.

The Service must implement a maintenance management system for the maintenance and operations programs of the National Park System. This system must include seven elements. (1) A workload inventory of assets. This is detailed information that measures, for every asset — including buildings, roads, utility systems, and grounds — the features that affect what kind of maintenance work it needs. (2) A set of maintenance tasks. These describe the actual maintenance work done in each System unit. (3) A description of work standards. This covers: (A) how often maintenance happens; (B) a measurable quality standard for how well-maintained each asset should be; (C) the methods used to do the work; (D) the labor, equipment, and material needed; and (E) how much work a worker is expected to produce for each task. (4) A work program and performance budget. This creates an annual plan that identifies maintenance needs and the money set aside for each task. (5) A work schedule. This identifies and prioritizes which tasks get done during a specific time period, and specifies the labor needed. (6) Work orders. These authorize specific jobs and record the work that was actually done, including labor and material costs. (7) Reports and special analyses. These compare what was planned against what actually happened, in both work and cost, so maintenance operations can be evaluated.
the actual law source: uscode.house.gov ↗public domain

The Service shall implement a maintenance management system in the maintenance and operations programs of the System. The system shall include the following elements:

(1)

A workload inventory of assets including detailed information that quantifies for all assets (including buildings, roads, utility systems, and grounds that must be maintained) the characteristics affecting the type of maintenance work performed.

(2)

A set of maintenance tasks that describe the maintenance work in each System unit.

(3)

A description of work standards including—

(A)

frequency of maintenance;

(B)

measurable quality standard to which assets should be maintained;

(C)

methods for accomplishing work;

(D)

required labor, equipment, and material resources; and

(E)

expected worker production for each maintenance task.

(4)

A work program and performance budget that develops an annual work plan identifying maintenance needs and financial resources to be devoted to each maintenance task.

(5)

A work schedule that identifies and prioritizes tasks to be done in a specific time period and specifies required labor resources.

(6)

Work orders specifying job authorizations and a record of work accomplished that can be used to record actual labor and material costs.

(7)

Reports and special analyses that compare planned versus actual accomplishments and costs and that can be used to evaluate maintenance operations.

Source credit: (Pub. L. 113–287, § 3, Dec. 19, 2014, 128 Stat. 3123.)

history & why it existsrecord from the source credit
  • 2014Enacted · Pub. L. 113-287 · 128 Stat. 3123

A history note hasn’t been published yet. The record shows enactment by Pub. L. 113-287 on 2014-12-19.

all 0 arguments · sorted by: best

0/280

no arguments yet — make the first case